REOI · چندکشوری

TA-10820 REG: Supporting Project Implementation and Capacity Building in Water and Urban Development in the Pacific (Subproject 1) - Wastewater Treatment Process Specialist (E-059047-002)

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official CSRN directory ↗
Submission deadline
Country
چندکشوری
Employer
دستگاه اجرایی پروژه تأمین‌مالی‌شده توسط ADB
Notice reference
E-059047-002

Open the official listing and related documents — Find this assignment by its title, then select View CSRN to read its Profile and Terms of Reference.

SOURCE-BACKED SCREENING

Project objective and employer selection criteria

Official notice · High confidence

1. Project objective

Objective and Purpose of the Assignment

(i) Efficient, effective, and sustainable wastewater treatment to protect and enhance human and

environmental health in Koror.

(ii) Ensure that the capacity of Koror’s wastewater treatment plant can accommodate Koror’s sewage load

growth to 2036 (primarily due to new tourism infrastructure developments) while meeting Palau’s

environmental quality and protection standards.

Scope of Work

Assist the Palau Public Utilities Corporation implement upgrades to the Malakal wastewater treatment

plant required to: (i) maximize the treatment plant efficiency, and (ii) meet Palau’s environmental

standards for wastewater effluent and wastewater treatment plant sludge treatment and disposal.

Detailed Tasks and/or Expected Output

1.

Assessment and Diagnostic Review

(i) Review existing wastewater treatment plant (WWTP) infrastructure, process design, operational

performance, maintenance practices, and regulatory compliance status.

(ii) Assess the condition and performance of the sequencing batch reactor (SBR), inlet works, sludge

handling facilities, aeration systems, instrumentation, electrical systems, and ancillary assets.

(iii) Conduct process audits, identify operational bottlenecks, capacity constraints, energy

inefficiencies, and causes of non-compliance with effluent discharge standards.

(iv) Review historical operational data, laboratory results, maintenance records, and environmental

monitoring reports.

(v) Identifying deficiencies, risks, rehabilitation requirements, and priority investments required to

meet environmental discharge standards.

2.

Process Design and Rehabilitation Planning

(i) Where appropriate, identify necessary modifications to improve treatment performance and reliability

and to achieve the environmental discharge standards.

(ii) Optimize biological nutrient removal, aeration efficiency, sludge management, and process control

systems.

(iii) Where appropriate, recommend upgrades to instrumentation, automation, supervisory control and data

acquisition (SCADA), and monitoring equipment.

3.

Procurement and Construction Support

(i) Assist the PPUC in evaluating bids and assessing compliance of proposed equipment and process

solutions.

(ii) Review contractor process designs, shop drawings, commissioning plans, and equipment submittals.

(iii) Provide technical advice during construction and installation activities.

(iv) Participate in inspections, testing, and acceptance of process equipment and systems.

4.

Commissioning and Performance Verification

(i) Develop commissioning protocols and process start-up procedures.

(ii) Assist PPUC to supervise the commissioning of rehabilitated treatment facilities and process

equipment.

(iii) Optimize operating parameters, including aeration cycles, sludge age, mixed liquor concentrations,

settling performance, and decanting operations.

(iv) Verify achievement of process performance guarantees, capacity requirements, and treated effluent

standards.

(v) Identify and rectify process deficiencies observed during commissioning and initial operation.

5.

Operations and Maintenance Improvement

(i) Assist PPUC to strengthen Plant operational and maintenance practices.

(ii) Update (or where required develop) standard operating procedures (SOPs) for key treatment processes

and equipment.

(iii) Assist PPUC to prepare and strengthen preventive and predictive maintenance programs for

mechanical, electrical, and process equipment.

(iv) Assist PPUC to prepare and strengthen process monitoring protocols and laboratory quality assurance

procedures.

(v) Identify measures to reduce operating costs, energy consumption, chemical usage, and sludge

management costs.

6.

Capacity Building and Training

(i) Deliver classroom and hands-on training on:

(a) SBR process fundamentals.

(b) Process monitoring and control.

(c) Laboratory testing and interpretation.

(d) Sludge management.

(e) Preventive maintenance.

(f) Electrical and mechanical systems.

(g) Occupational health and safety.

(h) Environmental compliance monitoring.

