PLANNING, DESIGN AND CONSTRUCTION SUPERVISION FOR THE NEW DEPARTURE LEVEL BRIDGE, EXTENSION OF CONCOURSES AND ALLIED WORKS AT ALLAMA IQBAL INTERNATIONAL AIRPORT (AIIAP), LAHORE
A source-backed decision brief. The official notice and its addenda remain authoritative.
Open the official listing and related documents
Official notice, TOR and amendments
Important participation conditions
Foreign consulting firms require valid PEC licensing and a joint venture with a Pakistani firm. The international label confirms foreign participation, not satisfaction of other requirements or a verified formal ICB method.
Read the official conditions ↗Project objective and employer selection criteria
1. Project objective
The objective of the intended pre-qualification is the provision of "
PLANNING, DESIGN AND CONSTRUCTION SUPERVISION FOR THE NEW
DEPARTURE LEVEL BRIDGE, EXTENSION OF CONCOURSES AND ALLIED
WORKS AT ALLAMA IQBAL INTERNATIONAL AIRPORT (AIIAP), LAHORE "
through engagement of qualified consultants, and the purpose of this Prequalification Notice is to provide basic information to enable potential
applicants to decide whether or not to respond to this Pre-qualification Notice.
4.
Only the pre-qualified applicants shall be invited to participate in the
Request for Proposals (RFP) process, and it is expected that the RFP will be
issued to the Pre-qualified Applicants.
5.
The pre-qualification process is open to all National Applicants subject to
fulfilling the eligibility requirements mentioned in the respective Prequalification Documents.
Interested Applicants may obtain further information
from the Pakistan Airports Authority (Planning & Development Directorate)
through EPADS v2.0 during office hours.
A complete set of Pre-qualification
Documents may be accessed by interested Applicants through EPADS v2.0 at
Scope of Services 28
Evaluation Criteria 28
Letter of Application 28
Form A1 28
Form A2 & A3 1
Form A4 29
Form A5 29
Form A6 & A7 1
Form A8 30
Form A9 30
Layout Plan 30
Procurement Forms 32
Additional Forms and Documents 35
INVITATION FOR PRE-QUALIFICATION
PROCUREMENT OF CONSULTANCY SERVICES
1.
The Pakistan Airports Authority (Planning & Development
Directorate) has reserved Funds for the procurement planned for FY 2026-
27 .
The Pakistan Airports Authority (Planning & Development
Directorate) intends to apply part of the proceeds of this Fund to cover
eligible payments under the contract for the " PLANNING, DESIGN AND
CONSTRUCTION SUPERVISION FOR THE NEW DEPARTURE LEVEL
BRIDGE, EXTENSION OF CONCOURSES AND ALLIED WORKS AT ALLAMA
IQBAL INTERNATIONAL AIRPORT (AIIAP), LAHORE " with the reference of
"P108382"
2.
The Pakistan Airports Authority (Planning & Development
Directorate) intends to pre-qualify consulting firms / consultants for
subsequent issuance of Request for Proposals (RFP), and sign the contract
agreement(s) with the selected consultant(s) following the selection process.
3.
Scope of Services
The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents.
The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload
the complete scanned copy as an integral part of its submission.
Failure to comply with this requirement may
render the application non-responsive, in accordance with the applicable procurement rules and the
provisions of the PQ Documents
Technical Submission (Vendor)
Document Required
See Form Under Additional Forms and Documents: Scope of Services (page number: 36)
Evaluation Criteria
The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents.
The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload
the complete scanned copy as an integral part of its submission.
Failure to comply with this requirement may
render the application non-responsive, in accordance with the applicable procurement rules and the
provisions of the PQ Documents
Technical Submission (Vendor)
Document Required
See Form Under Additional Forms and Documents: Evaluation Criteria (page number: 41)
Letter of Application
The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with
all supporting documents required therein and the applicant shall upload the complete scanned copy as an
integral part of its submission.
Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents.
Technical Submission (Vendor)
Document Required
See Form Under Additional Forms and Documents: Letter of Application (page number: 49)
Form A1
The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with
all supporting documents required therein and the applicant shall upload the complete scanned copy as an e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 28 of 64
integral part of its submission.
Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents.
Technical Submission (Vendor)
Document Required
See Form Under Additional Forms and Documents: Form A1 (page number: 53)
Form A2 & A3
The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with
all supporting documents required therein and the applicant shall upload the complete scanned copy as an
integral part of its submission.
Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents.
Technical Submission (Vendor)
Document Required
See Form Under Additional Forms and Documents: Form A2 & A3 (page number: 55)
Form A4
The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with
all supporting documents required therein and the applicant shall upload the complete scanned copy as an
integral part of its submission.
Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents.
Technical Submission (Vendor)
Document Required
See Form Under Additional Forms and Documents: Form A4 (page number: 57)
Form A5
The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with
all supporting documents required therein and the applicant shall upload the complete scanned copy as an
integral part of its submission.
Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents.
Technical Submission (Vendor)
Document Required e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 29 of 64
See Form Under Additional Forms and Documents: Form A5 (page number: 58)
Form A6 & A7
The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with
all supporting documents required therein and the applicant shall upload the complete scanned copy as an
integral part of its submission.
Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents.
Technical Submission (Vendor)
Document Required
See Form Under Additional Forms and Documents: Form A6 & A7 (page number: 59)
Form A8
The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with
all supporting documents required therein and the applicant shall upload the complete scanned copy as an
integral part of its submission.
Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents.
Technical Submission (Vendor)
Document Required
See Form Under Additional Forms and Documents: Form A8 (page number: 61)
Form A9
The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with
all supporting documents required therein and the applicant shall upload the complete scanned copy as an
integral part of its submission.
Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents.
Technical Submission (Vendor)
Document Required
See Form Under Additional Forms and Documents: Form A9 (page number: 62)
Layout Plan e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 30 of 64
The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents.
The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload
the complete scanned copy as an integral part of its submission.
Technical Submission (Vendor)
Document Required
See Form Under Additional Forms and Documents: Layout Plan (page number: 64) e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 31 of 64
Procurement Forms e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 32 of 64
e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 33 of 64
e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 34 of 64
Additional Forms and Documents e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 35 of 64
P AKISTAN AIRPORTS AUTHORITY
CONSULTANCY SERVICES FOR
PLANNING, DESIGN AND CONSTRUCTION SUPERVISION FOR
THE NEW DEPARTURE LEVEL BRIDGE, EXTENSION OF
CONCOURSES AND ALLIED WORKS AT ALLAMA IQBAL
INTERNATIONAL AIRPORT (AIIAP), LAHORE
Expression of Interest Document
SEPTEMBER e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 36 of 64
INSTRUCTIONS TO APPLICANTS
1.
Scope of Services
1.1.
The Pakistan Airports Authority (hereinafter referred to as "the Employer")
intends to engage consultancy services for the assignment namely
"Consulting Services for Planning, Design and Construction Supervision for
the New Departure Level Bridge, Extension of Concourses and Allied Works
at Allama Iqbal International Airport (AIIAP), Lahore."
1.2.
The Consultant shall provide comprehensive consultancy services for
Planning, Design, Procurement Support and Construction Supervision for the
New Departure Level Bridge, Extension of Concourses and Allied Works at
Allama Iqbal International Airport (AIIAP), Lahore, including but not limited to
the following:
1.2.1.
Project Planning & Feasibility: Review existing airport infrastructure,
traffic conditions, passenger handling capacity and ongoing/related
projects;
undertake feasibility and viability studies, assessment of
alternatives, cost-benefit analysis, traffic forecasts and recommend
the most technically, economically and operationally viable solution.
The feasibility and options assessment shall specifically evaluate the
alignment, geometric and operational compatibility of the proposed
new Departure Level Bridge and Passenger Movement Bridge with (a)
the newly extended Passenger Terminal Building (Domestic side,
west/left) and (b) the proposed future terminal expansion
(International side, east/right), in line with the configuration indicated
in PAA's layout drawing, including Lane-1 and Lane-2 connections.
1.2.2.
Surveys & Investigations: Carry out all necessary site surveys, traffic
surveys/counts, investigations and geotechnical investigations,
including soil exploration, testing, bearing capacity, settlement
analysis, groundwater assessment and recommendations for
foundations/ground improvement.
Utility detection and mapping
surveys (including GPR scanning and/or trial pitting/potholing as
necessary) for all existing storm water drainage, sewerage, water
supply, electrical (HT/LT) and communication/IT utilities within and
adjacent to the footprint of the new bridge, its foundations/piers and
the proposed pedestrian connector structures, cross-verified against
as-built records held by PAA/CAA and the respective utility-owning
agencies.
1.2.3.
Traffic & Landside Planning: Undertake traffic impact and capacity
analysis, queue and delay assessment, Level of Service (LOS)
analysis and develop solutions to improve traffic circulation and
accommodate projected demand, while considering VIP access,
parking and other landside interfaces, direct connection from lower
ground car park levels to the concourse to avoid pedestrian crossing
at on-grade pick-up lanes and to ensure efficient passenger
movement system between parking, concourses and terminal
facilities.
e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 37 of 64
1.2.4.
Architectural & Engineering Design: Develop conceptual, preliminary
and detailed designs for the new departure level bridge, extension of
associated concourse areas and allied infrastructure, including
architectural, structural, civil, MEP, drainage, utilities, fire protection,
accessibility, landscaping, traffic management, wayfinding and
security-related requirements.
Accordingly, spaces to be proposed for
passenger and commercial amenities including but not limited to
dedicated washrooms, Food & Beverages, Airline Services, Banking &
ATMs, Hotel and Vehicle Registration kiosks, Tourism Information
Desks etc.
Design of the steel-structure pedestrian bridge connections
with canopy roofing shown in the layout, linking the new Departure
Level Bridge/Passenger Movement Bridge to (a) the extended
Domestic terminal on the left and (b) the proposed future International
expansion on the right, including architectural continuity/wayfinding
with the existing and expanded terminal, canopy glazing/cladding and
roof drainage, accessibility (ramps/lifts) and smoke management/firelife-safety design appropriate to a covered pedestrian walkway over
an active apron/roadway.
1.2.5.
Structural & Infrastructure Design: Design new bridge structures and
extension of concourses, foundations, decks, piers, transoms,
expansion joints, barriers and other structural components, including
assessment/reinforcement of existing structures and foundations
where required, considering applicable loading, seismic, wind,
dynamic, durability, serviceability and safety requirements.
Preferably
steel structure for the concourse extended weather protected area
having Aluminum cladded steel roof with skylights.
Structural steel
design of the pedestrian connector bridges and canopy (framing,
connections, bearings and expansion/movement joints to
accommodate differential movement between the new bridge, the
existing terminal structure and the future international expansion),
corrosion protection and fire-rating of structural steel, and
seismic/wind design of the canopy structure.
1.2.6.
