TA-10820 REG: Supporting Project Implementation and Capacity Building in Water and Urban Development in the Pacific (Subproject 1) - Project Management Advisor (E-059047-002)
A source-backed decision brief. The official notice and its addenda remain authoritative.
- Submission deadline
- Country
- چندکشوری
- Employer
- دستگاه اجرایی پروژه تأمینمالیشده توسط ADB
- Notice reference
- E-059047-002
Open the official listing and related documents — Find this assignment by its title, then select View CSRN to read its Profile and Terms of Reference.
Project objective and employer selection criteria
1. Project objective
Objective and Purpose of the Assignment
The Palau Public Utilities Corporation is responsible for responsible for the delivery of water supply
and sewage services throughout Palau.
The majority of PPUC’s water supply and sewerage assets are in
Koror and Airai, where about 78% of Palauans reside.
PPUC's sewage network in Koror services over 80% of
Koror population with approximately 3,000 connections.
PPUC has constructed a new sewage treatment plant
(sequencing batch reactor) at Malakal in Koror State and operates a small sewage treatment plant
(membrane batch reactor) in Melekeok State servicing the capital building and surrounding inhabitants.
In Palau’s other states, PPUC does not provide sewerage services.
The Government of Palau and PPUC have embarked upon a project, the Koror-Airai Sanitation Project
(KASP), to upgrade Koror’s sewerage systems.
The project, estimated to cost $32 million to deliver, is
financed by ADB, the Government, and PPUC, is currently being implemented.
The new wastewater treatment
plant at Malakal, financed through KASP, commenced operations in November 2021.
The project also funded
replacement of critical sewer network infrastructure and the refurbishment of sewer pumping stations.
Additional works required to fully commission the sewer network upgrades delivered by the project are
ongoing.
PPUC requires a project management advisor to assist PPUC deliver the additional works required to fully
upgrade the Koror sewerage network and to strengthen PPUC’s project management capacity.
Scope of Work
The project management advisor will assist PPUC’s Project Manager with the overall effective day-to-day
project management of remaining project activities including procurement, contract administration,
construction oversight, and reporting of the project's remaining tasks.
Detailed Tasks and/or Expected Output
The tasks of the Project Management Advisor include:
(a) Project Management
(i) Supporting PPUC's Project Management Unit (PMU) in overseeing and coordinating the overall
implementation of remaining KASP works to fully commission the new Koror sewer system.
(ii) Preparing and periodically updating a prioritized work plan to reflect remaining project
activities, ensuring the tasks and associated timeframes are realistic and achievable;
and updating the
project's performance and monitoring system.
(iii) Providing regular project progress monitoring and reporting, including monthly progress reports,
in accordance with the project performance monitoring system.
(iv) Providing regular, and on-request, briefings to the Minister of Finance, PPUC's Management, and
PPUC’s Project Manager.
(v) Reviewing contractor and vendor claims, including progress claims for payment from civil works
contractor and suppliers, and ensuring these are in order, recommend endorsement of payments to PPUC’s
Project Manager.
(vi) Ensuring efficient and effective implementation of remaining project activities including
troubleshooting, as required, to address actual and emerging project risks.
(vii) Assisting PPUC to manage the public relations aspects of the project;
and work in collaboration
with PPUC's Public Relations Officer, and relevant stakeholders to ensure effective dissemination of
project information to key stakeholders and the broader community in Palau;
(viii) Ensuring the implementation of environmental mitigation and monitoring measures as specified in
construction environmental monitoring plans and the timely submission of the project semi-annual
safeguards reports of acceptable quality.
(ix) Maintaining strong relationships with key stakeholders, through the development and implementation
of the stakeholder engagement and management plan.
(x) Provide coaching and mentoring to PMU staff using best project management practice.
(xi) Other project management tasks as reasonably requested by PPUC’s Project Manager and PPUC’s Chief
Executive Officer.
(b) Contract Management Tasks
(i) Monitoring contractor compliance with the contract terms and program and, where necessary issue
corrective notices to contractors to ensure the delivery of works and good to time and to budget.
(ii) Overseeing effective and regular supervision of works, including quality control tests to ensuring
that the works are executed in accordance with the Contract's technical specifications, procedures, and
approved designs and compliance with the construction environmental management and monitoring plan
(CEMP) and the construction schedule.
