Trans-Caspian Corridor - Georgia Accessibility and Transport Enhancement Project

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Stated monetary amount — see source for its purposeUS$350 million
Source / meaning
Capacity (total cost US$350 million of which ADB US$175 million and WB US$175 million):
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$175 million
Source / meaning
the amount of US$175 million.
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$175 million
Source / meaning
ADB US$175 million
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$175 million
Source / meaning
Capacity (total cost US$350 million of which ADB US$175 million and WB US$175 million):
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$336 million
Source / meaning
Component 2: Road Connectivity Improvements (total cost US$336 million): This component
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$315 million
Source / meaning
Sub-component 2.1: Roads Civil Works (total cost US$315 million): This sub-component
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$21
Source / meaning
Sub-component 2.2: Project Management Support for Roads Sector (total cost US$21
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$21
Source / meaning
Sub-component 3.1: Digitalization and Intelligent Transport Systems (ITS) (US$21
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$5 million
Source / meaning
US$27.23 million of which counterpart funding US$22.23 million and WB US$5 million).
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$5 million
Source / meaning
(US$5 million) & (b) Project audit and supervision structure (US$16 million) will finance
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$16 million
Source / meaning
(US$5 million) & (b) Project audit and supervision structure (US$16 million) will finance
فهرست رسمی مناقصات تدارکاتی AIIB
Stated monetary amount — see source for its purposeUS$2 million
Source / meaning
Sub-component 3.2: Building Climate Resilience (US$2 million) will entail development of
فهرست رسمی مناقصات تدارکاتی AIIB
Stated figure — see its source context175 million an
Source / meaning
Capacity (total cost US$350 million of which ADB US$175 million and WB US$175 million):
فهرست رسمی مناقصات تدارکاتی AIIB
Infrastructure length21.7 km
Source / meaning
Chalaubani and Chalaubani-Bakurtsikhe with a length of 21.7 km and 9.1 km,
فهرست رسمی مناقصات تدارکاتی AIIB
Infrastructure length21.7 km
Source / meaning
Bakurtsikhe with a length of 21.7 km and 9.1 km, respectively), and respective
فهرست رسمی مناقصات تدارکاتی AIIB
Infrastructure length9.1 km
Source / meaning
Chalaubani and Chalaubani-Bakurtsikhe with a length of 21.7 km and 9.1 km,
فهرست رسمی مناقصات تدارکاتی AIIB
Infrastructure length9.1 km
Source / meaning
Bakurtsikhe with a length of 21.7 km and 9.1 km, respectively), and respective
فهرست رسمی مناقصات تدارکاتی AIIB
Infrastructure length36.6 km
Source / meaning
and construction of 36.6 km road between Gurjaani and Telavi, to further
فهرست رسمی مناقصات تدارکاتی AIIB
Infrastructure length36.6 km
Source / meaning
SPN for construction of 36.6 km road between Gurjaani and Telavi is expected to be
فهرست رسمی مناقصات تدارکاتی AIIB
Stated figure — see its source context2.1 an
Source / meaning
design review and construction supervision of the works under sub-component 2.1 and
فهرست رسمی مناقصات تدارکاتی AIIB
Project lot / phasecomponent 1.2
Source / meaning
Sub-component 1.2: Construction of an electric substation or upgrade of electric
فهرست رسمی مناقصات تدارکاتی AIIB
View the official objective and scope excerpt
Transport · General Procurement Notice
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Only requirements explicitly found in the available official text are shown.
1