Integration with Existing & Planned Facilities: Ensure seamless
integration of the proposed works with the existing airport
infrastructure, Passenger Terminal Building expansion and other
ongoing/planned developments, including assessment of alternative
arrangements for the existing departure bridge, concourse and dropoff facilities.
Structural and architectural tie-in with the two specific
adjoining developments shown in the layout — the completed
Domestic terminal extension (left) and the proposed future
International expansion (right) — including design of interim/temporary
closure details and future-proofed structural interfaces (e.g., stub
connections, embedded plates, expansion provisions) on the
International side to permit connection when that expansion is
subsequently built.
1.2.7.
BIM Implementation: Develop and maintain a coordinated BIM model
(LOD 400/500) covering architectural, structural, MEP,
traffic/wayfinding and other relevant disciplines, including 4D/5D
coordination, clash detection, asset tagging and preparation of an asbuilt BIM model for future operation and facility management.
Provide
BIM-related training/capacity building to designated personnel of the
Procuring Agency.
1.2.8.
Project Approval & Procurement Support: Prepare/update PC-I,
engineering estimates, rate analysis, quantity take-offs, technical
specifications, construction/IFC drawings, prequalification documents, e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 38 of 64
bidding documents and other procurement-related documentation,
and provide assistance during prequalification and bidding/evaluation
processes.
1.2.9.
Construction Supervision & Project Management: Act as the Engineer
in accordance with the applicable FIDIC provisions and provide
comprehensive construction supervision/project management services
through an appropriately staffed resident team, ensuring compliance
with approved designs, drawings, specifications, quality standards,
construction schedules and contractual requirements.
Supervision of
utility protection/relocation works and coordination with utility-owning
agencies and with the ongoing/parallel terminal-expansion
contractor(s) to avoid work-front conflicts and maintain uninterrupted
airport operations, passenger flow and life-safety systems during
construction .
1.2.10.
Contract Administration & Financial Management: Administer the
works contract, review Contractor’s submissions, shop drawings, work
programmes and procurement schedules;
certify IPCs and final
payments;
evaluate variations and claims;
assist in resolution of
contractual issues/disputes;
maintain project records and prepare
cost/progress reports and relevant Planning Commission
documentation.
1.2.11.
Quality, Safety & Environmental Management: Establish and monitor
QA/QC procedures, inspect works and materials, review testing and
commissioning, monitor Contractor’s HSE arrangements and ensure
implementation of appropriate safety, environmental and operational
requirements, particularly considering that the works are within an
operational airport environment.
Review of temporary works and
erection method statements for the structural steel pedestrian
bridge/canopy, and safety monitoring of utility diversion works and any
works within live airside/landside operational zones.
1.2.12.
Field Design Support Services (FDSS): Provide design support during
construction, including finalization/issuance of IFC drawings, review of
Contractor’s shop/working drawings, clarification of design issues,
review of proposed design revisions/material substitutions, and timely
resolution of design discrepancies, omissions or unforeseen site
conditions.
Field design support specific to tie-in works at the
interfaces with the existing terminal, the Domestic extension and
(when triggered) the future International expansion, and to resolution
of design issues arising from utility diversions encountered during
construction.
1.2.13.
Utility Identification, Impact Assessment & Relocation Design: Identify
all existing storm water drainage, sewerage, water supply, electrical
(HT/LT) and communication/IT utilities within and adjacent to the
project footprint;
assess the impact of the new bridge foundations,
piers, connector structures and canopy on such utilities;
prepare
protection-in-place measures where relocation is not warranted and
detailed relocation/diversion design (including temporary and
permanent diversions) where required;
prepare cases to obtain No-
Objection Certificates (NOCs) and approvals from the concerned
utility-owning entities (including relevant PAA services, the water &
sewerage agency, the power distribution company, and
telecom/communication operators);
and supervise utility
protection/relocation works during construction, coordinating
temporary diversions so as to maintain uninterrupted airport
operations throughout e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 39 of 64
1.2.14.
Post-Construction & Close-Out Services: During the Defects
Notification Period, undertake periodic inspections and supervision of
remedial works;
facilitate handing/taking-over, prepare final project
documentation, as-built drawings and BIM as-built model,
maintenance schedules/manuals, PC-IV/other close-out
documentation and assist the Procuring Agency in project close-out
and audit observations e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 40 of 64
2.
Submission of Applications
2.1.
Pakistan Airports Authority (PAA) invites application s from qualified consultants
or Joint Ventures of consultants (hereinafter referred to as “Applicant(s)) to
undertake the “Consulting Services for Planning, Design and Construction
Supervision for the Extension of Departure Level Bridge at Allama Iqbal
International Airport (AIIAP), Lahore."
2.2.
Applications for Expression of Interest must be prepared in accordance with the
instructions provided herein and should be clearly label l ed "Application for
Expression of Interest “Consulting Services for Planning, Design and
Construction Supervision for the Extension of Departure Level Bridge at Allama
Iqbal International Airport (AIIAP), Lahore”.
Applications shall only be
submitted electronically through the EPADS V2.0 platform .
2.3.
The Applicant is expected to examine all instructions, forms, and terms in the
Expression of Interest Documents and to furnish with its application all
information or documentation as is required by the Expression of Interest
Documents.
2.4.
All pages of the Expression of Interest Documents should be sequentially
numbered, stamped, and signed or initialed by an authorized representative.
2.5.
The Application as well as all correspondence and documents relating to the
Expression of Interest exchanged by the Applicant and the Employer, shall be
written in English language.
Supporting documents and printed literature that
are part of the Application may be in another language, provided they are
accompanied by an accurate translation of the relevant passages in the
English language, in which case, for purposes of interpretation of the
Application, the translation shall govern.
2.6.
Applicants are required to respond to all questions and provide complete
information as specified in this document.
Any false statements or omissions
of essential information may result in the disqualification of the Applicant.
2.7.
Applicants may request clarifications regarding the contents of the
Expression of Interest Documents in writing.
Responses to such queries will
be provided in writing within three working days, provided that the requests
are received at least seven calendar days before the deadline for submission
of the Expression of Interest Documents.
2.8.
The Employer reserves the right to amend the Expression of Interest
Documents at any time prior to the submission deadline by issuing addenda.
Any such addenda shall become an integral part of the Expression of Interest
Documents and will be communicated in writing to all parties by uploading
through the EPADS V2.0 platform.
2.9.
The Employer may, at its sole discretion, extend the deadline for the
Scope of services
The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Scope of Services (page number: 36) Evaluation Criteria The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Evaluation Criteria (page number: 41) Letter of Application The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Letter of Application (page number: 49) Form A1 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 28 of 64 integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A1 (page number: 53) Form A2 & A3 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A2 & A3 (page number: 55) Form A4 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A4 (page number: 57) Form A5 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 29 of 64 See Form Under Additional Forms and Documents: Form A5 (page number: 58) Form A6 & A7 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A6 & A7 (page number: 59) Form A8 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A8 (page number: 61) Form A9 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A9 (page number: 62) Layout Plan e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 30 of 64 The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Layout Plan (page number: 64) e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 31 of 64 Procurement Forms e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 32 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 33 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 34 of 64 Additional Forms and Documents e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 35 of 64 P AKISTAN AIRPORTS AUTHORITY CONSULTANCY SERVICES FOR PLANNING, DESIGN AND CONSTRUCTION SUPERVISION FOR THE NEW DEPARTURE LEVEL BRIDGE, EXTENSION OF CONCOURSES AND ALLIED WORKS AT ALLAMA IQBAL INTERNATIONAL AIRPORT (AIIAP), LAHORE Expression of Interest Document SEPTEMBER e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 36 of 64 INSTRUCTIONS TO APPLICANTS
Exact source section
The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Scope of Services (page number: 36) Evaluation Criteria The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Evaluation Criteria (page number: 41) Letter of Application The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Letter of Application (page number: 49) Form A1 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 28 of 64 integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A1 (page number: 53) Form A2 & A3 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A2 & A3 (page number: 55) Form A4 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A4 (page number: 57) Form A5 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 29 of 64 See Form Under Additional Forms and Documents: Form A5 (page number: 58) Form A6 & A7 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A6 & A7 (page number: 59) Form A8 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A8 (page number: 61) Form A9 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A9 (page number: 62) Layout Plan e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 30 of 64 The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Layout Plan (page number: 64) e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 31 of 64 Procurement Forms e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 32 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 33 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 34 of 64 Additional Forms and Documents e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 35 of 64 P AKISTAN AIRPORTS AUTHORITY CONSULTANCY SERVICES FOR PLANNING, DESIGN AND CONSTRUCTION SUPERVISION FOR THE NEW DEPARTURE LEVEL BRIDGE, EXTENSION OF CONCOURSES AND ALLIED WORKS AT ALLAMA IQBAL INTERNATIONAL AIRPORT (AIIAP), LAHORE Expression of Interest Document SEPTEMBER e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 36 of 64 INSTRUCTIONS TO APPLICANTS
Scope of services
