REOI · چندکشوری

TA-10820 REG: Supporting Project Implementation and Capacity Building in Water and Urban Development in the Pacific (Subproject 1) - Project Management Advisor (E-059047-002)

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official CSRN directory ↗
Submission deadline
Country
چندکشوری
Employer
دستگاه اجرایی پروژه تأمین‌مالی‌شده توسط ADB
Notice reference
E-059047-002

Open the official listing and related documents — Find this assignment by its title, then select View CSRN to read its Profile and Terms of Reference.

SOURCE-BACKED SCREENING

Project objective and employer selection criteria

Official notice · High confidence

1. Project objective

Objective and Purpose of the Assignment

The Palau Public Utilities Corporation is responsible for responsible for the delivery of water supply

and sewage services throughout Palau.

The majority of PPUC’s water supply and sewerage assets are in

Koror and Airai, where about 78% of Palauans reside.

PPUC's sewage network in Koror services over 80% of

Koror population with approximately 3,000 connections.

PPUC has constructed a new sewage treatment plant

(sequencing batch reactor) at Malakal in Koror State and operates a small sewage treatment plant

(membrane batch reactor) in Melekeok State servicing the capital building and surrounding inhabitants.

In Palau’s other states, PPUC does not provide sewerage services.

The Government of Palau and PPUC have embarked upon a project, the Koror-Airai Sanitation Project

(KASP), to upgrade Koror’s sewerage systems.

The project, estimated to cost $32 million to deliver, is

financed by ADB, the Government, and PPUC, is currently being implemented.

The new wastewater treatment

plant at Malakal, financed through KASP, commenced operations in November 2021.

The project also funded

replacement of critical sewer network infrastructure and the refurbishment of sewer pumping stations.

Additional works required to fully commission the sewer network upgrades delivered by the project are

ongoing.

PPUC requires a project management advisor to assist PPUC deliver the additional works required to fully

upgrade the Koror sewerage network and to strengthen PPUC’s project management capacity.

Scope of Work

The project management advisor will assist PPUC’s Project Manager with the overall effective day-to-day

project management of remaining project activities including procurement, contract administration,

construction oversight, and reporting of the project's remaining tasks.

Detailed Tasks and/or Expected Output

The tasks of the Project Management Advisor include:

(a) Project Management

(i) Supporting PPUC's Project Management Unit (PMU) in overseeing and coordinating the overall

implementation of remaining KASP works to fully commission the new Koror sewer system.

(ii) Preparing and periodically updating a prioritized work plan to reflect remaining project

activities, ensuring the tasks and associated timeframes are realistic and achievable;

and updating the

project's performance and monitoring system.

(iii) Providing regular project progress monitoring and reporting, including monthly progress reports,

in accordance with the project performance monitoring system.

(iv) Providing regular, and on-request, briefings to the Minister of Finance, PPUC's Management, and

PPUC’s Project Manager.

(v) Reviewing contractor and vendor claims, including progress claims for payment from civil works

contractor and suppliers, and ensuring these are in order, recommend endorsement of payments to PPUC’s

Project Manager.

(vi) Ensuring efficient and effective implementation of remaining project activities including

troubleshooting, as required, to address actual and emerging project risks.

(vii) Assisting PPUC to manage the public relations aspects of the project;

and work in collaboration

with PPUC's Public Relations Officer, and relevant stakeholders to ensure effective dissemination of

project information to key stakeholders and the broader community in Palau;

(viii) Ensuring the implementation of environmental mitigation and monitoring measures as specified in

construction environmental monitoring plans and the timely submission of the project semi-annual

safeguards reports of acceptable quality.

(ix) Maintaining strong relationships with key stakeholders, through the development and implementation

of the stakeholder engagement and management plan.

(x) Provide coaching and mentoring to PMU staff using best project management practice.

(xi) Other project management tasks as reasonably requested by PPUC’s Project Manager and PPUC’s Chief

Executive Officer.

(b) Contract Management Tasks

(i) Monitoring contractor compliance with the contract terms and program and, where necessary issue

corrective notices to contractors to ensure the delivery of works and good to time and to budget.

(ii) Overseeing effective and regular supervision of works, including quality control tests to ensuring

that the works are executed in accordance with the Contract's technical specifications, procedures, and

approved designs and compliance with the construction environmental management and monitoring plan

(CEMP) and the construction schedule.

(iii) Assist PPUC’s Project Manager in administering works and goods contracts, including the processing

of progress certificates, review of extension of time and other claims, preparation of change orders,

and non-conformance notices;

and rigorous monitoring of contract implementation progress and cost

monitoring;

(iv) Reviewing contractor shop drawings and calculations, checking arrangements to ensure optimized

operation and maintenance, and verifying compliance with contract specifications.