(iii) Assist PPUC’s Project Manager in administering works and goods contracts, including the processing
of progress certificates, review of extension of time and other claims, preparation of change orders,
and non-conformance notices;
and rigorous monitoring of contract implementation progress and cost
monitoring;
(iv) Reviewing contractor shop drawings and calculations, checking arrangements to ensure optimized
operation and maintenance, and verifying compliance with contract specifications.
(v) Reviewing equipment manufacturers' drawings and calculations to check arrangements for optimized
operation and maintenance and verify compliance with contract specifications.
(vi) Developing and implementing procedures, where required, to ensure adequate control of
manufacturing, factory tests, delivery, and acceptance of materials and equipment.
Overseeing the
unpacking and checking of the materials and equipment, following up on the delivery of delayed
components, and the processing of claims.
(vii) Reviewing proposals for equipment commissioning and acceptance testing and trial operation plans;
(viii) Responding to contractor requests for information in all matters related to interpreting contract
documents, ground survey controls, quality control testing, and other matters relating to the contract
under the project.
(ix) Maintaining a permanent record of all quantities for payment and test results.
(x) Where necessary, coordinating design changes to achieve to-time and to-budget delivery.
(xi) Preparing change orders, and assist with negotiations with the contractor to implement the changes.
Minimum Qualification Requirements
(i) Be an engineering graduate from an accredited college or university;
Registration as a Chartered or
Registered Professional Engineer is highly desirable.
(ii) A minimum of 10 years of experience in project manager role, including contract administration, for
water supply and/or sewerage projects;
(iii) A minimum of 10 years of progressively responsible experience in management, and contract
oversight of large water supply and sewerage projects.
(iv) Possess strong project management skills and ability to work within tight deadlines and budgets.
(v) Have good financial management skills (including preparing and managing project budgets).
(vi) Excellent leadership and people management, facilitation, negotiation, change management and
interpersonal skills.
(vii) Possess strategic planning knowledge and skills.
(viii) Demonstrate the ability to work with and in teams both inside and outside the organization.
(ix) Demonstrate the ability to think strategically to make decisions protecting the interests of the
PPUC
(x) Possess well-developed written and oral communication skills.
Minimum General Experience 10
Years
Minimum Specific Experience (relevant to assignment) 10
Years
Regional/Country Experience Required
Desired
Not Required
Deliverables
Details Name Type Estimated Submission Date
Monthly Report No. 1 Report 31-Oct-2026
Monthly Report No. 2 Report 30-Nov-2026
Monthly Report No. 3 Report 31-Dec-2026
Monthly Report No. 4 Report 31-Jan-2027
Monthly Report No. 5 Report 28-Feb-2027
Monthly Report No. 6 Final Report 31-Mar-2027
Schedule and Places of Assignment (chronological and inclusive of travel)
Schedule Type Continuous
Intermittent
Max.
Working Days/Week Home Office 5
Field 6
City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others)
Home Office, Other Search and Select: Place
5 15-Oct-2026 31-Oct-2026 Dates are indicative only
Koror, Palau Search and Select: Place
10 01-Nov-2026 15-Nov-2026 Dates are indicative only
Home Office, Other Search and Select: Place
5 16-Nov-2026 30-Nov-2026 Dates are indicative only
Koror, Palau Search and Select: Place
10 01-Dec-2026 15-Dec-2026 Dates are indicative only
Home Office, Other Search and Select: Place
5 16-Dec-2026 31-Jan-2027 Dates are indicative only
Koror, Palau Search and Select: Place
10 01-Feb-2027 15-Feb-2027 Dates are indicative only
Home Office, Other Search and Select: Place
5 16-Feb-2027 31-Mar-2027 Dates are indicative only
Total
50
Export to PDF
Export to PDF
Copyright (c) 1998, 2023, Oracle and/or its affiliates.
All rights reserved.
Copyright (c) 1998, 2023, Oracle and/or its affiliates.
All rights reserved.
Pick a Date
Loading...
Loading...