1.1. The Pakistan Airports Authority (hereinafter referred to as "the Employer") intends to engage consultancy services for the assignment namely "Consulting Services for Planning, Design and Construction Supervision for the New Departure Level Bridge, Extension of Concourses and Allied Works at Allama Iqbal International Airport (AIIAP), Lahore." 1.2. The Consultant shall provide comprehensive consultancy services for Planning, Design, Procurement Support and Construction Supervision for the New Departure Level Bridge, Extension of Concourses and Allied Works at Allama Iqbal International Airport (AIIAP), Lahore, including but not limited to the following: 1.2.1. Project Planning & Feasibility: Review existing airport infrastructure, traffic conditions, passenger handling capacity and ongoing/related projects; undertake feasibility and viability studies, assessment of alternatives, cost-benefit analysis, traffic forecasts and recommend the most technically, economically and operationally viable solution. The feasibility and options assessment shall specifically evaluate the alignment, geometric and operational compatibility of the proposed new Departure Level Bridge and Passenger Movement Bridge with (a) the newly extended Passenger Terminal Building (Domestic side, west/left) and (b) the proposed future terminal expansion (International side, east/right), in line with the configuration indicated in PAA's layout drawing, including Lane-1 and Lane-2 connections. 1.2.2. Surveys & Investigations: Carry out all necessary site surveys, traffic surveys/counts, investigations and geotechnical investigations, including soil exploration, testing, bearing capacity, settlement analysis, groundwater assessment and recommendations for foundations/ground improvement. Utility detection and mapping surveys (including GPR scanning and/or trial pitting/potholing as necessary) for all existing storm water drainage, sewerage, water supply, electrical (HT/LT) and communication/IT utilities within and adjacent to the footprint of the new bridge, its foundations/piers and the proposed pedestrian connector structures, cross-verified against as-built records held by PAA/CAA and the respective utility-owning agencies. 1.2.3. Traffic & Landside Planning: Undertake traffic impact and capacity analysis, queue and delay assessment, Level of Service (LOS) analysis and develop solutions to improve traffic circulation and accommodate projected demand, while considering VIP access, parking and other landside interfaces, direct connection from lower ground car park levels to the concourse to avoid pedestrian crossing at on-grade pick-up lanes and to ensure efficient passenger movement system between parking, concourses and terminal facilities. e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 37 of 64 1.2.4. Architectural & Engineering Design: Develop conceptual, preliminary and detailed designs for the new departure level bridge, extension of associated concourse areas and allied infrastructure, including architectural, structural, civil, MEP, drainage, utilities, fire protection, accessibility, landscaping, traffic management, wayfinding and security-related requirements. Accordingly, spaces to be proposed for passenger and commercial amenities including but not limited to dedicated washrooms, Food & Beverages, Airline Services, Banking & ATMs, Hotel and Vehicle Registration kiosks, Tourism Information Desks etc. Design of the steel-structure pedestrian bridge connections with canopy roofing shown in the layout, linking the new Departure Level Bridge/Passenger Movement Bridge to (a) the extended Domestic terminal on the left and (b) the proposed future International expansion on the right, including architectural continuity/wayfinding with the existing and expanded terminal, canopy glazing/cladding and roof drainage, accessibility (ramps/lifts) and smoke management/firelife-safety design appropriate to a covered pedestrian walkway over an active apron/roadway. 1.2.5. Structural & Infrastructure Design: Design new bridge structures and extension of concourses, foundations, decks, piers, transoms, expansion joints, barriers and other structural components, including assessment/reinforcement of existing structures and foundations where required, considering applicable loading, seismic, wind, dynamic, durability, serviceability and safety requirements. Preferably steel structure for the concourse extended weather protected area having Aluminum cladded steel roof with skylights. Structural steel design of the pedestrian connector bridges and canopy (framing, connections, bearings and expansion/movement joints to accommodate differential movement between the new bridge, the existing terminal structure and the future international expansion), corrosion protection and fire-rating of structural steel, and seismic/wind design of the canopy structure. 1.2.6. Integration with Existing & Planned Facilities: Ensure seamless integration of the proposed works with the existing airport infrastructure, Passenger Terminal Building expansion and other ongoing/planned developments, including assessment of alternative arrangements for the existing departure bridge, concourse and dropoff facilities. Structural and architectural tie-in with the two specific adjoining developments shown in the layout — the completed Domestic terminal extension (left) and the proposed future International expansion (right) — including design of interim/temporary closure details and future-proofed structural interfaces (e.g., stub connections, embedded plates, expansion provisions) on the International side to permit connection when that expansion is subsequently built. 1.2.7. BIM Implementation: Develop and maintain a coordinated BIM model (LOD 400/500) covering architectural, structural, MEP, traffic/wayfinding and other relevant disciplines, including 4D/5D coordination, clash detection, asset tagging and preparation of an asbuilt BIM model for future operation and facility management. Provide BIM-related training/capacity building to designated personnel of the Procuring Agency. 1.2.8. Project Approval & Procurement Support: Prepare/update PC-I, engineering estimates, rate analysis, quantity take-offs, technical specifications, construction/IFC drawings, prequalification documents, e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 38 of 64 bidding documents and other procurement-related documentation, and provide assistance during prequalification and bidding/evaluation processes. 1.2.9. Construction Supervision & Project Management: Act as the Engineer in accordance with the applicable FIDIC provisions and provide comprehensive construction supervision/project management services through an appropriately staffed resident team, ensuring compliance with approved designs, drawings, specifications, quality standards, construction schedules and contractual requirements. Supervision of utility protection/relocation works and coordination with utility-owning agencies and with the ongoing/parallel terminal-expansion contractor(s) to avoid work-front conflicts and maintain uninterrupted airport operations, passenger flow and life-safety systems during construction . 1.2.10. Contract Administration & Financial Management: Administer the works contract, review Contractor’s submissions, shop drawings, work programmes and procurement schedules; certify IPCs and final payments; evaluate variations and claims; assist in resolution of contractual issues/disputes; maintain project records and prepare cost/progress reports and relevant Planning Commission documentation. 1.2.11. Quality, Safety & Environmental Management: Establish and monitor QA/QC procedures, inspect works and materials, review testing and commissioning, monitor Contractor’s HSE arrangements and ensure implementation of appropriate safety, environmental and operational requirements, particularly considering that the works are within an operational airport environment. Review of temporary works and erection method statements for the structural steel pedestrian bridge/canopy, and safety monitoring of utility diversion works and any works within live airside/landside operational zones. 1.2.12. Field Design Support Services (FDSS): Provide design support during construction, including finalization/issuance of IFC drawings, review of Contractor’s shop/working drawings, clarification of design issues, review of proposed design revisions/material substitutions, and timely resolution of design discrepancies, omissions or unforeseen site conditions. Field design support specific to tie-in works at the interfaces with the existing terminal, the Domestic extension and (when triggered) the future International expansion, and to resolution of design issues arising from utility diversions encountered during construction. 1.2.13. Utility Identification, Impact Assessment & Relocation Design: Identify all existing storm water drainage, sewerage, water supply, electrical (HT/LT) and communication/IT utilities within and adjacent to the project footprint; assess the impact of the new bridge foundations, piers, connector structures and canopy on such utilities; prepare protection-in-place measures where relocation is not warranted and detailed relocation/diversion design (including temporary and permanent diversions) where required; prepare cases to obtain No- Objection Certificates (NOCs) and approvals from the concerned utility-owning entities (including relevant PAA services, the water & sewerage agency, the power distribution company, and telecom/communication operators); and supervise utility protection/relocation works during construction, coordinating temporary diversions so as to maintain uninterrupted airport operations throughout e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 39 of 64 1.2.14. Post-Construction & Close-Out Services: During the Defects Notification Period, undertake periodic inspections and supervision of remedial works; facilitate handing/taking-over, prepare final project documentation, as-built drawings and BIM as-built model, maintenance schedules/manuals, PC-IV/other close-out documentation and assist the Procuring Agency in project close-out and audit observations e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 40 of 64 2. Submission of Applications 2.1. Pakistan Airports Authority (PAA) invites application s from qualified consultants or Joint Ventures of consultants (hereinafter referred to as “Applicant(s)) to undertake the “Consulting Services for Planning, Design and Construction Supervision for the Extension of Departure Level Bridge at Allama Iqbal International Airport (AIIAP), Lahore." 2.2. Applications for Expression of Interest must be prepared in accordance with the instructions provided herein and should be clearly label l ed "Application for Expression of Interest “Consulting Services for Planning, Design and Construction Supervision for the Extension of Departure Level Bridge at Allama Iqbal International Airport (AIIAP), Lahore”. Applications shall only be submitted electronically through the EPADS V2.0 platform . 2.3. The Applicant is expected to examine all instructions, forms, and terms in the Expression of Interest Documents and to furnish with its application all information or documentation as is required by the Expression of Interest Documents. 2.4. All pages of the Expression of Interest Documents should be sequentially numbered, stamped, and signed or initialed by an authorized representative. 2.5. The Application as well as all correspondence and documents relating to the Expression of Interest exchanged by the Applicant and the Employer, shall be written in English language. Supporting documents and printed literature that are part of the Application may be in another language, provided they are accompanied by an accurate translation of the relevant passages in the English language, in which case, for purposes of interpretation of the Application, the translation shall govern. 2.6. Applicants are required to respond to all questions and provide complete information as specified in this document. Any false statements or omissions of essential information may result in the disqualification of the Applicant. 2.7. Applicants may request clarifications regarding the contents of the Expression of Interest Documents in writing. Responses to such queries will be provided in writing within three working days, provided that the requests are received at least seven calendar days before the deadline for submission of the Expression of Interest Documents. 2.8. The Employer reserves the right to amend the Expression of Interest Documents at any time prior to the submission deadline by issuing addenda. Any such addenda shall become an integral part of the Expression of Interest Documents and will be communicated in writing to all parties by uploading through the EPADS V2.0 platform. 2.9. The Employer may, at its sole discretion, extend the deadline for the submission of Expression of Interest applications either on its own initiative or in response to requests from prospective Applicants, by issuing a corrigendum. 2.10. To facilitate the evaluation process, the Employer may request clarifications of any submitted information. Such requests shall be made in writing, and responses must be provided within a reasonable period, not to exceed five days. If an Applicant fails to provide the requested clarifications by the specified date and time, the application will be evaluated based solely on the information originally submitted. 2.11. The Applicant shall bear all costs associated with the preparation and submission of its Application. The Employer will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the Expression e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 41 of 64 of Interest process. 3. Evaluation/ Expression of Interest Criteria 3.1. General 3.1.1. Applicants shall be evaluated for shortlisting based on the criteria set forth in Clauses 3.2 to 3.3, which pertain to the Applicant’s Financial Soundness, General and Specific Experience and Personnel Capability, as demonstrated by the information provided in the Forms included herein. The experience and resources of Sub-Consultants shall not be considered in assessing the Applicant’s compliance with the qualifying criteria. However, in the case of Joint Ventures, the experience and resources of all participating firms will be evaluated in accordance with Clause 5. 3.1.2. The Employer reserves the right to verify or request clarification of any information submitted by Applicants. Any application containing false statements knowingly made by the Applicant, or any information provided in connection with the application that is incorrect in any respect and was intended to influence the Employer’s decision on shortlisting, may be rejected. Additionally, the Employer will take appropriate action in accordance with the PPRA regulatory framework concerning corrupt and fraudulent practices. 3.2. Mandatory Requirements 3.2.1. All Applicants must fulfill the mandatory requirements specified below and provide the supporting documentation accordingly. The documents submitted shall be considered final, and no amendments or additional submissions will be accepted thereafter. Failure to comply with the mandatory requirements set forth below will result in the application being deemed non-compliant and may lead to the disqualification of the Applicant. The mandatory requirements are outlined as follows: 3.2.1.1. Valid registration with the Pakistan Engineering Council (PEC) as a consultant. 