REOI · Pakistan

LOAN-6042 PAK: Khyber Pakhtunkhwa Cities Improvement Projects - Second Project Readiness Financing - KPCIP-PRF2-UT-CS-01 Consultancy Services for Preparation of Greater Peshawar Urban Transport Master Plan (GPUTM)-2050 (E-055107-001)

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official CSRN directory ↗
Submission deadline
Country
Pakistan
Employer
دستگاه اجرایی پروژه تأمین‌مالی‌شده توسط ADB
Notice reference
E-055107-001

Open the official listing and related documents — Find this assignment by its title, then select View CSRN to read its Profile and Terms of Reference.

SOURCE-BACKED SCREENING

Project objective and employer selection criteria

Official notice · High confidence

1. Project objective

Objective and Purpose of the Assignment

Khyber Pakhtunkhwa Cities Improvement Projects (KPCIP) – Second Project Readiness Financing (PRF)

will finance eligible project preparation and design activities of ensuing urban development and

urban mobility projects.

The ensuing projects will assist the Government of Pakistan to improve the

quality of life of urban residents in Khyber Pakhtunkhwa province (KP).

The Consultancy Services for Greater Peshawar Urban Transport Master Plan – 2050, by delivering the

following outputs as well as the details mentioned in the TORs:

Task 1: Review of Baseline Policies, Development Plans, and Past Studies

Task 2: Data Collection

Task 3: Analysis of Baseline Situation

Task 4: Formulation of Planning Frameworks

Task 5: Development of Travel Demand Model for Peshawar

Task 6: Update the Transport System Database

Task 7: Urban Transport Policy Development

Task 8: Review and Update the Public Transport and Road Network Development Plans

Task 9: Review and Update the Transport and Traffic Demand Management plan

Task 10: Review and Update the Mass Transit Network Development Plan

Task 11: Existing industry restructuring strategies

Task 12: Development of Improvement Plan for Urban Railway Services

Task 13: Development of Urban Transport Strategies

Task 14: Urban Transport Master Plan 2050

Task 15: Development of Screening Criteria for Selecting Priority Projects

Task 16.

Priority Mass Transit Project Identification

Task 17: Feasibility Studies for High-Priority Corridor(s)

Task 18: Peshawar Valley Railway Project (PVRP) Feasibility Study

Task 19: Development of Institutional Reform Plan for Urban Transport Sector of Peshawar

Task 20: Development of Detailed Capacity Development Program

KPUMA is seeking Expressions of Interest (EOI) from reputable consulting firms to carry out the

Consultancy Services for Greater Peshawar Urban Transport Master Plan (GPUTMP) - 2050.

Selection of

consulting firm(s) will be governed by ADB’s Procurement Policy and ADB’s Procurement Directive for

ADB Borrowers (2026, as amended from time to time).

