REOI · Uzbekistan

TA-6804 UZB: Preparing Road Modernization Projects - 2026-Firm-RS Pilot Road Safety Consultant (E-055157-001)

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official CSRN directory ↗
Submission deadline
Country
Uzbekistan
Employer
دستگاه اجرایی پروژه تأمین‌مالی‌شده توسط ADB
Notice reference
E-055157-001

Open the official listing and related documents — Find this assignment by its title, then select View CSRN to read its Profile and Terms of Reference.

SOURCE-BACKED SCREENING

Project objective and employer selection criteria

Official notice · High confidence

1. Project objective

Objective and Purpose of the Assignment

To support preparation of the road safety component of the CAREC Corridors 2 and 6 Road

Modernization and Safety Project by providing specialized road safety assessments, designs, cost

estimates, and technical inputs for inclusion in project appraisal and loan documentation.

The consultant will:

- Establish road safety performance targets for the project road using the iRAP Star Rating for

Designs (SR4D) methodology.

- Identify and design pilot road safety improvement sections and prepare investment-grade treatment

designs and cost estimates.

- Develop road safety measures consistent with Safe System principles and the UNRSF/CAREC Design

Guidance.

- Assess regulatory compatibility of proposed road safety treatments with Uzbekistan's road design

standards.

- Prepare replicable road safety tools, guidelines, training concepts, and technical specifications

to support wider application across the national road network.

- Provide technical evidence and cost inputs required for ADB due diligence, fact-finding, project

appraisal, and loan processing

Expertise or Positions Needed

International

Team Leadership from International Experts

Expertise or Position Minimum inputs in PM Primary Place of Assignment

1 International Road Safety Engineer / Team Leader 3 Tashkent, Uzbekistan Search and Select: Place of Assignment

2 International iRAP assessor 0.5 Tashkent, Uzbekistan Search and Select: Place of Assignment

National

Team Leadership from National Experts

Expertise or Position Minimum inputs in PM Primary Place of Assignment

1 National Road Safety Engineer 4.5 Tashkent, Uzbekistan Search and Select: Place of Assignment

2 National Highway / Civil Engineer 4.5 Tashkent, Uzbekistan Search and Select: Place of Assignment

TOR Attachments

Title Type Description Category Last Updated By Last Updated Update Delete

ToR for Pilot Road Safety Consultant under TA6804-UZB File Terms of Reference CSRN Terms of Reference SYSADMIN 18-Sep-2026

Export to PDF

Export to PDF

Export to PDF

Copyright (c) 1998, 2023, Oracle and/or its affiliates.

All rights reserved.

Copyright (c) 1998, 2023, Oracle and/or its affiliates.

All rights reserved.

Pick a Date

Loading...

Loading...

Important stated figures and their meaning
Stated service / contract estimate or feeUSD 204,740
Source / meaning
Consulting Services Budget USD 204,740
سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — official notice / tender document
Stated figure — see its source context2 an
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — official notice / tender document
View the official objective and scope excerpt
Objective and Purpose of the Assignment To support preparation of the road safety component of the CAREC Corridors 2 and 6 Road Modernization and Safety Project by providing specialized road safety assessments, designs, cost estimates, and technical inputs for inclusion in project appraisal and loan documentation. The consultant will: - Establish road safety performance targets for the project road using the iRAP Star Rating for Designs (SR4D) methodology. - Identify and design pilot road safety improvement sections and prepare investment-grade treatment designs and cost estimates. - Develop road safety measures consistent with Safe System principles and the UNRSF/CAREC Design Guidance. - Assess regulatory compatibility of proposed road safety treatments with Uzbekistan's road design standards. - Prepare replicable road safety tools, guidelines, training concepts, and technical specifications to support wider application across the national road network. - Provide technical evidence and cost inputs required for ADB due diligence, fact-finding, project appraisal, and loan processing Expertise or Positions Needed International Team Leadership from International Experts Expertise or Position Minimum inputs in PM Primary Place of Assignment 1 International Road Safety Engineer / Team Leader 3 Tashkent, Uzbekistan Search and Select: Place of Assignment 2 International iRAP assessor 0.5 Tashkent, Uzbekistan Search and Select: Place of Assignment National Team Leadership from National Experts Expertise or Position Minimum inputs in PM Primary Place of Assignment 1 National Road Safety Engineer 4.5 Tashkent, Uzbekistan Search and Select: Place of Assignment 2 National Highway / Civil Engineer 4.5 Tashkent, Uzbekistan Search and Select: Place of Assignment TOR Attachments Title Type Description Category Last Updated By Last Updated Update Delete ToR for Pilot Road Safety Consultant under TA6804-UZB File Terms of Reference CSRN Terms of Reference SYSADMIN 18-Sep-2026 Export to PDF Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Pick a Date Loading... Loading...

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Qualification information is incomplete; scoring is paused.

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.