3.2.1.2. The PEC registration mentioned in Clause 3.2.1.1 must include registration in Project Profile Codes 1215, and 1216 Service Codes of 0532, 0537 and 0546. In the case of a Joint Venture (JV), at least one member of the JV must meet this requirement. 3.2.1.3. All foreign consulting firms intending to participate in this procurement process must comply with the Pakistan Engineering Council (PEC) Bye-Laws. The foreign firm must hold a valid PEC registration as a Consulting Engineer/Consulting Firm under the Consulting Engineers/Consulting Firms Registration Regulations, permitting it to provide consultancy services in Pakistan. Foreign firms must participate through a Joint Venture (JV) with a Pakistani consulting firm duly registered with PEC. At the shortlisting stage, firms shall submit a Letter of Intent (LOI) to form a JV, executed on the letterhead of each JV partner, confirming their mutual commitment to jointly pursue this assignment. Project-specific PEC registration of the JV, as required under the PEC Bye-Laws, shall not be e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 42 of 64 required at the PQ stage. Firms found technically qualified at the PQ stage shall, as a condition for participation in the Request for Proposals (RFP) stage, submit evidence of the JV's project-specific registration with PEC, duly issued in accordance with the applicable PEC Bye-Laws, prior to or along with submission of the RFP. Failure to provide such project-specific registration at the RFP stage shall render the JV ineligible for further evaluation. 3.2.1.4. Registration with the Federal Board of Revenue (FBR) as an active taxpayer. For foreign firms participating in a JV, registration with the relevant authority in the jurisdiction of their registration is required. 3.2.1.5. Valid Registration with Securities & Exchange Commission of Pakistan (SECP). In case of Foreign Consultants participating in JV, Certificate of Incorporation in the firm’s Country of Origin is required. 3.2.1.6. Letter of Application ( Annexure A ), duly signed by an authorized representative of the Applicant. 3.2.1.7. Joint Venture agreement or a letter of intent to form such an agreement, duly signed by all members (in the case of a Joint Venture). 3.2.1.8. Power of Attorney (on non-judicial Stamp Paper valuing PKR 500) specifically authorizing the authorized representative to sign and submit the application for Expression of Interest on behalf of the Applicant. 3.2.1.9. Affidavit of non-Blacklisting on judicial stamp paper to the effect that the firm/ JV/ Consortium partner(s) has never been blacklisted with any Government Department/ Agency/ Authority 3.3. Detailed Evaluation After the initial screening of all Applicants, a detailed evaluation shall be undertaken using the following criteria based on the scoring system as follows: 3.3.1. Evaluation Criteria: The Applicants are required to qualify by meeting the minimum qualifying threshold in individual categories and overall qualification points as well . In the case of a Joint Venture (JV), the JV must collectively qualify the criteria as given hereunder : Category Points Max. Points Min. Qualifying threshold A. Financial Soundness 10 [50% of 10] = 05 B. General / Specific Experience 50 [50% of 50] = 25 C. Personnel 40 [50% of 40] = 20 Total Points 100 [70% of 100] =70 3.3.1.1. Financial Soundness: The financial capacity and soundness of the Applicant shall be ascertained on the basis of audited financial statements duly certified by a Chartered Accounting Firm submitted with ( Form A-4 ). Marks shall be awarded on the basis of the following criteria: - e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 43 of 64 Criteria, sub-criteria for assessment of Financial Soundness. Points (1) Average Annual Turnover of the Applicant Average Annual turnover for any three of last five financial years. Form A-4 shall be filled in this regard. [05 marks if average annual turnover of any three of last five financial years is PKR 500 million or above.] Average Turnover = (Year 1 + Year 2 + Year 3) ÷ 3 [For average turnover of less than PKR 500 million, marks shall be awarded as per following formula: (A × 5 / 500), where ‘A’ is average annual turnover in Million] 05 (2) Average Annual Working Capital Average Annual Working Capital for any three of last five financial years. Form A-4 shall be filled in this regard. Average Working Capital = (Year 1 + Year 2 + Year 3) ÷ 3 [05 marks if average working capital any three of last five financial years is PKR 300 million or above] [For average working capital of less than PKR 300 million, marks shall be awarded as per following formula: (A × 5 / 300), where ‘A’ is average annual working capital in Million] 05 Total Points for this criterion – ‘A’ 10 3.3.1.2. General/Specific Experience: Marks shall be awarded based on the following criteria for evaluation of the experience of the Applicant. Note: For the Applicant’s experience, either independent or as a member of JV, marks shall be awarded if the “Completion of Services (Design and/or Supervision)” and any other supporting document (clearly stating the date of completion of either Services and project cost) of the respective project is submitted with Form A-2 and A-3 . A particular project for an engineering design service can only be claimed against one of the sub-criteria below. Criteria, sub-criteria for assessment of Experience Points [1] Experience in General Engineering Consultancy Services General Experience of all types of engineering design consultancy services in the last ten (10) years for projects having a minimum overall Completion/Estimated Cost of PKR 1,000 million for local/ US $ 3.5 Million for foreign JV partner. Three (03) marks shall be awarded for each successfully 10 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 44 of 64 completed project. Maximum 10 Marks shall be awarded if ≥ 4 successfully completed project. [2] Experience in Roads & Highways Projects Experience of Engineering Design Services for Road and Highways projects with a minimum cost of the project of Rs 2,000 million for local / US $ 7.0 Million for foreign JV partner in the last fifteen (15) years. [05 Points for each successfully completed project with maximum of 10 Points]. 10 [3] Specific Experience of Bridge/Flyover a) Experience of Engineering Design Consultancy services for a bridge/Flyover project having minimum cost of the project of Rs 1,000 million for local/ US $ 7 Million for foreign JV partner in the last fifteen (15) years. [Eight (08) Points for each project with maximum of 16 Points for each successfully completed project.] b) Experience of construction supervision Consultancy services for a bridge/Flyover/Metro having minimum cost of the project of Rs 2,000 million for local/ US $ 7 Million for foreign JV partner in the last fifteen (15) years. [Seven (07) Points for each successfully completed project with maximum of 14 Points]. 30 Total Points for this criterion – ‘B’ 50 3.3.1.3. Key Personnel: Marks shall be awarded on the basis of the qualification and experience of the following key experts subject to submission of Form A-6 and A-7 for each Key Experts Criteria, sub-criteria for assessment of Personnel Capabilities Expert Minimum Academic Qualification Minimum Relevant Experience Maximum Points Project Team Leader M.Sc. Civil Engineering / Project Management Registered with PEC as Professional Engineer 10 years 05 Architect B.Sc. Architecture Registered with PCATP 10 years 05 Structural Design Engineer M.Sc. Civil (Structures) Registered with PEC as Professional Engineer 10 years 05 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 45 of 64 Pavement Design Engineer M.Sc. Civil (Transportation) Registered with PEC as Professional Engineer 10 years 05 Mechanical / HVAC Design Engineer M.Sc. Mechanical Registered with PEC as Professional Engineer 10 years 05 Electrical Design Engineer M.Sc. Electrical Registered with PEC as Professional Engineer 10 years 05 Network Design Engineer B.Sc. Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer 05 years 05 Contract Specialist B.Sc. Engineering Registered with PEC as Professional Engineer 10 years 05 Total Points for this criterion – ‘C’ 40 Note: In the case of foreign experts, registration with the relevant authority in the country of practice shall be submitted in place of PEC registration. The number of points to be assigned to each of the above positions shall be determined considering the following two sub-criteria and relevant percentage weights: Qualifications: 30% Relevant Experience: 70% Total weight: 100% Total for the Three Criteria (A+B+C): [100 Points] 3.4. Litigation History (Form A-8) 3.4.1. The Applicant is required to provide accurate and complete information regarding any litigation and/or arbitration involving their firm or Joint Venture (JV) that has arisen from contracts either completed or currently under execution. 4. Blacklisting & Other Affidavits (Form A-9) 4.1. The Applicant shall submit an undertaking or affidavit on non-judicial stamp paper of at least PKR 100, affirming the following: 4.1.1. The Applicant has never been blacklisted/ debarred by the government /Semi government or any autonomous body. 4.1.2. All documents, particulars, and information provided in the Expression of Interest application are accurate and true to the best of their knowledge. 4.1.3. The Applicant has never indulged in corrupt, fraudulent, or collusive practices in competing contracts. 5. Joint Venture (JV) 5.1. Joint Venture (JV) must comply with the following requirements: - e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 46 of 64 5.1.1. The maximum number of members in a Joint Venture (JV) shall not exceed three firms. Any Applicant consisting of a JV with more than three members shall be disqualified. 5.1.2. They must collectively qualify the criteria given in Clause 3 heretofore, for which purpose the relevant figures for each of the partners shall be added together to arrive at their total capacity. 5.1.3. If the Applicant is an existing or intended JV, submit a copy of the JV Agreement, or a letter of intent to enter into such an agreement in case of award of contract. The respective document shall be signed by all legally authorized signatories of all the parties to the existing or intended JV, as appropriate. All firms comprising the joint venture shall be legally constituted. 5.1.4. Each individual firm in the JV must be registered with income tax and sales tax departments and must be on the active taxpayers’ list of the Federal Board of Revenue. For foreign firms participating in a JV, registration with the relevant authority in the jurisdiction of their registration is required. 5.1.5. Application submitted by an existing or intended JV shall include an undertaking signed by all parties (i) stating that all parties shall be jointly and severally liable, and (ii) nominating a Representative who shall have the authority to conduct all business for and on behalf of any and all the parties the JV during the bidding process and, in the event the JV is awarded the contract, during contract execution. 5.1.6. Each Applicant shall submit only one proposal either by himself, or as a partner in a joint venture. An Applicant who submits more than one proposal will be disqualified and proposals submitted by him shall not be considered for evaluation and award. 5.1.7. Any change in a shortlisted JV after Expression of Interest shall not be allowed by the Employer. Consequently, the Request for Proposal (RFP) documents will not be issued, and proposals will not be accepted from any JV that has undergone changes following shortlisting. 6. Conflict of Interest 6.1. The Applicant, including all members of a Joint Venture (JV), must not be associated, nor have been associated in the past, with the Contractor or any other entity engaged by the Employer for the execution of works, provision of goods, non-consulting services, or in any other capacity that may give rise to a conflict of interest. Any such association may result in the disqualification of the Applicant. 7. Updating Expression of Interest Information 7.1. Applicants shall be required to update the financial, personnel and any other pertinent information used for shortlisting at the time of submitting their proposals, to confirm their continued compliance with the qualification criteria and verification of the information provided at the time of Expression of Interest. A proposal shall be rejected if the Applicant’s qualification thresholds are no longer met at the time of bidding. 8. Other Factors e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 47 of 64 8.1. Only Consultants and JVs that have been shortlisted under this procedure shall be invited to submit proposals. A qualified Consultant or a member of a qualified Joint Venture (JV), Consortium or Association shall participate only in one proposal for the Contract. If a firm submits more than one proposal, singly or as a Joint Venture (JV), Consortium or Association, all proposals including that consultant will be rejected. 8.2. The Employer reserves the right to:- 8.2.1. Amend the scope and value of any contract(s) for which proposals are to be solicited. In such an event, only those shortlisted consultants who meet the revised requirements of the contract(s) as amended shall be eligible to submit proposals. 