Expertise or Positions Needed

International

Team Leadership from International Experts

Expertise or Position Minimum inputs in PM Primary Place of Assignment

1 Team Leader, Transport Master Planning Specialist 14 Search and Select: Place of Assignment

2 Transport Financial Specialist / Transport Economist 6 Search and Select: Place of Assignment

3 TOD and / or VCF Expert 5 Search and Select: Place of Assignment

4 NMT Expert 3 Search and Select: Place of Assignment

5 Lead Policy Expert 6 Search and Select: Place of Assignment

6 Railway Civil & Alignment Engineer 6 Search and Select: Place of Assignment

7 Lead Logistic Transport Expert 6 Search and Select: Place of Assignment

8 Lead Institutional Expert 6 Search and Select: Place of Assignment

9 Urban Railway Specialist 6 Search and Select: Place of Assignment

10 Senior Railway Systems Expert 6 Search and Select: Place of Assignment

11 Railway operations & Service Planning Expert 4 Search and Select: Place of Assignment

12 Lead EV Policy Specialist 2 Search and Select: Place of Assignment

Team Leadership from International Experts

National

Team Leadership from National Experts

Expertise or Position Minimum inputs in PM Primary Place of Assignment

1 Deputy Team Leader, Transport Specialist 18 Search and Select: Place of Assignment

2 Utility & ROW / Land Acquisition Specialist 3 Search and Select: Place of Assignment

3 Transport Planning Expert 6 Search and Select: Place of Assignment

4 Transport Modeller 6 Search and Select: Place of Assignment

5 Traffic Survey Expert 6 Search and Select: Place of Assignment

6 Socio Economic Survey Expert 5 Search and Select: Place of Assignment

7 Legal & Regulatory Expert 8 Search and Select: Place of Assignment

8 Transport Safety Expert 5 Search and Select: Place of Assignment

9 Logistics Transport Expert 6 Search and Select: Place of Assignment

10 Public Private Partnership Specialist 6 Search and Select: Place of Assignment

11 Infrastructure Engineer 8 Search and Select: Place of Assignment

12 Architect 8 Search and Select: Place of Assignment

13 Transport Economist 6 Search and Select: Place of Assignment

14 Financial Expert 6 Search and Select: Place of Assignment

15 Climate Change Specialist 5 Search and Select: Place of Assignment

16 Institutional Specialist 8 Search and Select: Place of Assignment

17 Social Safeguard Expert 6 Search and Select: Place of Assignment

18 Gender Expert 6 Search and Select: Place of Assignment

19 Communication Specialist 8 Search and Select: Place of Assignment

20 Senior Procurement / Contract Manager 6 Search and Select: Place of Assignment

21 Transport Policy Expert 8 Search and Select: Place of Assignment

22 EV Policy Specialist 2 Search and Select: Place of Assignment

23 Environment Expert 6 Search and Select: Place of Assignment

24 Railway Engineer (Civil/Track) 6 Search and Select: Place of Assignment

25 Railway Operations Expert 6 Search and Select: Place of Assignment

26 GIS / Mapping & Spatial Analysis Specialist 3 Search and Select: Place of Assignment

27 Urban Planning & Development Expert 6 Search and Select: Place of Assignment

Team Leadership from National Experts

TOR Attachments

Title Type Description Category Last Updated By Last Updated Update Delete

scope of services, and their role in the assignment (Lead Firm, Joint Venture Partner, or Subconsultant), to facilitate

appropriate evaluation of their experience.