(v) Reviewing equipment manufacturers' drawings and calculations to check arrangements for optimized

operation and maintenance and verify compliance with contract specifications.

(vi) Developing and implementing procedures, where required, to ensure adequate control of

manufacturing, factory tests, delivery, and acceptance of materials and equipment.

Overseeing the

unpacking and checking of the materials and equipment, following up on the delivery of delayed

components, and the processing of claims.

(vii) Reviewing proposals for equipment commissioning and acceptance testing and trial operation plans;

(viii) Responding to contractor requests for information in all matters related to interpreting contract

documents, ground survey controls, quality control testing, and other matters relating to the contract

under the project.

(ix) Maintaining a permanent record of all quantities for payment and test results.

(x) Where necessary, coordinating design changes to achieve to-time and to-budget delivery.

(xi) Preparing change orders, and assist with negotiations with the contractor to implement the changes.

Minimum Qualification Requirements

(i) Be an engineering graduate from an accredited college or university;

Registration as a Chartered or

Registered Professional Engineer is highly desirable.

(ii) A minimum of 10 years of experience in project manager role, including contract administration, for

water supply and/or sewerage projects;

(iii) A minimum of 10 years of progressively responsible experience in management, and contract

oversight of large water supply and sewerage projects.

(iv) Possess strong project management skills and ability to work within tight deadlines and budgets.

(v) Have good financial management skills (including preparing and managing project budgets).

(vi) Excellent leadership and people management, facilitation, negotiation, change management and

interpersonal skills.

(vii) Possess strategic planning knowledge and skills.

(viii) Demonstrate the ability to work with and in teams both inside and outside the organization.

(ix) Demonstrate the ability to think strategically to make decisions protecting the interests of the

PPUC

(x) Possess well-developed written and oral communication skills.

Minimum General Experience 10

Years

Minimum Specific Experience (relevant to assignment) 10

Years

Regional/Country Experience Required

Desired

Not Required

Deliverables

Details Name Type Estimated Submission Date

Monthly Report No. 1 Report 31-Oct-2026

Monthly Report No. 2 Report 30-Nov-2026

Monthly Report No. 3 Report 31-Dec-2026

Monthly Report No. 4 Report 31-Jan-2027

Monthly Report No. 5 Report 28-Feb-2027

Monthly Report No. 6 Final Report 31-Mar-2027

Schedule and Places of Assignment (chronological and inclusive of travel)

Schedule Type Continuous

Intermittent

Max.

Working Days/Week Home Office 5

Field 6

City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others)

Home Office, Other Search and Select: Place

5 15-Oct-2026 31-Oct-2026 Dates are indicative only

Koror, Palau Search and Select: Place

10 01-Nov-2026 15-Nov-2026 Dates are indicative only

Home Office, Other Search and Select: Place

5 16-Nov-2026 30-Nov-2026 Dates are indicative only

Koror, Palau Search and Select: Place

10 01-Dec-2026 15-Dec-2026 Dates are indicative only

Home Office, Other Search and Select: Place

5 16-Dec-2026 31-Jan-2027 Dates are indicative only

Koror, Palau Search and Select: Place

10 01-Feb-2027 15-Feb-2027 Dates are indicative only

Home Office, Other Search and Select: Place

5 16-Feb-2027 31-Mar-2027 Dates are indicative only

Total

50

Export to PDF

Export to PDF

Copyright (c) 1998, 2023, Oracle and/or its affiliates.

All rights reserved.

Copyright (c) 1998, 2023, Oracle and/or its affiliates.

All rights reserved.

Pick a Date

Loading...

Loading...