8.2.2. Reject or accept any or all applications in accordance with the provisions set forth herein. 8.2.3. Cancel the Expression of Interest process and reject all applications. 8.3. The Employer shall neither be liable for any such actions nor be under any obligation to inform the Applicant of the grounds for rejection. However, the grounds for rejection may be communicated upon request. 9. Notification of Shortlisting 9.1. The Employer shall notify all Applicants in writing of the names of those Applicants who have been shortlisted. In addition, those Applicants who have been disqualified will be informed separately. The Shortlisting Result shall also be uploaded to EPADS. 10. Request for Proposal 10.1. After the notification of the results of the shortlisting, the Procuring Agency will invite the proposal from all the Applicants that have been shortlisted. e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 48 of 64 ANNEXURE-A e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 49 of 64 Annexure-A Letter of Application [Letterhead paper of the Applicant, or partner responsible for a joint venture, including full postal address, telephone No. fax no., telex no., cable and e-mail address] Date:................................ To: , . Sirs, 1. Being duly authorized to represent and act on behalf of................................... (hereinafter “the Applicant”) and having reviewed and fully understood all the Shortlisting information provided, the undersigned hereby apply to be shortlisted as a Consultant for assignment for the Consulting Services for Planning, Design And Construction Supervision For The New Departure Level Bridge, Extension Of Concourses and Allied Works at Allama Iqbal International Airport (AIIAP), Lahore. 2. Attached to this letter are copies of original documents defining 1 : (a) the Applicant's legal status; (b) the principal place of business; and (c) the place of incorporation (for Applicants who are corporations); OR the place of registration and the nationality of the owners (for Applicants who are partnerships or individually-owned firms). 3. Your Organization and its authorized representatives are hereby authorized to conduct any inquiries or investigations to verify the statements, documents, and information submitted in connection with this application, and to seek clarification from our bankers and clients regarding any financial and technical aspects. This Letter of Application will also serve as authorization to any individual or authorized representative of any institution referred to in the supporting information, to provide such information deemed necessary and requested by yourselves or the authorized representative to verify statements and information provided in this application, or with regard to the resources, experience, and competence of the Applicant. 1 For applications by joint ventures/consortiums/associations, all the information requested in the Shortlisting documents is to be provided for each member/ partner separately. All members/ partners shall sign the letter e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 50 of 64 4. Your Organization and its authorized representatives may contact the following persons for further information 2 , if needed. General and Managerial Inquiries Contact 1 Telephone Cell Fax Email Contact 2 Telephone Cell Fax Email Personnel Inquiries Contact 1 Telephone Cell Fax Email Contact 2 Telephone Cell Fax Email Technical Inquiries Contact 1 Telephone Cell Fax Email Contact 2 Telephone Cell Fax Email Financial Inquiries Contact 1 Telephone Cell Fax Email Contact 2 Telephone Cell Fax Email 2 Application by joint ventures/ consortium/ association should provide information on a separate sheet about each party to the application e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 51 of 64 5. This application is made with the full understanding that: (a) Proposals by shortlisted Applicants will be subjected to verification of all information submitted for Shortlisting at the time of bidding; (b) Your Organization reserves the right to: (i) amend the scope and value of any contract under this project; in such event proposal will only be called from shortlisted consultants who meet the revised requirements; and (ii) reject or accept any application, cancel the Shortlisting process, and reject applications; and (c) Your Organization shall not be liable for any such actions and its consequences and under no obligation to inform the Applicant of the grounds for actions at 5 (b) here above. 6. Appended to this application, we give details of the participation of each party, including capital contribution and profit/loss agreements, to the joint venture/consortium/ association. We also specify the financial commitment in terms of the percentage of the value of the (each) Contract and the responsibilities for execution of the (each) Contract. 7. We confirm that in the event that we submit a proposal, that proposal as well as any resulting Contract will be. (a) signed so as to legally bind all partners, jointly and severally; and (b) submitted with a Joint Venture/ consortium/ association agreement providing the joint and several liability of all partners in the event the contract is awarded to us. 8. We certify that the information provided in the Shortlisting document is correct and final to the best of our knowledge and nothing contained herein, is contrary to the facts as available with the firm’s official record and that Pakistan Airports Authority (PAA) (the Employer) has complete right to disregard our application should it fail to meet any of their Shortlisting criteria. 9. The undersigned declare that the statements made and the information provided in the duly completed application are complete, true, and correct in every detail. Signed Signed Name Name For and on behalf of (name of Applicant or lead/ authorized partner/ member of a joint venture, consortium or association) For and on behalf of (name(s) of other authorized partner(s)/ member(s) of a joint venture, consortium or association) Applicants who are not joint ventures/ consortium/ association should delete para 6 & 7 and initial the deletions. e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 52 of 64 APPLICATION FORMS e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 53 of 64 Application Form A-1 General Information All individual firms and each partner of a Joint Venture applying for Expression of Interest are requested to complete the information in this form. Nationality information is also to be provided for foreign owners or Applicants who are forming part of the Joint Venture, as required under the PEC Bye-Laws as a Joint Venture/ Consortium/ Association. The use of subconsultant is not allowed for this particular assignment. 1. Name of Firm 2. Head Office Address 3. Telephone Contact Person: Name: Title: 4. Fax 5. Email Cell 6. Place of Incorporation/Registration Year of incorporation/registration NAME AND NATIONALITY OF OWNERS NAME NATIONALITY 1. 2. 3. 4. 5. e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 54 of 64 Application Form A-2 List of General/Specific Experience for Completed Projects Complete the form below, listing each project under its respective category. Each project will be evaluated against only one sub-criterion. For each project listed, a separate Form A-3 must be submitted, accompanied by supporting documentation that is properly cross-referenced. Projects listed in Form A-2 shall be used for evaluation and any other information provided shall not be considered for evaluation. The State Bank’s “Exchange Rates for Market-to-Market Revaluation by Authorized Dealers in Foreign Exchange - Ready” 14 days prior to the submission deadline shall be used for conversion of other currencies to PKR. [1] EXPERIENCE IN GENERAL ENGINEERING CONSULTANCY SERVICES Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1. 2. [2] EXPERIENCE IN ROADS & HIGHWAYS PROJECTS Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1. 2. [3] SPECIFIC EXPERIENCE OF BRIDGE/FLYOVER Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1. 2. Name of Applicant or partner of a joint venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 55 of 64 Application Form A-3 Detail of General/Specific Experience for Completed Projects Use a separate sheet for each contract and attach a substantiating document with each sheet to facilitate in evaluation process The State Bank’s “Exchange Rates for Market-to-Market Revaluation by Authorized Dealers in Foreign Exchange - Ready” 14 days prior to the submission deadline shall be used for conversion of other currencies to PKR. Assignment name: Approx. value of the contract (in current PKR): Country: Location within country: Duration of assignment (months): Name of Client Name of Contractor Total No. of staff-months of the assignment: Address: Approx. value of the services provided by your firm under the contract (in current PKR): Start date (month/year): Completion date (month/year): No. of professional staff-months provided by associated consultants: Name of associated consultants, if any: Name of proposed senior professional staff of your firm involved and functions performed (indicate most significant profiles such as project director/coordinator, team leader): Sub-Criteria for Assessment of Experience as per table in Clause 3.1.1.2 [A particular project will be considered against only one sub-criteria] Please tick the relevant sub-criteria: [1] Experience in General Engineering. Consultancy Services [2] Experience in Roads & Highways [3] Specific experience of Bridge/Flyover Narrative description of project: Description of actual services provided by your staff within the assignment: Name of Applicant or partner of a joint venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 56 of 64 Application Form A-4 Financial Capability Applicants, including each partner of a joint venture, should provide financial information to demonstrate that they meet the requirements stated in the Instructions to Applicants. Each Applicant or partner of a joint venture must fill in this form. If necessary, use separate sheets to provide complete banker information. A copy of the audited balance sheets from the Chartered Accountant firm for any three of last five years i.e. 2020-21, 2021-22, 2022-23, 2023-24, and 2024-25 shall be attached to this Form. The State Bank’s “Exchange Rates for Market-to-Market Revaluation by Authorized Dealers in Foreign Exchange - Ready” 14 days prior to the submission deadline shall be used for conversion of other currencies to PKR. Financial Information (PKR) Historical information for any three of last five years (PKR, in millions) ---- ---- ---- Information from Balance Sheet (1) Total Assets (TA) (2) Current Assets (CA) (3) Total Liabilities (TL) (4) Current Liabilities (CL) Information from Income Statement (5) Total Revenue (TR) (6) Profits before Taxes (PBT) Net Worth (1) – (3) Current Ratio (2) / (4) Working Capital (2) – (4) Name of Applicant or Partner of a Joint Venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 57 of 64 Application Form A-5 Joint Venture Summary (if applicable) NAME OF ALL PARTNERS OF A JOINT VENTURE 1. Lead Partner 2. Partner 3. Partner ANNUAL TURNOVER DATA (Equivalent in PKR, millions) Partner Form A-4 Page No. Year…. Year ------- Year ------ 1. Lead Partner 2. Partner 3. Partner Total: ANNUAL WORKING CAPITAL (Equivalent in PKR, millions) Partner Form A-4 Page No. Year…. Year…. Year….. 1. Lead Partner 2. Partner 3. Partner Total: e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 58 of 64 Application Form A-6 Personnel Capabilities For specific positions essential to assignment, Applicants should provide the names of Key Experts qualified to meet the specified requirements stated for each position in Clause 3.3.1.3. The data on their experience should be supplied on separate sheets using one Form for each candidate (Application Form A-7 ) along with CVs of candidates duly signed by the Key Expert . The CVs of other Experts which are not specified in this FORM shall not be considered for evaluation 1. Title of Position Name of Prime Candidate 2. Title of Position Name of Prime Candidate 3. Title of Position Name of Prime Candidate 4. Title of Position Name of Prime Candidate 5. Title of Position Name of Prime Candidate 6. Title of Position Name of Prime Candidate Name of Applicant or partner of a Joint Venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 59 of 64 Application Form A-7 Candidate Summary Position Candidate information Name of Candidate Date of Birth Professional Qualification PEC / PCATP Number: Present employment Name of Employer: Address of Employer: Telephone Contact (manager/personnel officer) Fax Email Job title of candidate Years with present employer Summarize professional experience in reverse chronological order. Indicate particular technical and managerial experience relevant to the Project. Month/Dates/Years Company / Project / Position / Relevant technical and management experience From To Name of Applicant or partner of a Joint Venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 60 of 64 Application Form A-8 Litigation History Applicants, including each of the partners of a joint venture, should provide information on any history of litigation or arbitration resulting from contracts executed or currently under execution (Instructions to Applicants, Clause 3.4.1). A separate sheet should be used for each partner of the joint venture. Year Award FOR or AGAINST Applicant Name of Client, cause of litigation, and matter in dispute Disputed amount (current value PKR or equivalent) Name of Applicant or Partner of a Joint Venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 61 of 64 Application Form A-9 Additional Information Sr. Description Attached Not Attached Tick only one 1. Valid registration with the Pakistan Engineering Council (PEC) as a consultant including Profile Codes 1215, and 1216 and Service Codes of 0532, 0537 and 0546. In the case of a Joint Venture (JV), at least one member of the JV must meet this requirement 2. Valid PEC registration as a Consulting Engineer/Consulting Firm under the Consulting Engineers/Consulting Firms Registration Regulations, permitting it to provide consultancy services in Pakistan permitting the foreign firm to provide consultancy services in Pakistan. 