GPN · مراکش

Morocco: Saiss III water conservation project

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Stated monetary amount — see source for its purposeEUR 150 million
Source / meaning
A sovereign loan of up to EUR 150 million to the Kingdom of Morocco to finance a water distribution pipeline and network aimed at irrigating 20,000 hectares in the Saiss plain (the Project).
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Stated monetary amount — see source for its purposeEUR 150 million
Source / meaning
In 2020, the Bank extended a second sovereign loan of EUR 150 million, to finance the main distribution pipeline and network for irrigation of 10,000ha (Saiss II, OPID 51223).
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Stated monetary amount — see source for its purposeEUR 120 million
Source / meaning
As part of this programme, the Bank previously extended in 2017 a sovereign loan of EUR 120 million to finance a 45 km of the main transfer pipeline (Saiss I, OPID 48414).
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Project area20,000 hectares
Source / meaning
A sovereign loan of up to EUR 150 million to the Kingdom of Morocco to finance a water distribution pipeline and network aimed at irrigating 20,000 hectares in the Saiss plain (the Project).
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Water / structure volume120 million m3
Source / meaning
ss aquifer and promote sustainable water management within the Saiss plain which envisages an annual transfer of 90-120 million m3 surface water from the MDez dam to the plain for irrigation purposes.
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Infrastructure length45 km
Source / meaning
As part of this programme, the Bank previously extended in 2017 a sovereign loan of EUR 120 million to finance a 45 km of the main transfer pipeline (Saiss I, OPID 48414).
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Stated figure — see its source context10,000ha
Source / meaning
In 2020, the Bank extended a second sovereign loan of EUR 150 million, to finance the main distribution pipeline and network for irrigation of 10,000ha (Saiss II, OPID 51223).
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
View the official objective and scope excerpt
N/A · General Procurement Notice
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Only requirements explicitly found in the available official text are shown.
1

Organisation history and structure

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

2

Technical and managerial capability

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

3

Similar experience

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

4

Key personnel

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

5

Eligibility and legal requirements

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

6

Company financial capacity

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

7

Other employer-specific criteria

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

Complete retrieved official text
View Notice | ECEPP Skip to main content. • • • Attention Translation are provided to assist users. Please note that any data entered into the system must only be entered in English. OK Attention Translation are provided to assist users. Please note that any data entered into the system must only be entered in English. OK --> Login / Register • Home • About EBRD • Help • Security • Terms and Conditions • Privacy Policy • Home • About EBRD --> • Registration • Search Opportunities • News & Updates • Help --> Morocco: Saiss III water conservation project General Procurement Notice Project Name: Saiss III water conservation project EBRD Project ID: 55198 Country: Morocco Client Name: Governement of Morocco Type of Procurement: Goods,Works,Consultancy Business Sector: Infra EMEA Notice Type: General Procurement Notice Publication Date: 07/10/2025 14:16 Opportunity Status This opportunity is for information purposes only This opportunity is not yet open for response This opportunity is now open for response This opportunity is now closed for response Access Opportunity This opportunity is for information purposes only This is a General Procurement Notice and cannot be responded to directly. General Procurement Notice 1. Funding Details The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named project. Additional financing information: EBRD Loan: 150 Mil EUR co-financed by Grants and the Government of Morocco 2. Information on the Project Project Description: A sovereign loan of up to EUR 150 million to the Kingdom of Morocco to finance a water distribution pipeline and network aimed at irrigating 20,000 hectares in the Saiss plain (the Project). The Project is the third and final phase of a staged programme to preserve the Saïss aquifer and promote sustainable water management within the Saiss plain which envisages an annual transfer of 90-120 million m3 surface water from the MDez dam to the plain for irrigation purposes. As part of this programme, the Bank previously extended in 2017 a sovereign loan of EUR 120 million to finance a 45 km of the main transfer pipeline (Saiss I, OPID 48414). In 2020, the Bank extended a second sovereign loan of EUR 150 million, to finance the main distribution pipeline and network for irrigation of 10,000ha (Saiss II, OPID 51223). Estimated Total Project Value 252,000,000.00 Currency EUR Procurement Type Goods,Works,Consultancy Estimated Start Date of Procurement 15/08/2025. 3. Other Information Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents. Procurement under this project will be conducted using the EBRD Client E-Procurement Portal (ECEPP). If you intend to participate in any procurement under this project, please ensure that you have registered in ECEPP ( https://ecepp.ebrd.com ). Registered entities will be notified directly when any procurement opportunities are published. 4. Client Address M.Zakariae EL YACOUBI DIRECTION DE L’IRRIGATION ET DE L’AMENAGEMENT DE L’ESPACE AGRICOLE MINISTÈRE DE L’AGRICULTURE, DE LA PÊCHE MARITIME, DU DÉVELOPPEMENT RURAL ET DES EAUX ET FORÊTS BP 607, Complexe Dbagh – Avenue Hassan II – RABAT - MAROC RABAT BP 607 Morocco Tel. +212 537 10 31 78 Email: z.elyacoubi@agriculture.gov.ma Access Opportunity • Terms and Conditions • Privacy Policy • Security • About Us Powered by --> Product of -->

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.