Important stated figures and their meaning
Stated service / contract estimate or feeUSD 2,931,000
Source / meaning
Consulting Services Budget USD 2,931,000
سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — official notice / tender document
View the official objective and scope excerpt
Objective and Purpose of the Assignment Khyber Pakhtunkhwa Cities Improvement Projects (KPCIP) – Second Project Readiness Financing (PRF) will finance eligible project preparation and design activities of ensuing urban development and urban mobility projects. The ensuing projects will assist the Government of Pakistan to improve the quality of life of urban residents in Khyber Pakhtunkhwa province (KP). The Consultancy Services for Greater Peshawar Urban Transport Master Plan – 2050, by delivering the following outputs as well as the details mentioned in the TORs: Task 1: Review of Baseline Policies, Development Plans, and Past Studies Task 2: Data Collection Task 3: Analysis of Baseline Situation Task 4: Formulation of Planning Frameworks Task 5: Development of Travel Demand Model for Peshawar Task 6: Update the Transport System Database Task 7: Urban Transport Policy Development Task 8: Review and Update the Public Transport and Road Network Development Plans Task 9: Review and Update the Transport and Traffic Demand Management plan Task 10: Review and Update the Mass Transit Network Development Plan Task 11: Existing industry restructuring strategies Task 12: Development of Improvement Plan for Urban Railway Services Task 13: Development of Urban Transport Strategies Task 14: Urban Transport Master Plan 2050 Task 15: Development of Screening Criteria for Selecting Priority Projects Task 16. Priority Mass Transit Project Identification Task 17: Feasibility Studies for High-Priority Corridor(s) Task 18: Peshawar Valley Railway Project (PVRP) Feasibility Study Task 19: Development of Institutional Reform Plan for Urban Transport Sector of Peshawar Task 20: Development of Detailed Capacity Development Program KPUMA is seeking Expressions of Interest (EOI) from reputable consulting firms to carry out the Consultancy Services for Greater Peshawar Urban Transport Master Plan (GPUTMP) - 2050. Selection of consulting firm(s) will be governed by ADB’s Procurement Policy and ADB’s Procurement Directive for ADB Borrowers (2026, as amended from time to time). Expertise or Positions Needed International Team Leadership from International Experts Expertise or Position Minimum inputs in PM Primary Place of Assignment 1 Team Leader, Transport Master Planning Specialist 14 Search and Select: Place of Assignment 2 Transport Financial Specialist / Transport Economist 6 Search and Select: Place of Assignment 3 TOD and / or VCF Expert 5 Search and Select: Place of Assignment 4 NMT Expert 3 Search and Select: Place of Assignment 5 Lead Policy Expert 6 Search and Select: Place of Assignment 6 Railway Civil & Alignment Engineer 6 Search and Select: Place of Assignment 7 Lead Logistic Transport Expert 6 Search and Select: Place of Assignment 8 Lead Institutional Expert 6 Search and Select: Place of Assignment 9 Urban Railway Specialist 6 Search and Select: Place of Assignment 10 Senior Railway Systems Expert 6 Search and Select: Place of Assignment 11 Railway operations & Service Planning Expert 4 Search and Select: Place of Assignment 12 Lead EV Policy Specialist 2 Search and Select: Place of Assignment Team Leadership from International Experts National Team Leadership from National Experts Expertise or Position Minimum inputs in PM Primary Place of Assignment 1 Deputy Team Leader, Transport Specialist 18 Search and Select: Place of Assignment 2 Utility & ROW / Land Acquisition Specialist 3 Search and Select: Place of Assignment 3 Transport Planning Expert 6 Search and Select: Place of Assignment 4 Transport Modeller 6 Search and Select: Place of Assignment 5 Traffic Survey Expert 6 Search and Select: Place of Assignment 6 Socio Economic Survey Expert 5 Search and Select: Place of Assignment 7 Legal & Regulatory Expert 8 Search and Select: Place of Assignment 8 Transport Safety Expert 5 Search and Select: Place of Assignment 9 Logistics Transport Expert 6 Search and Select: Place of Assignment 10 Public Private Partnership Specialist 6 Search and Select: Place of Assignment 11 Infrastructure Engineer 8 Search and Select: Place of Assignment 12 Architect 8 Search and Select: Place of Assignment 13 Transport Economist 6 Search and Select: Place of Assignment 14 Financial Expert 6 Search and Select: Place of Assignment 15 Climate Change Specialist 5 Search and Select: Place of Assignment 16 Institutional Specialist 8 Search and Select: Place of Assignment 17 Social Safeguard Expert 6 Search and Select: Place of Assignment 18 Gender Expert 6 Search and Select: Place of Assignment 19 Communication Specialist 8 Search and Select: Place of Assignment 20 Senior Procurement / Contract Manager 6 Search and Select: Place of Assignment 21 Transport Policy Expert 8 Search and Select: Place of Assignment 22 EV Policy Specialist 2 Search and Select: Place of Assignment 23 Environment Expert 6 Search and Select: Place of Assignment 24 Railway Engineer (Civil/Track) 6 Search and Select: Place of Assignment 25 Railway Operations Expert 6 Search and Select: Place of Assignment 26 GIS / Mapping & Spatial Analysis Specialist 3 Search and Select: Place of Assignment 27 Urban Planning & Development Expert 6 Search and Select: Place of Assignment Team Leadership from National Experts TOR Attachments Title Type Description Category Last Updated By Last Updated Update Delete scope of services, and their role in the assignment (Lead Firm, Joint Venture Partner, or Subconsultant), to facilitate appropriate evaluation of their experience.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Qualification information is incomplete; scoring is paused.

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.