3. JV Agreement or Letter of Intent (LOI) to form a JV, executed on the letterhead of each JV partner, confirming their mutual commitment to jointly pursue this assignment. (In case of JV) 4. Certificate of registration (NTN) with FBR along with proof of Active Tax Payer in Pakistan or relevant authority in case of foreign firm in JV 5. Valid Registration with Securities & Exchange Commission of Pakistan (SECP). In case of Foreign Consultants participating in JV, Certificate of Incorporation in the firm’s Country of Origin 6. Power of Attorney (on non-judicial Stamp Paper valuing PKR 500) specifically authorizing the authorized representative to sign and submit the application for Expression of Interest on behalf of the Applicant. 7. Letter of Application ( Annexure A ), duly signed by an authorized representative of the Applicant. 8. Affidavit of non-Blacklisting on judicial stamp paper to the effect that the firm/ JV/ Consortium partner(s) has never been blacklisted with any Government Department/ Agency/ Authority. 9. An affidavit to the effect that all documents / particulars / information given with this Expression of Interest document are true. 10. An affidavit to the effect that the Applicant has never indulged in corrupt, fraudulent or collusive practice in competing for contracts. 11. An affidavit to the effect that the firm is not presently involved nor has been in the past in litigation with the Employer. Should this be otherwise the Applicant must provide such details in Form A-8 “Litigation History”. Name of Applicant or partner of a joint venture: e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 62 of 64 Note: Any other pertinent information in support of this Expression of Interest should also be furnished and details mentioned below. Sr. Description Remarks e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 63 of 64 ASF WT 09 VORANT • , CANT PLOT MATCH UNE RAMP AREA RAMP P LA CH. FUEL AREA WATER )?ate| O OFFICES SUB STATION C A A LAND PH feH LEGEND - 500' / EXISTING TERMINAL BUILDING TERMINAL BUILDING EXPANSION EXISTING DEPARTURE LEVEL BRIDGE PROPOSED DEPARTURE BRIDGE AS PER ORIGINAL EXPANSION PLAN BY M/S TYPSA-ASIAN JV I 'V e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 64 of 64
Exact source section
1.1. The Pakistan Airports Authority (hereinafter referred to as "the Employer") intends to engage consultancy services for the assignment namely "Consulting Services for Planning, Design and Construction Supervision for the New Departure Level Bridge, Extension of Concourses and Allied Works at Allama Iqbal International Airport (AIIAP), Lahore." 1.2. The Consultant shall provide comprehensive consultancy services for Planning, Design, Procurement Support and Construction Supervision for the New Departure Level Bridge, Extension of Concourses and Allied Works at Allama Iqbal International Airport (AIIAP), Lahore, including but not limited to the following: 1.2.1. Project Planning & Feasibility: Review existing airport infrastructure, traffic conditions, passenger handling capacity and ongoing/related projects; undertake feasibility and viability studies, assessment of alternatives, cost-benefit analysis, traffic forecasts and recommend the most technically, economically and operationally viable solution. The feasibility and options assessment shall specifically evaluate the alignment, geometric and operational compatibility of the proposed new Departure Level Bridge and Passenger Movement Bridge with (a) the newly extended Passenger Terminal Building (Domestic side, west/left) and (b) the proposed future terminal expansion (International side, east/right), in line with the configuration indicated in PAA's layout drawing, including Lane-1 and Lane-2 connections. 1.2.2. Surveys & Investigations: Carry out all necessary site surveys, traffic surveys/counts, investigations and geotechnical investigations, including soil exploration, testing, bearing capacity, settlement analysis, groundwater assessment and recommendations for foundations/ground improvement. Utility detection and mapping surveys (including GPR scanning and/or trial pitting/potholing as necessary) for all existing storm water drainage, sewerage, water supply, electrical (HT/LT) and communication/IT utilities within and adjacent to the footprint of the new bridge, its foundations/piers and the proposed pedestrian connector structures, cross-verified against as-built records held by PAA/CAA and the respective utility-owning agencies. 1.2.3. Traffic & Landside Planning: Undertake traffic impact and capacity analysis, queue and delay assessment, Level of Service (LOS) analysis and develop solutions to improve traffic circulation and accommodate projected demand, while considering VIP access, parking and other landside interfaces, direct connection from lower ground car park levels to the concourse to avoid pedestrian crossing at on-grade pick-up lanes and to ensure efficient passenger movement system between parking, concourses and terminal facilities. e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 37 of 64 1.2.4. Architectural & Engineering Design: Develop conceptual, preliminary and detailed designs for the new departure level bridge, extension of associated concourse areas and allied infrastructure, including architectural, structural, civil, MEP, drainage, utilities, fire protection, accessibility, landscaping, traffic management, wayfinding and security-related requirements. Accordingly, spaces to be proposed for passenger and commercial amenities including but not limited to dedicated washrooms, Food & Beverages, Airline Services, Banking & ATMs, Hotel and Vehicle Registration kiosks, Tourism Information Desks etc. Design of the steel-structure pedestrian bridge connections with canopy roofing shown in the layout, linking the new Departure Level Bridge/Passenger Movement Bridge to (a) the extended Domestic terminal on the left and (b) the proposed future International expansion on the right, including architectural continuity/wayfinding with the existing and expanded terminal, canopy glazing/cladding and roof drainage, accessibility (ramps/lifts) and smoke management/firelife-safety design appropriate to a covered pedestrian walkway over an active apron/roadway. 1.2.5. Structural & Infrastructure Design: Design new bridge structures and extension of concourses, foundations, decks, piers, transoms, expansion joints, barriers and other structural components, including assessment/reinforcement of existing structures and foundations where required, considering applicable loading, seismic, wind, dynamic, durability, serviceability and safety requirements. Preferably steel structure for the concourse extended weather protected area having Aluminum cladded steel roof with skylights. Structural steel design of the pedestrian connector bridges and canopy (framing, connections, bearings and expansion/movement joints to accommodate differential movement between the new bridge, the existing terminal structure and the future international expansion), corrosion protection and fire-rating of structural steel, and seismic/wind design of the canopy structure. 1.2.6. Integration with Existing & Planned Facilities: Ensure seamless integration of the proposed works with the existing airport infrastructure, Passenger Terminal Building expansion and other ongoing/planned developments, including assessment of alternative arrangements for the existing departure bridge, concourse and dropoff facilities. Structural and architectural tie-in with the two specific adjoining developments shown in the layout — the completed Domestic terminal extension (left) and the proposed future International expansion (right) — including design of interim/temporary closure details and future-proofed structural interfaces (e.g., stub connections, embedded plates, expansion provisions) on the International side to permit connection when that expansion is subsequently built. 1.2.7. BIM Implementation: Develop and maintain a coordinated BIM model (LOD 400/500) covering architectural, structural, MEP, traffic/wayfinding and other relevant disciplines, including 4D/5D coordination, clash detection, asset tagging and preparation of an asbuilt BIM model for future operation and facility management. Provide BIM-related training/capacity building to designated personnel of the Procuring Agency. 1.2.8. Project Approval & Procurement Support: Prepare/update PC-I, engineering estimates, rate analysis, quantity take-offs, technical specifications, construction/IFC drawings, prequalification documents, e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 38 of 64 bidding documents and other procurement-related documentation, and provide assistance during prequalification and bidding/evaluation processes. 1.2.9. Construction Supervision & Project Management: Act as the Engineer in accordance with the applicable FIDIC provisions and provide comprehensive construction supervision/project management services through an appropriately staffed resident team, ensuring compliance with approved designs, drawings, specifications, quality standards, construction schedules and contractual requirements. Supervision of utility protection/relocation works and coordination with utility-owning agencies and with the ongoing/parallel terminal-expansion contractor(s) to avoid work-front conflicts and maintain uninterrupted airport operations, passenger flow and life-safety systems during construction . 1.2.10. Contract Administration & Financial Management: Administer the works contract, review Contractor’s submissions, shop drawings, work programmes and procurement schedules; certify IPCs and final payments; evaluate variations and claims; assist in resolution of contractual issues/disputes; maintain project records and prepare cost/progress reports and relevant Planning Commission documentation. 1.2.11. Quality, Safety & Environmental Management: Establish and monitor QA/QC procedures, inspect works and materials, review testing and commissioning, monitor Contractor’s HSE arrangements and ensure implementation of appropriate safety, environmental and operational requirements, particularly considering that the works are within an operational airport environment. Review of temporary works and erection method statements for the structural steel pedestrian bridge/canopy, and safety monitoring of utility diversion works and any works within live airside/landside operational zones. 1.2.12. Field Design Support Services (FDSS): Provide design support during construction, including finalization/issuance of IFC drawings, review of Contractor’s shop/working drawings, clarification of design issues, review of proposed design revisions/material substitutions, and timely resolution of design discrepancies, omissions or unforeseen site conditions. Field design support specific to tie-in works at the interfaces with the existing terminal, the Domestic extension and (when triggered) the future International expansion, and to resolution of design issues arising from utility diversions encountered during construction. 1.2.13. Utility Identification, Impact Assessment & Relocation Design: Identify all existing storm water drainage, sewerage, water supply, electrical (HT/LT) and communication/IT utilities within and adjacent to the project footprint; assess the impact of the new bridge foundations, piers, connector structures and canopy on such utilities; prepare protection-in-place measures where relocation is not warranted and detailed relocation/diversion design (including temporary and permanent diversions) where required; prepare cases to obtain No- Objection Certificates (NOCs) and approvals from the concerned utility-owning entities (including relevant PAA services, the water & sewerage agency, the power distribution company, and telecom/communication operators); and supervise utility protection/relocation works during construction, coordinating temporary diversions so as to maintain uninterrupted airport operations throughout e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 39 of 64 1.2.14. Post-Construction & Close-Out Services: During the Defects Notification Period, undertake periodic inspections and supervision of remedial works; facilitate handing/taking-over, prepare final project documentation, as-built drawings and BIM as-built model, maintenance schedules/manuals, PC-IV/other close-out documentation and assist the Procuring Agency in project close-out and audit observations e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 40 of 64 2. Submission of Applications 2.1. Pakistan Airports Authority (PAA) invites application s from qualified consultants or Joint Ventures of consultants (hereinafter referred to as “Applicant(s)) to undertake the “Consulting Services for Planning, Design and Construction Supervision for the Extension of Departure Level Bridge at Allama Iqbal International Airport (AIIAP), Lahore." 