RFP · ترکیه

Design and construction of infrastructure and superstructure, including electrification — Istanbul North Rail Crossing (INRAIL)

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗

Open the official listing and related documents

Official notice, TOR and amendments

SOURCE-BACKED SCREENING

Project objective and employer selection criteria

Official document · Medium confidence

1. Project objective

scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian

Important stated figures and their meaning
Infrastructure length122.3 km
Source / meaning
scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian
اداره زیرساخت وزارت حمل‌ونقل ترکیه — official notice / tender document
Infrastructure length4.7 km
Source / meaning
scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian
اداره زیرساخت وزارت حمل‌ونقل ترکیه — official notice / tender document
Infrastructure length36.2 km
Source / meaning
scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian
اداره زیرساخت وزارت حمل‌ونقل ترکیه — official notice / tender document
Infrastructure length127 km
Source / meaning
will finance the construction of a 127 km greenfield railway line designed to bypass the
اداره زیرساخت وزارت حمل‌ونقل ترکیه — official notice / tender document
Project lot / phaseLot 1
Source / meaning
Lot 1 — Construction and Electrification Works for the Çayırova – Sabiha Gökçen
اداره زیرساخت وزارت حمل‌ونقل ترکیه — official notice / tender document
Project lot / phaseLot 2
Source / meaning
Lot 2 — Construction and Electrification Works for the Kurtdoğmuş – Alibahadır
اداره زیرساخت وزارت حمل‌ونقل ترکیه — official notice / tender document
Project lot / phaseLot 3
Source / meaning
Lot 3 — Construction and Electrification Works for the Alibahadır – YSS Bridge –
اداره زیرساخت وزارت حمل‌ونقل ترکیه — official notice / tender document
Project lot / phaseLot 4
Source / meaning
Lot 4 — Construction and Electrification Works for the Mithatpaşa – İstanbul Airport
اداره زیرساخت وزارت حمل‌ونقل ترکیه — official notice / tender document
View the official objective and scope excerpt
scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Document review complete: the notice and 0 of 0 discovered attachment(s) were read.

No explicit requirement in this category was found in FANAB's currently available official text. This does not prove that the complete tender documents contain no such requirement.

3–6

Document, security and collaboration conditions

Technical / financial proposal security

The official text states a bid or proposal security requirement; stated amount: LOT 1. Check the source evidence below for the exact payment and validity terms.

Stated amount / value: LOT 1
Exact stated conditions
  • Description Proposal Security LOT 1 USD 5,000,000
View exact source evidence
e below. The proposal security should be enclosed in the envelope containing the Technical Part of the Proposal. in accordance with the provisions of the Request for Proposals. Description Proposal Security LOT 1 USD 5,000,000 LOT 2 USD 2,800,000 LOT 3 USD 2,800,000 LOT 4 USD 5,000,000 (ii) Local Labour Method Statement 11. Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful Proposer’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the RFP document.” 12. The address (es) referred…
Locator: اداره زیرساخت وزارت حمل‌ونقل ترکیه — official notice / tender document

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.