(ii) Provide on-the-job mentoring and coaching during commissioning and initial operation.

7.

Environmental Compliance and Sustainability

(i) Strengthen PPUC’s monitoring programs to verify compliance with environmental permits and discharge

standards.

(ii) Assist PPUC in implementing environmental management and reporting systems.

(iii) Assist PPUC to strengthen sludge management and disposal strategies consistent with environmental

regulations.

(iv) Support the development and updating of long-term operational budgets and lifecycle cost

assessments.

8.

Institutional Strengthening

(i) Review utility organizational arrangements related to PPUC’s wastewater treatment operations.

(ii) Recommend staffing requirements, roles, competencies, and succession planning measures.

(iii) Strengthen the PPUC’s ability to independently manage and optimize treatment plant operations

after completion of the assignment.

Minimum Qualification Requirements

The Consultant will have at minimum, a bachelor's degree in environmental engineering, process or

chemical engineering, chemistry, or other relevant qualification and at least 15 years' experience in

designing and implementing water quality monitoring programs and analyzing water quality data.

Experience obtained in Pacific Islands developing countries is essential.

Minimum General Experience 15

Years

Minimum Specific Experience (relevant to assignment) 15

Years

Regional/Country Experience Required

Desired

Not Required

Deliverables

Details Name Type Estimated Submission Date

Monthly Progress Report No. 1 Report 30-Oct-2026

Monthly Progress Report No. 2 Report 30-Nov-2026

Monthly Progress Report No. 3 Report 31-Dec-2026

Monthly Progress Report No. 4 Report 31-Jan-2027

Monthly Progress Report No. 5 Report 28-Feb-2027

Monthly Progress Report No. 6 Final Report 31-Mar-2027

Schedule and Places of Assignment (chronological and inclusive of travel)

Schedule Type Continuous

Intermittent

Max.

Working Days/Week Home Office 5

Field 6

City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others)

Home Office, Other Search and Select: Place

4 15-Oct-2026 30-Oct-2026

Koror, Palau Search and Select: Place

13 01-Nov-2026 20-Nov-2026

Home Office, Other Search and Select: Place

4 21-Nov-2026 30-Nov-2026

Koror, Palau Search and Select: Place

13 01-Dec-2026 15-Dec-2026

Home Office, Other Search and Select: Place

4 16-Dec-2026 15-Jan-2027

Koror, Palau Search and Select: Place

13 16-Jan-2027 30-Jan-2027

Home Office, Other Search and Select: Place

4 01-Feb-2027 31-Mar-2027

Total

55

Export to PDF

Export to PDF

Copyright (c) 1998, 2023, Oracle and/or its affiliates.

All rights reserved.

Copyright (c) 1998, 2023, Oracle and/or its affiliates.

All rights reserved.

Pick a Date

Loading...

Loading...