2.2. Applications for Expression of Interest must be prepared in accordance with the instructions provided herein and should be clearly label l ed "Application for Expression of Interest “Consulting Services for Planning, Design and Construction Supervision for the Extension of Departure Level Bridge at Allama Iqbal International Airport (AIIAP), Lahore”. Applications shall only be submitted electronically through the EPADS V2.0 platform . 2.3. The Applicant is expected to examine all instructions, forms, and terms in the Expression of Interest Documents and to furnish with its application all information or documentation as is required by the Expression of Interest Documents. 2.4. All pages of the Expression of Interest Documents should be sequentially numbered, stamped, and signed or initialed by an authorized representative. 2.5. The Application as well as all correspondence and documents relating to the Expression of Interest exchanged by the Applicant and the Employer, shall be written in English language. Supporting documents and printed literature that are part of the Application may be in another language, provided they are accompanied by an accurate translation of the relevant passages in the English language, in which case, for purposes of interpretation of the Application, the translation shall govern. 2.6. Applicants are required to respond to all questions and provide complete information as specified in this document. Any false statements or omissions of essential information may result in the disqualification of the Applicant. 2.7. Applicants may request clarifications regarding the contents of the Expression of Interest Documents in writing. Responses to such queries will be provided in writing within three working days, provided that the requests are received at least seven calendar days before the deadline for submission of the Expression of Interest Documents. 2.8. The Employer reserves the right to amend the Expression of Interest Documents at any time prior to the submission deadline by issuing addenda. Any such addenda shall become an integral part of the Expression of Interest Documents and will be communicated in writing to all parties by uploading through the EPADS V2.0 platform. 2.9. The Employer may, at its sole discretion, extend the deadline for the submission of Expression of Interest applications either on its own initiative or in response to requests from prospective Applicants, by issuing a corrigendum. 2.10. To facilitate the evaluation process, the Employer may request clarifications of any submitted information. Such requests shall be made in writing, and responses must be provided within a reasonable period, not to exceed five days. If an Applicant fails to provide the requested clarifications by the specified date and time, the application will be evaluated based solely on the information originally submitted. 2.11. The Applicant shall bear all costs associated with the preparation and submission of its Application. The Employer will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the Expression e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 41 of 64 of Interest process. 3. Evaluation/ Expression of Interest Criteria 3.1. General 3.1.1. Applicants shall be evaluated for shortlisting based on the criteria set forth in Clauses 3.2 to 3.3, which pertain to the Applicant’s Financial Soundness, General and Specific Experience and Personnel Capability, as demonstrated by the information provided in the Forms included herein. The experience and resources of Sub-Consultants shall not be considered in assessing the Applicant’s compliance with the qualifying criteria. However, in the case of Joint Ventures, the experience and resources of all participating firms will be evaluated in accordance with Clause 5. 3.1.2. The Employer reserves the right to verify or request clarification of any information submitted by Applicants. Any application containing false statements knowingly made by the Applicant, or any information provided in connection with the application that is incorrect in any respect and was intended to influence the Employer’s decision on shortlisting, may be rejected. Additionally, the Employer will take appropriate action in accordance with the PPRA regulatory framework concerning corrupt and fraudulent practices. 3.2. Mandatory Requirements 3.2.1. All Applicants must fulfill the mandatory requirements specified below and provide the supporting documentation accordingly. The documents submitted shall be considered final, and no amendments or additional submissions will be accepted thereafter. Failure to comply with the mandatory requirements set forth below will result in the application being deemed non-compliant and may lead to the disqualification of the Applicant. The mandatory requirements are outlined as follows: 3.2.1.1. Valid registration with the Pakistan Engineering Council (PEC) as a consultant. 3.2.1.2. The PEC registration mentioned in Clause 3.2.1.1 must include registration in Project Profile Codes 1215, and 1216 Service Codes of 0532, 0537 and 0546. In the case of a Joint Venture (JV), at least one member of the JV must meet this requirement. 3.2.1.3. All foreign consulting firms intending to participate in this procurement process must comply with the Pakistan Engineering Council (PEC) Bye-Laws. The foreign firm must hold a valid PEC registration as a Consulting Engineer/Consulting Firm under the Consulting Engineers/Consulting Firms Registration Regulations, permitting it to provide consultancy services in Pakistan. Foreign firms must participate through a Joint Venture (JV) with a Pakistani consulting firm duly registered with PEC. At the shortlisting stage, firms shall submit a Letter of Intent (LOI) to form a JV, executed on the letterhead of each JV partner, confirming their mutual commitment to jointly pursue this assignment. Project-specific PEC registration of the JV, as required under the PEC Bye-Laws, shall not be e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 42 of 64 required at the PQ stage. Firms found technically qualified at the PQ stage shall, as a condition for participation in the Request for Proposals (RFP) stage, submit evidence of the JV's project-specific registration with PEC, duly issued in accordance with the applicable PEC Bye-Laws, prior to or along with submission of the RFP. Failure to provide such project-specific registration at the RFP stage shall render the JV ineligible for further evaluation. 3.2.1.4. Registration with the Federal Board of Revenue (FBR) as an active taxpayer. For foreign firms participating in a JV, registration with the relevant authority in the jurisdiction of their registration is required. 3.2.1.5. Valid Registration with Securities & Exchange Commission of Pakistan (SECP). In case of Foreign Consultants participating in JV, Certificate of Incorporation in the firm’s Country of Origin is required. 3.2.1.6. Letter of Application ( Annexure A ), duly signed by an authorized representative of the Applicant. 3.2.1.7. Joint Venture agreement or a letter of intent to form such an agreement, duly signed by all members (in the case of a Joint Venture). 3.2.1.8. Power of Attorney (on non-judicial Stamp Paper valuing PKR 500) specifically authorizing the authorized representative to sign and submit the application for Expression of Interest on behalf of the Applicant. 3.2.1.9. Affidavit of non-Blacklisting on judicial stamp paper to the effect that the firm/ JV/ Consortium partner(s) has never been blacklisted with any Government Department/ Agency/ Authority 3.3. Detailed Evaluation After the initial screening of all Applicants, a detailed evaluation shall be undertaken using the following criteria based on the scoring system as follows: 3.3.1. Evaluation Criteria: The Applicants are required to qualify by meeting the minimum qualifying threshold in individual categories and overall qualification points as well . In the case of a Joint Venture (JV), the JV must collectively qualify the criteria as given hereunder : Category Points Max. Points Min. Qualifying threshold A. Financial Soundness 10 [50% of 10] = 05 B. General / Specific Experience 50 [50% of 50] = 25 C. Personnel 40 [50% of 40] = 20 Total Points 100 [70% of 100] =70 3.3.1.1. Financial Soundness: The financial capacity and soundness of the Applicant shall be ascertained on the basis of audited financial statements duly certified by a Chartered Accounting Firm submitted with ( Form A-4 ). Marks shall be awarded on the basis of the following criteria: - e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 43 of 64 Criteria, sub-criteria for assessment of Financial Soundness. Points (1) Average Annual Turnover of the Applicant Average Annual turnover for any three of last five financial years. Form A-4 shall be filled in this regard. [05 marks if average annual turnover of any three of last five financial years is PKR 500 million or above.] Average Turnover = (Year 1 + Year 2 + Year 3) ÷ 3 [For average turnover of less than PKR 500 million, marks shall be awarded as per following formula: (A × 5 / 500), where ‘A’ is average annual turnover in Million] 05 (2) Average Annual Working Capital Average Annual Working Capital for any three of last five financial years. Form A-4 shall be filled in this regard. Average Working Capital = (Year 1 + Year 2 + Year 3) ÷ 3 [05 marks if average working capital any three of last five financial years is PKR 300 million or above] [For average working capital of less than PKR 300 million, marks shall be awarded as per following formula: (A × 5 / 300), where ‘A’ is average annual working capital in Million] 05 Total Points for this criterion – ‘A’ 10 3.3.1.2. General/Specific Experience: Marks shall be awarded based on the following criteria for evaluation of the experience of the Applicant. Note: For the Applicant’s experience, either independent or as a member of JV, marks shall be awarded if the “Completion of Services (Design and/or Supervision)” and any other supporting document (clearly stating the date of completion of either Services and project cost) of the respective project is submitted with Form A-2 and A-3 . A particular project for an engineering design service can only be claimed against one of the sub-criteria below. Criteria, sub-criteria for assessment of Experience Points [1] Experience in General Engineering Consultancy Services General Experience of all types of engineering design consultancy services in the last ten (10) years for projects having a minimum overall Completion/Estimated Cost of PKR 1,000 million for local/ US $ 3.5 Million for foreign JV partner. Three (03) marks shall be awarded for each successfully 10 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 44 of 64 completed project. Maximum 10 Marks shall be awarded if ≥ 4 successfully completed project. [2] Experience in Roads & Highways Projects Experience of Engineering Design Services for Road and Highways projects with a minimum cost of the project of Rs 2,000 million for local / US $ 7.0 Million for foreign JV partner in the last fifteen (15) years. [05 Points for each successfully completed project with maximum of 10 Points]. 10 [3] Specific Experience of Bridge/Flyover a) Experience of Engineering Design Consultancy services for a bridge/Flyover project having minimum cost of the project of Rs 1,000 million for local/ US $ 7 Million for foreign JV partner in the last fifteen (15) years. [Eight (08) Points for each project with maximum of 16 Points for each successfully completed project.] b) Experience of construction supervision Consultancy services for a bridge/Flyover/Metro having minimum cost of the project of Rs 2,000 million for local/ US $ 7 Million for foreign JV partner in the last fifteen (15) years. [Seven (07) Points for each successfully completed project with maximum of 14 Points]. 30 Total Points for this criterion – ‘B’ 50 3.3.1.3. Key Personnel: Marks shall be awarded on the basis of the qualification and experience of the following key experts subject to submission of Form A-6 and A-7 for each Key Experts Criteria, sub-criteria for assessment of Personnel Capabilities Expert Minimum Academic Qualification Minimum Relevant Experience Maximum Points Project Team Leader M.Sc. Civil Engineering / Project Management Registered with PEC as Professional Engineer 10 years 05 Architect B.Sc. Architecture Registered with PCATP 10 years 05 Structural Design Engineer M.Sc. Civil (Structures) Registered with PEC as Professional Engineer 10 years 05 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 45 of 64 Pavement Design Engineer M.Sc. Civil (Transportation) Registered with PEC as Professional Engineer 10 years 05 Mechanical / HVAC Design Engineer M.Sc. Mechanical Registered with PEC as Professional Engineer 10 years 05 Electrical Design Engineer M.Sc. Electrical Registered with PEC as Professional Engineer 10 years 05 Network Design Engineer B.Sc. Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer 05 years 05 Contract Specialist B.Sc. Engineering Registered with PEC as Professional Engineer 10 years 05 Total Points for this criterion – ‘C’ 40 Note: In the case of foreign experts, registration with the relevant authority in the country of practice shall be submitted in place of PEC registration. The number of points to be assigned to each of the above positions shall be determined considering the following two sub-criteria and relevant percentage weights: Qualifications: 30% Relevant Experience: 70% Total weight: 100% Total for the Three Criteria (A+B+C): [100 Points] 3.4. Litigation History (Form A-8) 3.4.1. The Applicant is required to provide accurate and complete information regarding any litigation and/or arbitration involving their firm or Joint Venture (JV) that has arisen from contracts either completed or currently under execution. 