Scope of services
The project management advisor will assist PPUC’s Project Manager with the overall effective day-to-day project management of remaining project activities including procurement, contract administration, construction oversight, and reporting of the project's remaining tasks. Detailed Tasks and/or Expected Output The tasks of the Project Management Advisor include: (a) Project Management (i) Supporting PPUC's Project Management Unit (PMU) in overseeing and coordinating the overall implementation of remaining KASP works to fully commission the new Koror sewer system. (ii) Preparing and periodically updating a prioritized work plan to reflect remaining project activities, ensuring the tasks and associated timeframes are realistic and achievable; and updating the project's performance and monitoring system. (iii) Providing regular project progress monitoring and reporting, including monthly progress reports, in accordance with the project performance monitoring system. (iv) Providing regular, and on-request, briefings to the Minister of Finance, PPUC's Management, and PPUC’s Project Manager. (v) Reviewing contractor and vendor claims, including progress claims for payment from civil works contractor and suppliers, and ensuring these are in order, recommend endorsement of payments to PPUC’s Project Manager. (vi) Ensuring efficient and effective implementation of remaining project activities including troubleshooting, as required, to address actual and emerging project risks. (vii) Assisting PPUC to manage the public relations aspects of the project; and work in collaboration with PPUC's Public Relations Officer, and relevant stakeholders to ensure effective dissemination of project information to key stakeholders and the broader community in Palau; (viii) Ensuring the implementation of environmental mitigation and monitoring measures as specified in construction environmental monitoring plans and the timely submission of the project semi-annual safeguards reports of acceptable quality. (ix) Maintaining strong relationships with key stakeholders, through the development and implementation of the stakeholder engagement and management plan. (x) Provide coaching and mentoring to PMU staff using best project management practice. (xi) Other project management tasks as reasonably requested by PPUC’s Project Manager and PPUC’s Chief Executive Officer. (b) Contract Management Tasks (i) Monitoring contractor compliance with the contract terms and program and, where necessary issue corrective notices to contractors to ensure the delivery of works and good to time and to budget. (ii) Overseeing effective and regular supervision of works, including quality control tests to ensuring that the works are executed in accordance with the Contract's technical specifications, procedures, and approved designs and compliance with the construction environmental management and monitoring plan (CEMP) and the construction schedule. (iii) Assist PPUC’s Project Manager in administering works and goods contracts, including the processing of progress certificates, review of extension of time and other claims, preparation of change orders, and non-conformance notices; and rigorous monitoring of contract implementation progress and cost monitoring; (iv) Reviewing contractor shop drawings and calculations, checking arrangements to ensure optimized operation and maintenance, and verifying compliance with contract specifications. (v) Reviewing equipment manufacturers' drawings and calculations to check arrangements for optimized operation and maintenance and verify compliance with contract specifications. (vi) Developing and implementing procedures, where required, to ensure adequate control of manufacturing, factory tests, delivery, and acceptance of materials and equipment. Overseeing the unpacking and checking of the materials and equipment, following up on the delivery of delayed components, and the processing of claims. (vii) Reviewing proposals for equipment commissioning and acceptance testing and trial operation plans; (viii) Responding to contractor requests for information in all matters related to interpreting contract documents, ground survey controls, quality control testing, and other matters relating to the contract under the project. (ix) Maintaining a permanent record of all quantities for payment and test results. (x) Where necessary, coordinating design changes to achieve to-time and to-budget delivery. (xi) Preparing change orders, and assist with negotiations with the contractor to implement the changes. Minimum Qualification Requirements (i) Be an engineering graduate from an accredited college or university; Registration as a Chartered or Registered Professional Engineer is highly desirable. (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects; (iii) A minimum of 10 years of progressively responsible experience in management, and contract oversight of large water supply and sewerage projects. (iv) Possess strong project management skills and ability to work within tight deadlines and budgets. (v) Have good financial management skills (including preparing and managing project budgets). (vi) Excellent leadership and people management, facilitation, negotiation, change management and interpersonal skills. (vii) Possess strategic planning knowledge and skills. (viii) Demonstrate the ability to work with and in teams both inside and outside the organization. (ix) Demonstrate the ability to think strategically to make decisions protecting the interests of the PPUC (x) Possess well-developed written and oral communication skills. Minimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 5 15-Oct-2026 31-Oct-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Nov-2026 15-Nov-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Nov-2026 30-Nov-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Dec-2026 15-Dec-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Dec-2026 31-Jan-2027 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Feb-2027 15-Feb-2027 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Feb-2027 31-Mar-2027 Dates are indicative only Total 50 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Pick a Date Loading... Loading...
