Project objective and employer selection criteria
1. Project objective
The currently available official record does not contain enough source text for a reliable project-objective summary.
Source / meaning
The total estimated investment cost of the Project is approximately KZT 780,259 million (equivalent).سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Source / meaning
The highway has a total length of 799,653 kilometres (including: the length of the main road - 599.166 km and the length of access roads to settlements - 240.487 km) (Category II, single carriageway, design speed 120 km/h) and will be constructed across three regions: Mangystau, Aktobe and Kyzylorda.سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Source / meaning
The highway has a total length of 799,653 kilometres (including: the length of the main road - 599.166 km and the length of access roads to settlements - 240.487 km) (Category II, single carriageway, design speed 120 km/h) and will be constructed across three regions: Mangystau, Aktobe and Kyzylorda.سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Source / meaning
The highway has a total length of 799,653 kilometres (including: the length of the main road - 599.166 km and the length of access roads to settlements - 240.487 km) (Category II, single carriageway, design speed 120 km/h) and will be constructed across three regions: Mangystau, Aktobe and Kyzylorda.سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Source / meaning
The EBRD loan will finance the design, construction and maintenance of approximately 161.5 kilometres of the highway, located in Mangystau and Aktobe oblasts, comprising: (i) 160 km of main highway (km 0+000 to km 160+000), structured as four (4) separate lots under a Design-Build-Maintain (DBM) contract strategyسامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Source / meaning
(ii) a 1.5 km access road to the village of Turyshسامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Source / meaning
Lot 2 Main highway: km 40+000 – 80+000 40.0 km + 1.5 km Mangystau and Access road to the village of Turyshسامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Source / meaning
Lot 1 Main highway: km 0+000 – 40+000 40.0 km Mangystau and Intermediate Control Arch (ITS) at km 1+720سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Source / meaning
Lot 2 Main highway: km 40+000 – 80+000 40.0 km + 1.5 km Mangystau and Access road to the village of Turyshسامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Source / meaning
Lot 2 Main highway: km 40+000 – 80+000 40.0 km + 1.5 km Mangystau and Access road to the village of Turyshسامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
View the official objective and scope excerpt
N/A · General Procurement Notice
Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.
Shortlisting / qualification criteria
Organisation history and structure
Source text unavailableFANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.
Technical and managerial capability
Source text unavailableFANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.
Similar experience
Source text unavailableFANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.
Key personnel
Source text unavailableFANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.
Eligibility and legal requirements
Source text unavailableFANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.
Company financial capacity
Source text unavailableFANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.
Other employer-specific criteria
Source text unavailableFANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.
Complete retrieved official text
View Notice | ECEPP Skip to main content. • • • Attention Translation are provided to assist users. Please note that any data entered into the system must only be entered in English. OK Attention Translation are provided to assist users. Please note that any data entered into the system must only be entered in English. OK --> Login / Register • Home • About EBRD • Help • Security • Terms and Conditions • Privacy Policy • Home • About EBRD --> • Registration • Search Opportunities • News & Updates • Help --> Kazakhstan: Beineu - Saksaulsk Road project General Procurement Notice Project Name: Beineu - Saksaulsk Road project EBRD Project ID: 53298 Country: Kazakhstan Client Name: JSC NC KazAvtoZhol Type of Procurement: Works,Consultancy Business Sector: Transport Notice Type: General Procurement Notice Publication Date: 31/07/2026 14:42 Opportunity Status This opportunity is for information purposes only This opportunity is not yet open for response This opportunity is now open for response This opportunity is now closed for response Access Opportunity This opportunity is for information purposes only This is a General Procurement Notice and cannot be responded to directly. General Procurement Notice 1. Funding Details The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named project. Additional financing information: The above named client intends to use the proceeds from the European Bank for Reconstruction and Development (the "Bank") towards the cost of the aforementioned project. Additional financing information: The project will be co-financed by the EBRD and the Republic of Kazakhstan. 2. Information on the Project Project Description: JSC KazAvtoZhol (the "Client"), a 100 per cent state-owned national road operator in Kazakhstan, has applied for a sovereign guaranteed loan from the European Bank for Reconstruction and Development ("the Bank" or "EBRD") to finance part of the construction of the Beineu–Saksaulsk Road Project in Kazakhstan (the "Project"). The Highway forms part of the international Europe–Caucasus–Asia (TRACECA) transport corridor and will facilitate overland trade between China and Western Europe via Kazakhstan. The highway has a total length of 799,653 kilometres (including: the length of the main road - 599.166 km and the length of access roads to settlements - 240.487 km) (Category II, single carriageway, design speed 120 km/h) and will be constructed across three regions: Mangystau, Aktobe and Kyzylorda. The total estimated investment cost of the Project is approximately KZT 780,259 million (equivalent). The overall Beineu–Saksaulsk Road project is co-financed by the EBRD, the International Bank for Reconstruction and Development (IBRD/World Bank), Asian Development Bank, Development Bank of Kazakhstan and the Republic of Kazakhstan budget. The EBRD loan will finance the design, construction and maintenance of approximately 161.5 kilometres of the highway, located in Mangystau and Aktobe oblasts, comprising: (i) 160 km of main highway (km 0+000 to km 160+000), structured as four (4) separate lots under a Design-Build-Maintain (DBM) contract strategy; (ii) a 1.5 km access road to the village of Turysh; and (iii) one Intelligent Transportation System (ITS) facility at km 1+720. The components under the project are as follows: Component Description / Section Length Oblast Lot 1 Main highway: km 0+000 – 40+000 40.0 km Mangystau and Intermediate Control Arch (ITS) at km 1+720 Lot 2 Main highway: km 40+000 – 80+000 40.0 km + 1.5 km Mangystau and Access road to the village of Turysh Lot 3 Main highway: km 80+000 – 125+000 45.0 km Mangystau Lot 4 Main highway: km 125+000 – 160+000 35.0 km Aktobe Total 161.5 km In addition to the DBM Works contracts, the Project will require the procurement of the following consultancy services: ● Project Implementation Consultant (PIC) for construction supervision, contract management and employer's representative functions during the design, build and maintenance phases of the DBM contracts. Estimated Total Project Value 211,783,064,067.00 Currency KZT Procurement Type Works,Consultancy Estimated Start Date of Procurement 03/08/2026. 3. Other Information Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents. Procurement under this project will be conducted using the EBRD Client E-Procurement Portal (ECEPP). If you intend to participate in any procurement under this project, please ensure that you have registered in ECEPP ( https://ecepp.ebrd.com ). Registered entities will be notified directly when any procurement opportunities are published. A Procurement of the above contracts is expected to commence in Q3 2026. Prequalification (PQ) Documents for the Works contracts are being prepared and will be launched following completion of the Early Market Engagement (EME) exercise currently underway. Interested firms are encouraged to register on ECEPP to receive notifications when opportunities are published. In addition to the DBM Works contracts, the Project will require the procurement of the following consultancy services: Project Implementation Consultant (PIC) for construction supervision, contract management and employer's representative functions during the design, build and maintenance phases of the DBM contracts. 4. Client Address JSC KazAvtoZhol JSC KazAvtoZhol 60/4 Syganak Street, Astana, Kazakhstan Astana 010000 Kazakhstan Tel. 64-87-09 Email: mutalyapova00@bk.ru Access Opportunity • Terms and Conditions • Privacy Policy • Security • About Us Powered by --> Product of -->
Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.