Scope of services

The project management advisor will assist PPUC’s Project Manager with the overall effective day-to-day project management of remaining project activities including procurement, contract administration, construction oversight, and reporting of the project's remaining tasks. Detailed Tasks and/or Expected Output The tasks of the Project Management Advisor include: (a) Project Management (i) Supporting PPUC's Project Management Unit (PMU) in overseeing and coordinating the overall implementation of remaining KASP works to fully commission the new Koror sewer system. (ii) Preparing and periodically updating a prioritized work plan to reflect remaining project activities, ensuring the tasks and associated timeframes are realistic and achievable; and updating the project's performance and monitoring system. (iii) Providing regular project progress monitoring and reporting, including monthly progress reports, in accordance with the project performance monitoring system. (iv) Providing regular, and on-request, briefings to the Minister of Finance, PPUC's Management, and PPUC’s Project Manager. (v) Reviewing contractor and vendor claims, including progress claims for payment from civil works contractor and suppliers, and ensuring these are in order, recommend endorsement of payments to PPUC’s Project Manager. (vi) Ensuring efficient and effective implementation of remaining project activities including troubleshooting, as required, to address actual and emerging project risks. (vii) Assisting PPUC to manage the public relations aspects of the project; and work in collaboration with PPUC's Public Relations Officer, and relevant stakeholders to ensure effective dissemination of project information to key stakeholders and the broader community in Palau; (viii) Ensuring the implementation of environmental mitigation and monitoring measures as specified in construction environmental monitoring plans and the timely submission of the project semi-annual safeguards reports of acceptable quality. (ix) Maintaining strong relationships with key stakeholders, through the development and implementation of the stakeholder engagement and management plan. (x) Provide coaching and mentoring to PMU staff using best project management practice. (xi) Other project management tasks as reasonably requested by PPUC’s Project Manager and PPUC’s Chief Executive Officer. (b) Contract Management Tasks (i) Monitoring contractor compliance with the contract terms and program and, where necessary issue corrective notices to contractors to ensure the delivery of works and good to time and to budget. (ii) Overseeing effective and regular supervision of works, including quality control tests to ensuring that the works are executed in accordance with the Contract's technical specifications, procedures, and approved designs and compliance with the construction environmental management and monitoring plan (CEMP) and the construction schedule. (iii) Assist PPUC’s Project Manager in administering works and goods contracts, including the processing of progress certificates, review of extension of time and other claims, preparation of change orders, and non-conformance notices; and rigorous monitoring of contract implementation progress and cost monitoring; (iv) Reviewing contractor shop drawings and calculations, checking arrangements to ensure optimized operation and maintenance, and verifying compliance with contract specifications. (v) Reviewing equipment manufacturers' drawings and calculations to check arrangements for optimized operation and maintenance and verify compliance with contract specifications. (vi) Developing and implementing procedures, where required, to ensure adequate control of manufacturing, factory tests, delivery, and acceptance of materials and equipment. Overseeing the unpacking and checking of the materials and equipment, following up on the delivery of delayed components, and the processing of claims. (vii) Reviewing proposals for equipment commissioning and acceptance testing and trial operation plans; (viii) Responding to contractor requests for information in all matters related to interpreting contract documents, ground survey controls, quality control testing, and other matters relating to the contract under the project. (ix) Maintaining a permanent record of all quantities for payment and test results. (x) Where necessary, coordinating design changes to achieve to-time and to-budget delivery. (xi) Preparing change orders, and assist with negotiations with the contractor to implement the changes. Minimum Qualification Requirements (i) Be an engineering graduate from an accredited college or university; Registration as a Chartered or Registered Professional Engineer is highly desirable. (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects; (iii) A minimum of 10 years of progressively responsible experience in management, and contract oversight of large water supply and sewerage projects. (iv) Possess strong project management skills and ability to work within tight deadlines and budgets. (v) Have good financial management skills (including preparing and managing project budgets). (vi) Excellent leadership and people management, facilitation, negotiation, change management and interpersonal skills. (vii) Possess strategic planning knowledge and skills. (viii) Demonstrate the ability to work with and in teams both inside and outside the organization. (ix) Demonstrate the ability to think strategically to make decisions protecting the interests of the PPUC (x) Possess well-developed written and oral communication skills. Minimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 5 15-Oct-2026 31-Oct-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Nov-2026 15-Nov-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Nov-2026 30-Nov-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Dec-2026 15-Dec-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Dec-2026 31-Jan-2027 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Feb-2027 15-Feb-2027 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Feb-2027 31-Mar-2027 Dates are indicative only Total 50 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Pick a Date Loading... Loading...