Exact source section
The project management advisor will assist PPUC’s Project Manager with the overall effective day-to-day project management of remaining project activities including procurement, contract administration, construction oversight, and reporting of the project's remaining tasks. Detailed Tasks and/or Expected Output The tasks of the Project Management Advisor include: (a) Project Management (i) Supporting PPUC's Project Management Unit (PMU) in overseeing and coordinating the overall implementation of remaining KASP works to fully commission the new Koror sewer system. (ii) Preparing and periodically updating a prioritized work plan to reflect remaining project activities, ensuring the tasks and associated timeframes are realistic and achievable; and updating the project's performance and monitoring system. (iii) Providing regular project progress monitoring and reporting, including monthly progress reports, in accordance with the project performance monitoring system. (iv) Providing regular, and on-request, briefings to the Minister of Finance, PPUC's Management, and PPUC’s Project Manager. (v) Reviewing contractor and vendor claims, including progress claims for payment from civil works contractor and suppliers, and ensuring these are in order, recommend endorsement of payments to PPUC’s Project Manager. (vi) Ensuring efficient and effective implementation of remaining project activities including troubleshooting, as required, to address actual and emerging project risks. (vii) Assisting PPUC to manage the public relations aspects of the project; and work in collaboration with PPUC's Public Relations Officer, and relevant stakeholders to ensure effective dissemination of project information to key stakeholders and the broader community in Palau; (viii) Ensuring the implementation of environmental mitigation and monitoring measures as specified in construction environmental monitoring plans and the timely submission of the project semi-annual safeguards reports of acceptable quality. (ix) Maintaining strong relationships with key stakeholders, through the development and implementation of the stakeholder engagement and management plan. (x) Provide coaching and mentoring to PMU staff using best project management practice. (xi) Other project management tasks as reasonably requested by PPUC’s Project Manager and PPUC’s Chief Executive Officer. (b) Contract Management Tasks (i) Monitoring contractor compliance with the contract terms and program and, where necessary issue corrective notices to contractors to ensure the delivery of works and good to time and to budget. (ii) Overseeing effective and regular supervision of works, including quality control tests to ensuring that the works are executed in accordance with the Contract's technical specifications, procedures, and approved designs and compliance with the construction environmental management and monitoring plan (CEMP) and the construction schedule. (iii) Assist PPUC’s Project Manager in administering works and goods contracts, including the processing of progress certificates, review of extension of time and other claims, preparation of change orders, and non-conformance notices; and rigorous monitoring of contract implementation progress and cost monitoring; (iv) Reviewing contractor shop drawings and calculations, checking arrangements to ensure optimized operation and maintenance, and verifying compliance with contract specifications. (v) Reviewing equipment manufacturers' drawings and calculations to check arrangements for optimized operation and maintenance and verify compliance with contract specifications. (vi) Developing and implementing procedures, where required, to ensure adequate control of manufacturing, factory tests, delivery, and acceptance of materials and equipment. Overseeing the unpacking and checking of the materials and equipment, following up on the delivery of delayed components, and the processing of claims. (vii) Reviewing proposals for equipment commissioning and acceptance testing and trial operation plans; (viii) Responding to contractor requests for information in all matters related to interpreting contract documents, ground survey controls, quality control testing, and other matters relating to the contract under the project. (ix) Maintaining a permanent record of all quantities for payment and test results. (x) Where necessary, coordinating design changes to achieve to-time and to-budget delivery. (xi) Preparing change orders, and assist with negotiations with the contractor to implement the changes. Minimum Qualification Requirements (i) Be an engineering graduate from an accredited college or university; Registration as a Chartered or Registered Professional Engineer is highly desirable. (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects; (iii) A minimum of 10 years of progressively responsible experience in management, and contract oversight of large water supply and sewerage projects. (iv) Possess strong project management skills and ability to work within tight deadlines and budgets. (v) Have good financial management skills (including preparing and managing project budgets). (vi) Excellent leadership and people management, facilitation, negotiation, change management and interpersonal skills. (vii) Possess strategic planning knowledge and skills. (viii) Demonstrate the ability to work with and in teams both inside and outside the organization. (ix) Demonstrate the ability to think strategically to make decisions protecting the interests of the PPUC (x) Possess well-developed written and oral communication skills. Minimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 5 15-Oct-2026 31-Oct-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Nov-2026 15-Nov-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Nov-2026 30-Nov-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Dec-2026 15-Dec-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Dec-2026 31-Jan-2027 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Feb-2027 15-Feb-2027 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Feb-2027 31-Mar-2027 Dates are indicative only Total 50 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Pick a Date Loading... Loading...
