Azerbaijan: Shaki Water and Wastewater Project

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Stated monetary amount — see source for its purposeEUR 57 million
Source / meaning
• Tranche 1 of up to EUR 57 million to finance the completion of construction of the wastewater treatment plant (WWTP) in Shaki (16,000m3/day capacity)
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Stated monetary amount — see source for its purposeEUR 34 million
Source / meaning
• Tranche 2 of up to EUR 34 million (uncommitted) to finance the construction of a WWTP and the water supply (146.4km) and sewerage (164km) networks, water reservoirs, pumping stations and chlorination stations in villages of Kish, Okhud and Gokhmud.
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Stated monetary amount — see source for its purposeEUR 91 million
Source / meaning
A sovereign loan in the amount of up to EUR 91 million.
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Stated monetary amount — see source for its purposeEUR 91 million
Source / meaning
A sovereign loan of up to EUR 91 million (in two tranches) to the Republic of Azerbaijan to finance the construction and rehabilitation of water, wastewater and stormwater management infrastructure in the city of Shaki and its nearby villages of Kish, Okhud and Gokhmud.
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Flow / treatment capacity per stated time unit16,000m3/day
Source / meaning
• Tranche 1 of up to EUR 57 million to finance the completion of construction of the wastewater treatment plant (WWTP) in Shaki (16,000m3/day capacity)
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Construction duration5 years
Source / meaning
construction of a WWTP sludge management facility (approx. 5 years storage capacity) including the installation of 0.8MWp PV panels
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Power capacity0.8MW
Source / meaning
construction of a WWTP sludge management facility (approx. 5 years storage capacity) including the installation of 0.8MWp PV panels
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Infrastructure length102.7km
Source / meaning
construction of water supply (102.7km), sewerage (148.3km) and stormwater (48.7km) networks, and 3 water reservoirs (5,750m3 capacity)
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Infrastructure length148.3km
Source / meaning
construction of water supply (102.7km), sewerage (148.3km) and stormwater (48.7km) networks, and 3 water reservoirs (5,750m3 capacity)
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Infrastructure length48.7km
Source / meaning
construction of water supply (102.7km), sewerage (148.3km) and stormwater (48.7km) networks, and 3 water reservoirs (5,750m3 capacity)
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Water / structure volume5,750m3
Source / meaning
construction of water supply (102.7km), sewerage (148.3km) and stormwater (48.7km) networks, and 3 water reservoirs (5,750m3 capacity)
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Infrastructure length146.4km
Source / meaning
• Tranche 2 of up to EUR 34 million (uncommitted) to finance the construction of a WWTP and the water supply (146.4km) and sewerage (164km) networks, water reservoirs, pumping stations and chlorination stations in villages of Kish, Okhud and Gokhmud.
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Infrastructure length164km
Source / meaning
• Tranche 2 of up to EUR 34 million (uncommitted) to finance the construction of a WWTP and the water supply (146.4km) and sewerage (164km) networks, water reservoirs, pumping stations and chlorination stations in villages of Kish, Okhud and Gokhmud.
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
View the official objective and scope excerpt
N/A · General Procurement Notice
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Only requirements explicitly found in the available official text are shown.
1

Organisation history and structure

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

2

Technical and managerial capability

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

3

Similar experience

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

4

Key personnel

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

5

Eligibility and legal requirements

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

6

Company financial capacity

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

7

Other employer-specific criteria

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

Complete retrieved official text
View Notice | ECEPP Skip to main content. • • • Attention Translation are provided to assist users. Please note that any data entered into the system must only be entered in English. OK Attention Translation are provided to assist users. Please note that any data entered into the system must only be entered in English. OK --> Login / Register • Home • About EBRD • Help • Security • Terms and Conditions • Privacy Policy • Home • About EBRD --> • Registration • Search Opportunities • News & Updates • Help --> Azerbaijan: Shaki Water and Wastewater Project General Procurement Notice Project Name: Shaki Water and Wastewater Project EBRD Project ID: 56006 Country: Azerbaijan Client Name: Azerbaijan State Water Resources Agency Type of Procurement: Goods,Works,Consultancy Business Sector: Municipal and Environmental Infrastructure Notice Type: General Procurement Notice Publication Date: 12/05/2026 17:28 Opportunity Status This opportunity is for information purposes only This opportunity is not yet open for response This opportunity is now open for response This opportunity is now closed for response Access Opportunity This opportunity is for information purposes only This is a General Procurement Notice and cannot be responded to directly. General Procurement Notice 1. Funding Details The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named project. Additional financing information: A sovereign loan in the amount of up to EUR 91 million. • Tranche 1 of up to EUR 57 million to finance the completion of construction of the wastewater treatment plant (WWTP) in Shaki (16,000m3/day capacity); construction of a WWTP sludge management facility (approx. 5 years storage capacity) including the installation of 0.8MWp PV panels; acquisition of O&M vehicles and machinery; construction of water supply (102.7km), sewerage (148.3km) and stormwater (48.7km) networks, and 3 water reservoirs (5,750m3 capacity); and services of a Project Implementation Support consultant. Tranche 1 will be co-financed by an investment grant of up to EUR 4 million from the Eastern Europe Energy Efficiency and Environment Partnership (E5P). • Tranche 2 of up to EUR 34 million (uncommitted) to finance the construction of a WWTP and the water supply (146.4km) and sewerage (164km) networks, water reservoirs, pumping stations and chlorination stations in villages of Kish, Okhud and Gokhmud. The Borrower will be financing the VAT, the cost of a Project Implementation Unit, external audit, and other Project related costs. 2. Information on the Project Project Description: A sovereign loan of up to EUR 91 million (in two tranches) to the Republic of Azerbaijan to finance the construction and rehabilitation of water, wastewater and stormwater management infrastructure in the city of Shaki and its nearby villages of Kish, Okhud and Gokhmud. Estimated Total Project Value 95,000,000.00 Currency EUR Procurement Type Goods,Works,Consultancy Estimated Start Date of Procurement 18/05/2026. 3. Other Information Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents. Procurement under this project will be conducted using the EBRD Client E-Procurement Portal (ECEPP). If you intend to participate in any procurement under this project, please ensure that you have registered in ECEPP ( https://ecepp.ebrd.com ). Registered entities will be notified directly when any procurement opportunities are published. 4. Client Address Mr. Fuad Abishev Azerbaijan State Water Resources Agency Administration of Facilities under Construction PLE 69 A Moscow Ave Baku AZ1012 Azerbaijan Tel. +994 12 4302578 Email: fuad.abishev@toom.gov.az Access Opportunity • Terms and Conditions • Privacy Policy • Security • About Us Powered by --> Product of -->

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.