Exact source section
The project management advisor will assist PPUC’s Project Manager with the overall effective day-to-day project management of remaining project activities including procurement, contract administration, construction oversight, and reporting of the project's remaining tasks. Detailed Tasks and/or Expected Output The tasks of the Project Management Advisor include: (a) Project Management (i) Supporting PPUC's Project Management Unit (PMU) in overseeing and coordinating the overall implementation of remaining KASP works to fully commission the new Koror sewer system. (ii) Preparing and periodically updating a prioritized work plan to reflect remaining project activities, ensuring the tasks and associated timeframes are realistic and achievable; and updating the project's performance and monitoring system. (iii) Providing regular project progress monitoring and reporting, including monthly progress reports, in accordance with the project performance monitoring system. (iv) Providing regular, and on-request, briefings to the Minister of Finance, PPUC's Management, and PPUC’s Project Manager. (v) Reviewing contractor and vendor claims, including progress claims for payment from civil works contractor and suppliers, and ensuring these are in order, recommend endorsement of payments to PPUC’s Project Manager. (vi) Ensuring efficient and effective implementation of remaining project activities including troubleshooting, as required, to address actual and emerging project risks. (vii) Assisting PPUC to manage the public relations aspects of the project; and work in collaboration with PPUC's Public Relations Officer, and relevant stakeholders to ensure effective dissemination of project information to key stakeholders and the broader community in Palau; (viii) Ensuring the implementation of environmental mitigation and monitoring measures as specified in construction environmental monitoring plans and the timely submission of the project semi-annual safeguards reports of acceptable quality. (ix) Maintaining strong relationships with key stakeholders, through the development and implementation of the stakeholder engagement and management plan. (x) Provide coaching and mentoring to PMU staff using best project management practice. (xi) Other project management tasks as reasonably requested by PPUC’s Project Manager and PPUC’s Chief Executive Officer. (b) Contract Management Tasks (i) Monitoring contractor compliance with the contract terms and program and, where necessary issue corrective notices to contractors to ensure the delivery of works and good to time and to budget. (ii) Overseeing effective and regular supervision of works, including quality control tests to ensuring that the works are executed in accordance with the Contract's technical specifications, procedures, and approved designs and compliance with the construction environmental management and monitoring plan (CEMP) and the construction schedule. (iii) Assist PPUC’s Project Manager in administering works and goods contracts, including the processing of progress certificates, review of extension of time and other claims, preparation of change orders, and non-conformance notices; and rigorous monitoring of contract implementation progress and cost monitoring; (iv) Reviewing contractor shop drawings and calculations, checking arrangements to ensure optimized operation and maintenance, and verifying compliance with contract specifications. (v) Reviewing equipment manufacturers' drawings and calculations to check arrangements for optimized operation and maintenance and verify compliance with contract specifications. (vi) Developing and implementing procedures, where required, to ensure adequate control of manufacturing, factory tests, delivery, and acceptance of materials and equipment. Overseeing the unpacking and checking of the materials and equipment, following up on the delivery of delayed components, and the processing of claims. (vii) Reviewing proposals for equipment commissioning and acceptance testing and trial operation plans; (viii) Responding to contractor requests for information in all matters related to interpreting contract documents, ground survey controls, quality control testing, and other matters relating to the contract under the project. (ix) Maintaining a permanent record of all quantities for payment and test results. (x) Where necessary, coordinating design changes to achieve to-time and to-budget delivery. (xi) Preparing change orders, and assist with negotiations with the contractor to implement the changes. Minimum Qualification Requirements (i) Be an engineering graduate from an accredited college or university; Registration as a Chartered or Registered Professional Engineer is highly desirable. (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects; (iii) A minimum of 10 years of progressively responsible experience in management, and contract oversight of large water supply and sewerage projects. (iv) Possess strong project management skills and ability to work within tight deadlines and budgets. (v) Have good financial management skills (including preparing and managing project budgets). (vi) Excellent leadership and people management, facilitation, negotiation, change management and interpersonal skills. (vii) Possess strategic planning knowledge and skills. (viii) Demonstrate the ability to work with and in teams both inside and outside the organization. (ix) Demonstrate the ability to think strategically to make decisions protecting the interests of the PPUC (x) Possess well-developed written and oral communication skills. Minimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 5 15-Oct-2026 31-Oct-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Nov-2026 15-Nov-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Nov-2026 30-Nov-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Dec-2026 15-Dec-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Dec-2026 31-Jan-2027 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Feb-2027 15-Feb-2027 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Feb-2027 31-Mar-2027 Dates are indicative only Total 50 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Pick a Date Loading... Loading...
Important stated figures and their meaning
Overall project cost / financing, not this contract$32 million
Source / meaning
The project, estimated to cost $32 million to deliver, is
سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — official notice / tender document
Stated service / contract estimate or feeUSD 82,000
Source / meaning
Consulting Services Budget USD 82,000
سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — official notice / tender document
Stated figure — see its source context78%
Source / meaning
Koror and Airai, where about 78% of Palauans reside.
سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — official notice / tender document
Stated figure — see its source context80%
Source / meaning
PPUC's sewage network in Koror services over 80% of
سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — official notice / tender document
Required experience≥ 10 years
Source / meaning
(ii) A minimum of 10 years of experience in project manager role, including contract administration, for
سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — official notice / tender document

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Qualification criteria reviewed. Check the latest tender documents before submission.
1

A — Organizational experience and structure

  • (i) Be an engineering graduate from an accredited college or university; Registration as a Chartered or Registered Professional Engineer is highly desirable.

