IFB · چندکشوری

Invitation to Bid: Seismic safety and structural engineering

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

Official document · High confidence

1. Project objective

On-call seismic assessments, structural design, disaster response and training for ADB premises.

Important stated figures and their meaning
Stated figure — see its source context5 years
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
ADB official institutional notices — reviewed recovery, 9 September 2026
Stated figure — see its source context3 years
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
ADB official institutional notices — reviewed recovery, 9 September 2026

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Only requirements explicitly found in the available official text are shown.
1

Organisation history and structure

2 explicit requirement(s)
StandingOfficial document · High confidence

No debarment by ADB or other multilateral institutions.

Evidence preparation — FANAB guidance

Prepare completion/performance certificates, client references or verifiable contacts mapped to their contracts.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
Have not been sanctioned
Source location: https://www.adb.org/sites/default/files/page/559266/itb-pre-post-earthquake-engineering-services.pdf — page 1, paragraph 4 (iii)
LitigationOfficial document · High confidence

No litigation materially impairing bidder or subcontractor performance.

Evidence preparation — FANAB guidance

Prepare completion/performance certificates, client references or verifiable contacts mapped to their contracts.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
no pending litigation
Source location: https://www.adb.org/sites/default/files/page/559266/itb-pre-post-earthquake-engineering-services.pdf — page 1, paragraph 4 (v)
2

Technical and managerial capability

Not found among the extracted criteria

No explicit requirement in this category appears among the criteria extracted from the currently available official text. Verify the complete notice, TOR and addenda.

3

Similar experience

1 explicit requirement(s)
ExperienceOfficial document · High confidence

Minimum 5 years of seismic or related engineering experience.

Relevant experience: at least 5 years
Evidence preparation — FANAB guidance

For each reference record client, country, start/completion dates, actual role/workshare, scope, deliverables, value if requested and contact; prepare contracts and completion/client certificates.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
at least 5 years
Source location: https://www.adb.org/sites/default/files/page/559266/itb-pre-post-earthquake-engineering-services.pdf — page 1, paragraph 4 (ii)
4

Key personnel

Not found among the extracted criteria

No explicit requirement in this category appears among the criteria extracted from the currently available official text. Verify the complete notice, TOR and addenda.

5

Eligibility and legal requirements

1 explicit requirement(s)
NationalityOfficial document · High confidence

Constitution and operations in an eligible member country.

Evidence preparation — FANAB guidance

Prepare legal identity, origin and requested eligibility declarations; debarment and applicable rules require current official checks.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
List of ADB Eligible Member Countries
Source location: https://www.adb.org/sites/default/files/page/559266/itb-pre-post-earthquake-engineering-services.pdf — page 1, paragraph 4 (i)
6

Company financial capacity

1 explicit requirement(s)
FinanceOfficial document · High confidence

Sound finances supported by 3 years of audited statements.

Reference period: last 3 years
Evidence preparation — FANAB guidance

Map financial statements, audit reports and turnover for the required period/currency to the threshold; project budget is not company turnover. Verify completion within the stated 3-year window against the employer's reference date.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
last 3 years
Source location: https://www.adb.org/sites/default/files/page/559266/itb-pre-post-earthquake-engineering-services.pdf — page 1, paragraph 4 (iv)
7

Other employer-specific criteria

Not found among the extracted criteria

No explicit requirement in this category appears among the criteria extracted from the currently available official text. Verify the complete notice, TOR and addenda.

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.