Organisation history and structure

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

2

Technical and managerial capability

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

3

Similar experience

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

4

Key personnel

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

5

Eligibility and legal requirements

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

6

Company financial capacity

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

7

Other employer-specific criteria

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

Complete retrieved official text
*OFFICIAL USE ONLY GENERAL PROCUREMENT NOTICE Georgia Trans-Caspian Transport Corridor - Georgia Accessibility and Transport Enhancement Project Road & Rolling Stock Sector GENERAL PROCUREMENT NOTICE (GPN) LOAN NUMBER: 9981-GE (WB); L01123A (AIIB) Project ID No. P513957 (WB); P001123 (AIIB) The Government of Georgia has received financing in the amount of US$ 372 million from the World Bank (WB) towards the cost of the Trans-Caspian Transport Corridor - Georgia Accessibility and Transport Enhancement Project, and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this Project. The Project is co-financed by (i) the Asian Infrastructure Investment Bank (AIIB) in the amount of US$181.07 million1; and by (ii) the Asian Development Bank (ADB) in the amount of US$175 million. The financing agreements with AIIB and ADB are being processed and will be concluded in due course. The project will include the following components: Component 1: Improving Rail freight Performance and Sustainability (total cost US$387.23 million of which counterpart funding US$22.23 million; ADB US$175 million; WB US$190 million: This component will be implemented by Georgian Railways (GR) and co- financed by ADB and WB, with counterpart funding as well. The component will address three critical issues: (i) acquisition of locomotives; (ii) construction of an Electric substation or upgrading of existing electric substation(s), and (iii) institutional strengthening and the sustainability of GR. Sub-component 1.1: Acquisition of Electric Railway Locomotives for Enhanced Rail Capacity (total cost US$350 million of which ADB US$175 million and WB US$175 million): This component will finance the procurement of 45 new electric locomotives that comply with applicable environmental, safety, ergonomics, and technical standards, as well as their testing and commissioning. ADB will jointly cofinance this sub-component through an Investment Project Lending operation, with disbursements shared on a 50:50 pari passu basis. Procurement will follow World Bank procurement regulations and will be carried out under joint procurement arrangements, with the World Bank serving as the lead implementing partner. Sub-component 1.2: Construction of an electric substation or upgrade of electric substations (total cost of US$10 million, WB financed): This sub-component will finance construction of one electric substation or upgrade of electric substations to support operations of the new electric locomotives. The specific scope of construction or upgradation needs for electric substations will depend on the technical specifications of the locomotives procured and will be determined during project implementation. 1 EUR equivalent. Official Use Only *OFFICIAL USE ONLY Sub-component 1.3: Institutional Strengthening and Sustainability of GR (total cost US$27.23 million of which counterpart funding US$22.23 million and WB US$5 million). This sub-component complements investments in rolling stock by strengthening GR’s institutional, operational, and managerial capacity, thereby ensuring sustainable improvements in performance and financial viability. The remaining components (2, 3, 4 and 5) will be cofinanced with AIIB at equal share on a pari passu basis, according to the WB-AIIB Co-financing Framework Agreement. WB procurement regulations and E&S procedures will apply. Component 2: Road Connectivity Improvements (total cost US$336 million): This component will be implemented through RD and will entail: Sub-component 2.1: Roads Civil Works (total cost US$315 million): This sub-component entails the construction of two four-lane segments of the Kakheti highway (Badiauri- Chalaubani and Chalaubani-Bakurtsikhe with a length of 21.7 km and 9.1 km, respectively); and construction of 36.6 km road between Gurjaani and Telavi, to further connect to the Kakheti highway. Sub-component 2.2: Project Management Support for Roads Sector (total cost US$21 million), will cover: (a) Incremental operating costs, project management, staff development (US$5 million) & (b) Project audit and supervision structure (US$16 million) will finance design review and construction supervision of the works under sub-component 2.1 and annual project audits. Component 3: Roads Sector Institutional Strengthening (total cost US$23 million): This component entails activities that enable RD institutional strengthening through the following sub-components: Sub-component 3.1: Digitalization and Intelligent Transport Systems (ITS) (US$21 million) will fund designing the building, the construction and equipment of RD’s centralized National Highway Control Center (NHCC), establish a national ITS by linking RD’s system to NHCC, and enable remote monitoring of road assets to improve RAMS functionality. Sub-component 3.2: Building Climate Resilience (US$2 million) will entail development of institutional frameworks and provision of tools within the RD to help strengthen climate resilience of the road network. Component 4: Economic Empowerment and Analytics for Regional Integration and Road Sector Sustainability (total cost of US$3.14 million). Component 5: Contingent Emergency Response Component (CERC) (US$0 million): This zero- dollar component is designed to provide swift response in the event of an eligible emerging crisis or emergency. Official Use Only *OFFICIAL USE ONLY Procurement of contracts in all co-financed components will be conducted through the procedures as specified in the World Bank’s Procurement Regulations for IPF Borrowers for Goods, Works, Non-Consulting and Consulting Services, dated September 2025, Seventh Edition, and is open to all eligible firms and individuals as defined in the Procurement Regulations. The respective financier shall arrange the publication on its external website of the agreed initial procurement plan and all subsequent updates once it has provided no objection. Specific Procurement Notices for contracts subject to open international competitive procurement will be announced, as they become available, on the respective financier’s external website. Specific Procurement Notice (SPN) is expected to be published in July / August 2026 for procurement of: (i) 45 new electric locomotives; (ii) Roads Civil Works for construction of two four-lane segments of the Kakheti highway (Badiauri-Chalaubani & Chalaubani- Bakurtsikhe with a length of 21.7 km and 9.1 km, respectively), and respective Supervision Engineer’s assignment. SPN for construction of 36.6 km road between Gurjaani and Telavi is expected to be published in the third quarter of 2027 calendar year. SPN for construction and equipment of RD’s centralized National Highway Control Center (NHCC) is expected to be published in the third quarter of 2027 calendar year. Prequalification/Initial Selection of suppliers and contractors may be required only for Gurjaani - Telavi road construction Works. Interested eligible firms and individuals who would wish to be considered for the provision of goods, works, non-consulting services and consulting services for the above-mentioned project, or those requiring additional information, should contact the Borrower at the address below: For Component N1: Organization JSC Georgian Railway Address 15 Tamar Mepe Ave City Tbilisi Postal Code 0112 Country Georgia Phone + +995 577 456883 Email teona.miminoshvili@railway.ge Web Site www.railway.ge Official Use Only *OFFICIAL USE ONLY For Components N1; N2 and N3: Organization/Department Roads Department of the Ministry of Infrastructure of Georgia Address 12 Al. Kazbegi Avenue City Tbilisi Postal Code 0160 Country Georgia Phone + (995 32) 2 37-05-08 Email info@georoad.ge Web Site www.georoad.ge Official Use Only

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.