Ebrd Contract No · اوکراین

Ukraine: Installation of Gas piston engine power and cogeneration plants at 3 sites (approx. 70MW total capacity), including related works

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Stated figure — see its source context3 sites
Source / meaning
Ukraine: Installation of Gas piston engine power and cogeneration plants at 3 sites (approx. 70MW total capacity), including related works
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Stated figure — see its source context3 sites
Source / meaning
Installation of Gas piston engine power and cogeneration plants at 3 sites (approx. 70MW total capacity), including related works
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Power capacity70MW
Source / meaning
Ukraine: Installation of Gas piston engine power and cogeneration plants at 3 sites (approx. 70MW total capacity), including related works
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Power capacity70MW
Source / meaning
Installation of Gas piston engine power and cogeneration plants at 3 sites (approx. 70MW total capacity), including related works
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
View the official objective and scope excerpt
Installation of Gas piston engine power and cogeneration plants at 3 sites (approx. 70MW total capacity), including related works · Ebrd Contract Notice Addendum
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Only requirements explicitly found in the available official text are shown.
1

Organisation history and structure

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

2

Technical and managerial capability

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

3

Similar experience

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

4

Key personnel

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

5

Eligibility and legal requirements

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

6

Company financial capacity

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

7

Other employer-specific criteria

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

Complete retrieved official text
View Notice | ECEPP Skip to main content. • • • Attention Translation are provided to assist users. Please note that any data entered into the system must only be entered in English. OK Attention Translation are provided to assist users. Please note that any data entered into the system must only be entered in English. OK --> Login / Register • Home • About EBRD • Help • Security • Terms and Conditions • Privacy Policy • Home • About EBRD --> • Registration • Search Opportunities • News & Updates • Help --> Ukraine: Installation of Gas piston engine power and cogeneration plants at 3 sites (approx. 70MW total capacity), including related works Contract Notice Addendum Project Name: RFL - Ukrnafta Emergency Distributed Generation Support EBRD Project ID: 55678 Country: Ukraine Client Name: Ukrnafta PJSC ECEPP ID: 37786066 Procurement Exercise Name: Installation of Gas piston engine power and cogeneration plants at 3 sites (approx. 70MW total capacity), including related works Type of Procurement: Works Procurement Method: Open Tender Two Stage with PQQ Business Sector: Power and Energy Notice Type: Contract Notice Addendum Publication Date: 12/12/2025 19:43 Opportunity Status This opportunity is for information purposes only This opportunity is not yet open for response This opportunity is now open for response This opportunity is now closed for response Access Opportunity This opportunity is for information purposes only This is a Contract Notice Addendum and cannot be responded to directly. Contract Notice Addendum Addendum Date of Addendum: 12/12/2025 Reason for Addendum: The deadline for submission of Applications referred to in ITP 14.1, is extended until: December 15, 2025, at 14:00 (UK Time) Nature of Addendum: Deadline Extension Client Address: Yurii Zhuravkov PJSC "Ukrnafta" PJSC "Ukrnafta" 3-5, Nestorivskyi lane Kyiv 04053 Ukraine Tel. +380445034794 Email: yurii.zhuravkov@ukrnafta.com Access Opportunity • Terms and Conditions • Privacy Policy • Security • About Us Powered by --> Product of -->

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.