Scope of services

Assist the Palau Public Utilities Corporation implement upgrades to the Malakal wastewater treatment plant required to: (i) maximize the treatment plant efficiency, and (ii) meet Palau’s environmental standards for wastewater effluent and wastewater treatment plant sludge treatment and disposal. Detailed Tasks and/or Expected Output 1. Assessment and Diagnostic Review (i) Review existing wastewater treatment plant (WWTP) infrastructure, process design, operational performance, maintenance practices, and regulatory compliance status. (ii) Assess the condition and performance of the sequencing batch reactor (SBR), inlet works, sludge handling facilities, aeration systems, instrumentation, electrical systems, and ancillary assets. (iii) Conduct process audits, identify operational bottlenecks, capacity constraints, energy inefficiencies, and causes of non-compliance with effluent discharge standards. (iv) Review historical operational data, laboratory results, maintenance records, and environmental monitoring reports. (v) Identifying deficiencies, risks, rehabilitation requirements, and priority investments required to meet environmental discharge standards. 2. Process Design and Rehabilitation Planning (i) Where appropriate, identify necessary modifications to improve treatment performance and reliability and to achieve the environmental discharge standards. (ii) Optimize biological nutrient removal, aeration efficiency, sludge management, and process control systems. (iii) Where appropriate, recommend upgrades to instrumentation, automation, supervisory control and data acquisition (SCADA), and monitoring equipment. 3. Procurement and Construction Support (i) Assist the PPUC in evaluating bids and assessing compliance of proposed equipment and process solutions. (ii) Review contractor process designs, shop drawings, commissioning plans, and equipment submittals. (iii) Provide technical advice during construction and installation activities. (iv) Participate in inspections, testing, and acceptance of process equipment and systems. 4. Commissioning and Performance Verification (i) Develop commissioning protocols and process start-up procedures. (ii) Assist PPUC to supervise the commissioning of rehabilitated treatment facilities and process equipment. (iii) Optimize operating parameters, including aeration cycles, sludge age, mixed liquor concentrations, settling performance, and decanting operations. (iv) Verify achievement of process performance guarantees, capacity requirements, and treated effluent standards. (v) Identify and rectify process deficiencies observed during commissioning and initial operation. 5. Operations and Maintenance Improvement (i) Assist PPUC to strengthen Plant operational and maintenance practices. (ii) Update (or where required develop) standard operating procedures (SOPs) for key treatment processes and equipment. (iii) Assist PPUC to prepare and strengthen preventive and predictive maintenance programs for mechanical, electrical, and process equipment. (iv) Assist PPUC to prepare and strengthen process monitoring protocols and laboratory quality assurance procedures. (v) Identify measures to reduce operating costs, energy consumption, chemical usage, and sludge management costs. 6. Capacity Building and Training (i) Deliver classroom and hands-on training on: (a) SBR process fundamentals. (b) Process monitoring and control. (c) Laboratory testing and interpretation. (d) Sludge management. (e) Preventive maintenance. (f) Electrical and mechanical systems. (g) Occupational health and safety. (h) Environmental compliance monitoring. (ii) Provide on-the-job mentoring and coaching during commissioning and initial operation. 7. Environmental Compliance and Sustainability (i) Strengthen PPUC’s monitoring programs to verify compliance with environmental permits and discharge standards. (ii) Assist PPUC in implementing environmental management and reporting systems. (iii) Assist PPUC to strengthen sludge management and disposal strategies consistent with environmental regulations. (iv) Support the development and updating of long-term operational budgets and lifecycle cost assessments. 8. Institutional Strengthening (i) Review utility organizational arrangements related to PPUC’s wastewater treatment operations. (ii) Recommend staffing requirements, roles, competencies, and succession planning measures. (iii) Strengthen the PPUC’s ability to independently manage and optimize treatment plant operations after completion of the assignment. Minimum Qualification Requirements The Consultant will have at minimum, a bachelor's degree in environmental engineering, process or chemical engineering, chemistry, or other relevant qualification and at least 15 years' experience in designing and implementing water quality monitoring programs and analyzing water quality data. Experience obtained in Pacific Islands developing countries is essential. Minimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 15 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Progress Report No. 1 Report 30-Oct-2026 Monthly Progress Report No. 2 Report 30-Nov-2026 Monthly Progress Report No. 3 Report 31-Dec-2026 Monthly Progress Report No. 4 Report 31-Jan-2027 Monthly Progress Report No. 5 Report 28-Feb-2027 Monthly Progress Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 4 15-Oct-2026 30-Oct-2026 Koror, Palau Search and Select: Place 13 01-Nov-2026 20-Nov-2026 Home Office, Other Search and Select: Place 4 21-Nov-2026 30-Nov-2026 Koror, Palau Search and Select: Place 13 01-Dec-2026 15-Dec-2026 Home Office, Other Search and Select: Place 4 16-Dec-2026 15-Jan-2027 Koror, Palau Search and Select: Place 13 16-Jan-2027 30-Jan-2027 Home Office, Other Search and Select: Place 4 01-Feb-2027 31-Mar-2027 Total 55 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Pick a Date Loading... Loading...

