GPN · صربستان

Serbia: GrCF3 W2 - Novi Sad Solar-Thermal Plant

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Power capacity31 MW
Source / meaning
(31 MW), heat pumps with a total capacity of 17 MW, and two electric boilers with a combined capacity of 60 MW.
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Power capacity17 MW
Source / meaning
(31 MW), heat pumps with a total capacity of 17 MW, and two electric boilers with a combined capacity of 60 MW.
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Power capacity60 MW
Source / meaning
(31 MW), heat pumps with a total capacity of 17 MW, and two electric boilers with a combined capacity of 60 MW.
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
Power capacity60 MW
Source / meaning
) and the Novi Sad district heating network, providing balancing capacity of up to 60 MW through the Power-to-Heat technology.
سامانه رسمی ECEPP بانک اروپایی بازسازی و توسعه — official notice / tender document
View the official objective and scope excerpt
N/A · General Procurement Notice
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Only requirements explicitly found in the available official text are shown.
1

Organisation history and structure

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

2

Technical and managerial capability

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

3

Similar experience

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

4

Key personnel

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

5

Eligibility and legal requirements

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

6

Company financial capacity

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

7

Other employer-specific criteria

Source text unavailable

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

Complete retrieved official text
View Notice | ECEPP Skip to main content. • • • Attention Translation are provided to assist users. Please note that any data entered into the system must only be entered in English. OK Attention Translation are provided to assist users. Please note that any data entered into the system must only be entered in English. OK --> Login / Register • Home • About EBRD • Help • Security • Terms and Conditions • Privacy Policy • Home • About EBRD --> • Registration • Search Opportunities • News & Updates • Help --> Serbia: GrCF3 W2 - Novi Sad Solar-Thermal Plant General Procurement Notice Project Name: GrCF3 W2 - Novi Sad Solar-Thermal Plant EBRD Project ID: 54524 Country: Serbia Client Name: Novi Sad District Heating Company Type of Procurement: Goods,Works Business Sector: Municipal and Environmental Infrastructure Notice Type: General Procurement Notice Publication Date: 12/11/2025 15:23 Opportunity Status This opportunity is for information purposes only This opportunity is not yet open for response This opportunity is now open for response This opportunity is now closed for response Access Opportunity This opportunity is for information purposes only This is a General Procurement Notice and cannot be responded to directly. General Procurement Notice 1. Funding Details The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named project. Additional financing information: EBRD Loan EUR 85 mil, WBIF Investment Grant 24.7 mil 2. Information on the Project Project Description: Construction of a large-scale solar-thermal plant, a seasonal storage and an absorption heat pump in Novi Sad/Novi Sad District Heating system Estimated Total Project Value 109,600,000.00 Currency EUR Procurement Type Goods,Works Estimated Start Date of Procurement 26/11/2025. 3. Other Information Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents. Procurement under this project will be conducted using the EBRD Client E-Procurement Portal (ECEPP). If you intend to participate in any procurement under this project, please ensure that you have registered in ECEPP ( https://ecepp.ebrd.com ). Registered entities will be notified directly when any procurement opportunities are published. The district heating system of Novi Sad currently relies entirely on natural gas as the primary energy source. The Project aims to decarbonise the system through the integration of large-scale solar-thermal technologies. It includes the construction and integration of a solar-thermal plant comprising two seasonal heat storage units with a total volume of approximately 870,000 m³, a solar collector field of about 39,000 m² (31 MW), heat pumps with a total capacity of 17 MW, and two electric boilers with a combined capacity of 60 MW. The seasonal heat storage will accumulate heat collected during summer or generated by electric boilers at times of electricity market surplus and low prices. During the heating season, the stored energy will be used through a heat pump. The system combines renewable solar energy (solar collector field), ambient heat from the Danube River (heat pump), and surplus electricity from the grid (electric boilers), supplying the district heating network. The project also enables sector coupling between the power system (EPS, CHP “Novi Sad”) and the Novi Sad district heating network, providing balancing capacity of up to 60 MW through the Power-to-Heat technology. The Consultant will provide PIU support, procurement and contract management, supervision of construction works, and ensure compliance with EBRD and national technical, environmental, and social requirements. 4. Client Address Maja Vukadinovic Ministry of Mining and Energy Nemanjina 22-26 Belgrade 11000 Serbia Tel. 0113604411 Email: maja.vukadinovic@mre.gov.rs Access Opportunity • Terms and Conditions • Privacy Policy • Security • About Us Powered by --> Product of -->

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.