    Shortlisting stage
  • (iv) Possess strong project management skills and ability to work within tight deadlines and budgets.

    Shortlisting stage
  • (v) Have good financial management skills (including preparing and managing project budgets).

    Shortlisting stage
  • (vi) Excellent leadership and people management, facilitation, negotiation, change management and interpersonal skills.

    Shortlisting stage
  • (vii) Possess strategic planning knowledge and skills.

    Shortlisting stage
  • (viii) Demonstrate the ability to work with and in teams both inside and outside the organization.

    Shortlisting stage
  • (ix) Demonstrate the ability to think strategically to make decisions protecting the interests of the PPUC

    Shortlisting stage
  • (x) Possess well-developed written and oral communication skills.

    Shortlisting stage
  • Minimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 5 15-Oct-2026 31-Oct-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Nov-2026 15-Nov-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Nov-2026 30-Nov-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Dec-2026 15-Dec-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Dec-2026 31-Jan-2027 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Feb-2027 15-Feb-2027 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Feb-2027 31-Mar-2027 Dates are indicative only Total 50 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved.

    Shortlisting stage
Source clauses for this group
  1. (i) Be an engineering graduate from an accredited college or university; Registration as a Chartered or Registered Professional Engineer is highly desirable.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  2. (iv) Possess strong project management skills and ability to work within tight deadlines and budgets.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  3. (v) Have good financial management skills (including preparing and managing project budgets).
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  4. (vi) Excellent leadership and people management, facilitation, negotiation, change management and interpersonal skills.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  5. (vii) Possess strategic planning knowledge and skills.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  6. (viii) Demonstrate the ability to work with and in teams both inside and outside the organization.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  7. (ix) Demonstrate the ability to think strategically to make decisions protecting the interests of the PPUC
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  8. (x) Possess well-developed written and oral communication skills.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  9. Minimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 6 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Home Office, Other Search and Select: Place 5 15-Oct-2026 31-Oct-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Nov-2026 15-Nov-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Nov-2026 30-Nov-2026 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Dec-2026 15-Dec-2026 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Dec-2026 31-Jan-2027 Dates are indicative only Koror, Palau Search and Select: Place 10 01-Feb-2027 15-Feb-2027 Dates are indicative only Home Office, Other Search and Select: Place 5 16-Feb-2027 31-Mar-2027 Dates are indicative only Total 50 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
3

C — Similar assignments

  • (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects;

    Shortlisting stage
  • (iii) A minimum of 10 years of progressively responsible experience in management, and contract oversight of large water supply and sewerage projects.

    Shortlisting stage
  • Minimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max.

    Shortlisting stage
Source clauses for this group
  1. (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects;
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  2. (iii) A minimum of 10 years of progressively responsible experience in management, and contract oversight of large water supply and sewerage projects.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria
  3. Minimum General Experience 10 Years Minimum Specific Experience (relevant to assignment) 10 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Monthly Report No. 1 Report 31-Oct-2026 Monthly Report No. 2 Report 30-Nov-2026 Monthly Report No. 3 Report 31-Dec-2026 Monthly Report No. 4 Report 31-Jan-2027 Monthly Report No. 5 Report 28-Feb-2027 Monthly Report No. 6 Final Report 31-Mar-2027 Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max.
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria

D — Key personnel

Shortlisting stage

project manager
Required degree and discipline
Not stated in the available role-specific clause.
General work experience
Not stated in the available role-specific clause.
Similar projects, role and activities performed
  • (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects;
Local / national status
Not stated in the available role-specific clause.
as a Chartered or Registered Professional Engineer
Required degree and discipline
Not stated in the available role-specific clause.
General work experience
Not stated in the available role-specific clause.
Similar projects, role and activities performed
Not stated in the available role-specific clause.
Local / national status
Not stated in the available role-specific clause.
10 years of experience in project manager
Required degree and discipline
Not stated in the available role-specific clause.
General work experience
Not stated in the available role-specific clause.
Similar projects, role and activities performed
  • (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects;
Local / national status
Not stated in the available role-specific clause.

Shortlisting stage: For some personnel requirements at this stage, the available evidence does not explicitly state whether CV submission is required.

Source clauses for this group
  1. Registration as a Chartered or Registered Professional Engineer is highly desirable. (ii) A minimum of 10 years of experience in project manager role, including contract administration, for water supply and/or sewerage projects;
    Shortlisting stage · سامانه رسمی فرصت‌های مشاوره‌ای ADB (CMS/CSRN) — shortlisting / qualification criteria

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.