Source / meaning
The project, estimated to cost $32 million to deliver, isسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
Consulting Services Budget USD 82,000سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
Koror and Airai, where about 78% of Palauans reside.سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
PPUC's sewage network in Koror services over 80% ofسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
(ii) A minimum of 10 years of experience in project manager role, including contract administration, forسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.
Shortlisting / qualification criteria
A — Organizational experience and structure
(i) Be an engineering graduate from an accredited college or university; Registration as a Chartered or Registered Professional Engineer is highly desirable.
Shortlisting stage(iv) Possess strong project management skills and ability to work within tight deadlines and budgets.
Shortlisting stage(v) Have good financial management skills (including preparing and managing project budgets).
Shortlisting stage(vi) Excellent leadership and people management, facilitation, negotiation, change management and interpersonal skills.
Shortlisting stage(vii) Possess strategic planning knowledge and skills.
Shortlisting stage(viii) Demonstrate the ability to work with and in teams both inside and outside the organization.
Shortlisting stage(ix) Demonstrate the ability to think strategically to make decisions protecting the interests of the PPUC
Shortlisting stage(x) Possess well-developed written and oral communication skills.
Shortlisting stageMinimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 5 15-Oct-2026 31-Oct-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Nov-2026 15-Nov-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Nov-2026 30-Nov-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Dec-2026 15-Dec-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Dec-2026 31-Jan-2027 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Feb-2027 15-Feb-2027 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Feb-2027 31-Mar-2027 Dates are indicative only Total 50 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved.
Shortlisting stage
Source clauses for this group
(i) Be an engineering graduate from an accredited college or university; Registration as a Chartered or Registered Professional Engineer is highly desirable.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria(iv) Possess strong project management skills and ability to work within tight deadlines and budgets.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria(v) Have good financial management skills (including preparing and managing project budgets).
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria(vi) Excellent leadership and people management, facilitation, negotiation, change management and interpersonal skills.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria(vii) Possess strategic planning knowledge and skills.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria(viii) Demonstrate the ability to work with and in teams both inside and outside the organization.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria(ix) Demonstrate the ability to think strategically to make decisions protecting the interests of the PPUC
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria(x) Possess well-developed written and oral communication skills.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteriaMinimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 5 15-Oct-2026 31-Oct-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Nov-2026 15-Nov-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Nov-2026 30-Nov-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Dec-2026 15-Dec-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Dec-2026 31-Jan-2027 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Feb-2027 15-Feb-2027 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Feb-2027 31-Mar-2027 Dates are indicative only Total 50 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria
C — Similar assignments
(ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects;
Shortlisting stage(iii) A minimum of 10 years of progressively responsible experience in management, and contract oversight of large water supply and sewerage projects.
Shortlisting stageMinimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max.
Shortlisting stage
Source clauses for this group
(ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects;
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria(iii) A minimum of 10 years of progressively responsible experience in management, and contract oversight of large water supply and sewerage projects.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteriaMinimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria
D — Key personnel
Shortlisting stage
project manager
- Required degree and discipline
- Not stated in the available role-specific clause.
- General work experience
- Not stated in the available role-specific clause.
- Similar projects, role and activities performed
- (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects;
- Local / national status
- Not stated in the available role-specific clause.
as a Chartered or Registered Professional Engineer
- Required degree and discipline
- Not stated in the available role-specific clause.
- General work experience
- Not stated in the available role-specific clause.
- Similar projects, role and activities performed
- Not stated in the available role-specific clause.
- Local / national status
- Not stated in the available role-specific clause.
10 years of experience in project manager
- Required degree and discipline
- Not stated in the available role-specific clause.
- General work experience
- Not stated in the available role-specific clause.
- Similar projects, role and activities performed
- (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects;
- Local / national status
- Not stated in the available role-specific clause.
Shortlisting stage: For some personnel requirements at this stage, the available evidence does not explicitly state whether CV submission is required.
Source clauses for this group
Registration as a Chartered or Registered Professional Engineer is highly desirable. (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects;
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria
Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.