Exact source section
Assist the Palau Public Utilities Corporation implement upgrades to the Malakal wastewater treatment plant required to: (i) maximize the treatment plant efficiency, and (ii) meet Palau’s environmental standards for wastewater effluent and wastewater treatment plant sludge treatment and disposal. Detailed Tasks and/or Expected Output 1. Assessment and Diagnostic Review (i) Review existing wastewater treatment plant (WWTP) infrastructure, process design, operational performance, maintenance practices, and regulatory compliance status. (ii) Assess the condition and performance of the sequencing batch reactor (SBR), inlet works, sludge handling facilities, aeration systems, instrumentation, electrical systems, and ancillary assets. (iii) Conduct process audits, identify operational bottlenecks, capacity constraints, energy inefficiencies, and causes of non-compliance with effluent discharge standards. (iv) Review historical operational data, laboratory results, maintenance records, and environmental monitoring reports. (v) Identifying deficiencies, risks, rehabilitation requirements, and priority investments required to meet environmental discharge standards. 2. Process Design and Rehabilitation Planning (i) Where appropriate, identify necessary modifications to improve treatment performance and reliability and to achieve the environmental discharge standards. (ii) Optimize biological nutrient removal, aeration efficiency, sludge management, and process control systems. (iii) Where appropriate, recommend upgrades to instrumentation, automation, supervisory control and data acquisition (SCADA), and monitoring equipment. 3. Procurement and Construction Support (i) Assist the PPUC in evaluating bids and assessing compliance of proposed equipment and process solutions. (ii) Review contractor process designs, shop drawings, commissioning plans, and equipment submittals. (iii) Provide technical advice during construction and installation activities. (iv) Participate in inspections, testing, and acceptance of process equipment and systems. 4. Commissioning and Performance Verification (i) Develop commissioning protocols and process start-up procedures. (ii) Assist PPUC to supervise the commissioning of rehabilitated treatment facilities and process equipment. (iii) Optimize operating parameters, including aeration cycles, sludge age, mixed liquor concentrations, settling performance, and decanting operations. (iv) Verify achievement of process performance guarantees, capacity requirements, and treated effluent standards. (v) Identify and rectify process deficiencies observed during commissioning and initial operation. 5. Operations and Maintenance Improvement (i) Assist PPUC to strengthen Plant operational and maintenance practices. (ii) Update (or where required develop) standard operating procedures (SOPs) for key treatment processes and equipment. (iii) Assist PPUC to prepare and strengthen preventive and predictive maintenance programs for mechanical, electrical, and process equipment. (iv) Assist PPUC to prepare and strengthen process monitoring protocols and laboratory quality assurance procedures. (v) Identify measures to reduce operating costs, energy consumption, chemical usage, and sludge management costs. 6. Capacity Building and Training (i) Deliver classroom and hands-on training on: (a) SBR process fundamentals. (b) Process monitoring and control. (c) Laboratory testing and interpretation. (d) Sludge management. (e) Preventive maintenance. (f) Electrical and mechanical systems. (g) Occupational health and safety. (h) Environmental compliance monitoring. (ii) Provide on-the-job mentoring and coaching during commissioning and initial operation. 7. Environmental Compliance and Sustainability (i) Strengthen PPUC’s monitoring programs to verify compliance with environmental permits and discharge standards. (ii) Assist PPUC in implementing environmental management and reporting systems. (iii) Assist PPUC to strengthen sludge management and disposal strategies consistent with environmental regulations. (iv) Support the development and updating of long-term operational budgets and lifecycle cost assessments. 8. Institutional Strengthening (i) Review utility organizational arrangements related to PPUC’s wastewater treatment operations. (ii) Recommend staffing requirements, roles, competencies, and succession planning measures. (iii) Strengthen the PPUC’s ability to independently manage and optimize treatment plant operations after completion of the assignment. Minimum Qualification Requirements The Consultant will have at minimum, a bachelor's degree in environmental engineering, process or chemical engineering, chemistry, or other relevant qualification and at least 15 years' experience in designing and implementing water quality monitoring programs and analyzing water quality data. Experience obtained in Pacific Islands developing countries is essential. Minimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 15 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Progress Report No. 1 Report 30-Oct-2026 Monthly Progress Report No. 2 Report 30-Nov-2026 Monthly Progress Report No. 3 Report 31-Dec-2026 Monthly Progress Report No. 4 Report 31-Jan-2027 Monthly Progress Report No. 5 Report 28-Feb-2027 Monthly Progress Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 4 15-Oct-2026 30-Oct-2026 Koror, Palau Search and Select: Place 13 01-Nov-2026 20-Nov-2026 Home Office, Other Search and Select: Place 4 21-Nov-2026 30-Nov-2026 Koror, Palau Search and Select: Place 13 01-Dec-2026 15-Dec-2026 Home Office, Other Search and Select: Place 4 16-Dec-2026 15-Jan-2027 Koror, Palau Search and Select: Place 13 16-Jan-2027 30-Jan-2027 Home Office, Other Search and Select: Place 4 01-Feb-2027 31-Mar-2027 Total 55 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Pick a Date Loading... Loading...
Important stated figures and their meaning
Stated service / contract estimate or feeUSD 80,000
Source / meaning
Consulting Services Budget USD 80,000
سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — official notice / tender document
Required experience≥ 15 years
Source / meaning
chemical engineering, chemistry, or other relevant qualification and at least 15 years' experience in
سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — official notice / tender document

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Qualification criteria reviewed. Check the latest tender documents before submission.
1

A — Organizational experience and structure

  • Minimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 15 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Progress Report No. 1 Report 30-Oct-2026 Monthly Progress Report No. 2 Report 30-Nov-2026 Monthly Progress Report No. 3 Report 31-Dec-2026 Monthly Progress Report No. 4 Report 31-Jan-2027 Monthly Progress Report No. 5 Report 28-Feb-2027 Monthly Progress Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 4 15-Oct-2026 30-Oct-2026 Koror, Palau Search and Select: Place 13 01-Nov-2026 20-Nov-2026 Home Office, Other Search and Select: Place 4 21-Nov-2026 30-Nov-2026 Koror, Palau Search and Select: Place 13 01-Dec-2026 15-Dec-2026 Home Office, Other Search and Select: Place 4 16-Dec-2026 15-Jan-2027 Koror, Palau Search and Select: Place 13 16-Jan-2027 30-Jan-2027 Home Office, Other Search and Select: Place 4 01-Feb-2027 31-Mar-2027 Total 55 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved.

    Shortlisting stage
Source clauses for this group
  1. Minimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 15 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Progress Report No. 1 Report 30-Oct-2026 Monthly Progress Report No. 2 Report 30-Nov-2026 Monthly Progress Report No. 3 Report 31-Dec-2026 Monthly Progress Report No. 4 Report 31-Jan-2027 Monthly Progress Report No. 5 Report 28-Feb-2027 Monthly Progress Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 4 15-Oct-2026 30-Oct-2026 Koror, Palau Search and Select: Place 13 01-Nov-2026 20-Nov-2026 Home Office, Other Search and Select: Place 4 21-Nov-2026 30-Nov-2026 Koror, Palau Search and Select: Place 13 01-Dec-2026 15-Dec-2026 Home Office, Other Search and Select: Place 4 16-Dec-2026 15-Jan-2027 Koror, Palau Search and Select: Place 13 16-Jan-2027 30-Jan-2027 Home Office, Other Search and Select: Place 4 01-Feb-2027 31-Mar-2027 Total 55 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
3

C — Similar assignments

  • The Consultant will have at minimum, a bachelor's degree in environmental engineering, process or chemical engineering, chemistry, or other relevant qualification and at least 15 years' experience in designing and implementing water quality monitoring programs and analyzing water quality data. Experience obtained in Pacific Islands developing countries is essential.

    Shortlisting stage
  • Minimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 15 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Progress Report No. 1 Report 30-Oct-2026 Monthly Progress Report No. 2 Report 30-Nov-2026 Monthly Progress Report No. 3 Report 31-Dec-2026 Monthly Progress Report No. 4 Report 31-Jan-2027 Monthly Progress Report No. 5 Report 28-Feb-2027 Monthly Progress Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max.

    Shortlisting stage
Source clauses for this group
  1. The Consultant will have at minimum, a bachelor's degree in environmental engineering, process or chemical engineering, chemistry, or other relevant qualification and at least 15 years' experience in designing and implementing water quality monitoring programs and analyzing water quality data. Experience obtained in Pacific Islands developing countries is essential.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  2. Minimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 15 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Progress Report No. 1 Report 30-Oct-2026 Monthly Progress Report No. 2 Report 30-Nov-2026 Monthly Progress Report No. 3 Report 31-Dec-2026 Monthly Progress Report No. 4 Report 31-Jan-2027 Monthly Progress Report No. 5 Report 28-Feb-2027 Monthly Progress Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.