4. Blacklisting & Other Affidavits (Form A-9) 4.1. The Applicant shall submit an undertaking or affidavit on non-judicial stamp paper of at least PKR 100, affirming the following: 4.1.1. The Applicant has never been blacklisted/ debarred by the government /Semi government or any autonomous body. 4.1.2. All documents, particulars, and information provided in the Expression of Interest application are accurate and true to the best of their knowledge. 4.1.3. The Applicant has never indulged in corrupt, fraudulent, or collusive practices in competing contracts. 5. Joint Venture (JV) 5.1. Joint Venture (JV) must comply with the following requirements: - e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 46 of 64 5.1.1. The maximum number of members in a Joint Venture (JV) shall not exceed three firms. Any Applicant consisting of a JV with more than three members shall be disqualified. 5.1.2. They must collectively qualify the criteria given in Clause 3 heretofore, for which purpose the relevant figures for each of the partners shall be added together to arrive at their total capacity. 5.1.3. If the Applicant is an existing or intended JV, submit a copy of the JV Agreement, or a letter of intent to enter into such an agreement in case of award of contract. The respective document shall be signed by all legally authorized signatories of all the parties to the existing or intended JV, as appropriate. All firms comprising the joint venture shall be legally constituted. 5.1.4. Each individual firm in the JV must be registered with income tax and sales tax departments and must be on the active taxpayers’ list of the Federal Board of Revenue. For foreign firms participating in a JV, registration with the relevant authority in the jurisdiction of their registration is required. 5.1.5. Application submitted by an existing or intended JV shall include an undertaking signed by all parties (i) stating that all parties shall be jointly and severally liable, and (ii) nominating a Representative who shall have the authority to conduct all business for and on behalf of any and all the parties the JV during the bidding process and, in the event the JV is awarded the contract, during contract execution. 5.1.6. Each Applicant shall submit only one proposal either by himself, or as a partner in a joint venture. An Applicant who submits more than one proposal will be disqualified and proposals submitted by him shall not be considered for evaluation and award. 5.1.7. Any change in a shortlisted JV after Expression of Interest shall not be allowed by the Employer. Consequently, the Request for Proposal (RFP) documents will not be issued, and proposals will not be accepted from any JV that has undergone changes following shortlisting. 6. Conflict of Interest 6.1. The Applicant, including all members of a Joint Venture (JV), must not be associated, nor have been associated in the past, with the Contractor or any other entity engaged by the Employer for the execution of works, provision of goods, non-consulting services, or in any other capacity that may give rise to a conflict of interest. Any such association may result in the disqualification of the Applicant. 7. Updating Expression of Interest Information 7.1. Applicants shall be required to update the financial, personnel and any other pertinent information used for shortlisting at the time of submitting their proposals, to confirm their continued compliance with the qualification criteria and verification of the information provided at the time of Expression of Interest. A proposal shall be rejected if the Applicant’s qualification thresholds are no longer met at the time of bidding. 8. Other Factors e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 47 of 64 8.1. Only Consultants and JVs that have been shortlisted under this procedure shall be invited to submit proposals. A qualified Consultant or a member of a qualified Joint Venture (JV), Consortium or Association shall participate only in one proposal for the Contract. If a firm submits more than one proposal, singly or as a Joint Venture (JV), Consortium or Association, all proposals including that consultant will be rejected. 8.2. The Employer reserves the right to:- 8.2.1. Amend the scope and value of any contract(s) for which proposals are to be solicited. In such an event, only those shortlisted consultants who meet the revised requirements of the contract(s) as amended shall be eligible to submit proposals. 8.2.2. Reject or accept any or all applications in accordance with the provisions set forth herein. 8.2.3. Cancel the Expression of Interest process and reject all applications. 8.3. The Employer shall neither be liable for any such actions nor be under any obligation to inform the Applicant of the grounds for rejection. However, the grounds for rejection may be communicated upon request. 9. Notification of Shortlisting 9.1. The Employer shall notify all Applicants in writing of the names of those Applicants who have been shortlisted. In addition, those Applicants who have been disqualified will be informed separately. The Shortlisting Result shall also be uploaded to EPADS. 10. Request for Proposal 10.1. After the notification of the results of the shortlisting, the Procuring Agency will invite the proposal from all the Applicants that have been shortlisted. e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 48 of 64 ANNEXURE-A e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 49 of 64 Annexure-A Letter of Application [Letterhead paper of the Applicant, or partner responsible for a joint venture, including full postal address, telephone No. fax no., telex no., cable and e-mail address] Date:................................ To: , . Sirs, 1. Being duly authorized to represent and act on behalf of................................... (hereinafter “the Applicant”) and having reviewed and fully understood all the Shortlisting information provided, the undersigned hereby apply to be shortlisted as a Consultant for assignment for the Consulting Services for Planning, Design And Construction Supervision For The New Departure Level Bridge, Extension Of Concourses and Allied Works at Allama Iqbal International Airport (AIIAP), Lahore. 2. Attached to this letter are copies of original documents defining 1 : (a) the Applicant's legal status; (b) the principal place of business; and (c) the place of incorporation (for Applicants who are corporations); OR the place of registration and the nationality of the owners (for Applicants who are partnerships or individually-owned firms). 3. Your Organization and its authorized representatives are hereby authorized to conduct any inquiries or investigations to verify the statements, documents, and information submitted in connection with this application, and to seek clarification from our bankers and clients regarding any financial and technical aspects. This Letter of Application will also serve as authorization to any individual or authorized representative of any institution referred to in the supporting information, to provide such information deemed necessary and requested by yourselves or the authorized representative to verify statements and information provided in this application, or with regard to the resources, experience, and competence of the Applicant. 1 For applications by joint ventures/consortiums/associations, all the information requested in the Shortlisting documents is to be provided for each member/ partner separately. All members/ partners shall sign the letter e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 50 of 64 4. Your Organization and its authorized representatives may contact the following persons for further information 2 , if needed. General and Managerial Inquiries Contact 1 Telephone Cell Fax Email Contact 2 Telephone Cell Fax Email Personnel Inquiries Contact 1 Telephone Cell Fax Email Contact 2 Telephone Cell Fax Email Technical Inquiries Contact 1 Telephone Cell Fax Email Contact 2 Telephone Cell Fax Email Financial Inquiries Contact 1 Telephone Cell Fax Email Contact 2 Telephone Cell Fax Email 2 Application by joint ventures/ consortium/ association should provide information on a separate sheet about each party to the application e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 51 of 64 5. This application is made with the full understanding that: (a) Proposals by shortlisted Applicants will be subjected to verification of all information submitted for Shortlisting at the time of bidding; (b) Your Organization reserves the right to: (i) amend the scope and value of any contract under this project; in such event proposal will only be called from shortlisted consultants who meet the revised requirements; and (ii) reject or accept any application, cancel the Shortlisting process, and reject applications; and (c) Your Organization shall not be liable for any such actions and its consequences and under no obligation to inform the Applicant of the grounds for actions at 5 (b) here above. 6. Appended to this application, we give details of the participation of each party, including capital contribution and profit/loss agreements, to the joint venture/consortium/ association. We also specify the financial commitment in terms of the percentage of the value of the (each) Contract and the responsibilities for execution of the (each) Contract. 7. We confirm that in the event that we submit a proposal, that proposal as well as any resulting Contract will be. (a) signed so as to legally bind all partners, jointly and severally; and (b) submitted with a Joint Venture/ consortium/ association agreement providing the joint and several liability of all partners in the event the contract is awarded to us. 8. We certify that the information provided in the Shortlisting document is correct and final to the best of our knowledge and nothing contained herein, is contrary to the facts as available with the firm’s official record and that Pakistan Airports Authority (PAA) (the Employer) has complete right to disregard our application should it fail to meet any of their Shortlisting criteria. 9. The undersigned declare that the statements made and the information provided in the duly completed application are complete, true, and correct in every detail. Signed Signed Name Name For and on behalf of (name of Applicant or lead/ authorized partner/ member of a joint venture, consortium or association) For and on behalf of (name(s) of other authorized partner(s)/ member(s) of a joint venture, consortium or association) Applicants who are not joint ventures/ consortium/ association should delete para 6 & 7 and initial the deletions. e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 52 of 64 APPLICATION FORMS e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 53 of 64 Application Form A-1 General Information All individual firms and each partner of a Joint Venture applying for Expression of Interest are requested to complete the information in this form. Nationality information is also to be provided for foreign owners or Applicants who are forming part of the Joint Venture, as required under the PEC Bye-Laws as a Joint Venture/ Consortium/ Association. The use of subconsultant is not allowed for this particular assignment. 1. Name of Firm 2. Head Office Address 3. Telephone Contact Person: Name: Title: 4. Fax 5. Email Cell 6. Place of Incorporation/Registration Year of incorporation/registration NAME AND NATIONALITY OF OWNERS NAME NATIONALITY 1. 2. 3. 4. 5. e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 54 of 64 Application Form A-2 List of General/Specific Experience for Completed Projects Complete the form below, listing each project under its respective category. Each project will be evaluated against only one sub-criterion. For each project listed, a separate Form A-3 must be submitted, accompanied by supporting documentation that is properly cross-referenced. Projects listed in Form A-2 shall be used for evaluation and any other information provided shall not be considered for evaluation. The State Bank’s “Exchange Rates for Market-to-Market Revaluation by Authorized Dealers in Foreign Exchange - Ready” 14 days prior to the submission deadline shall be used for conversion of other currencies to PKR. [1] EXPERIENCE IN GENERAL ENGINEERING CONSULTANCY SERVICES Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1. 2. [2] EXPERIENCE IN ROADS & HIGHWAYS PROJECTS Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1. 2. [3] SPECIFIC EXPERIENCE OF BRIDGE/FLYOVER Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1. 2. Name of Applicant or partner of a joint venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 55 of 64 Application Form A-3 Detail of General/Specific Experience for Completed Projects Use a separate sheet for each contract and attach a substantiating document with each sheet to facilitate in evaluation process The State Bank’s “Exchange Rates for Market-to-Market Revaluation by Authorized Dealers in Foreign Exchange - Ready” 14 days prior to the submission deadline shall be used for conversion of other currencies to PKR. Assignment name: Approx. value of the contract (in current PKR): Country: Location within country: Duration of assignment (months): Name of Client Name of Contractor Total No. of staff-months of the assignment: Address: Approx. value of the services provided by your firm under the contract (in current PKR): Start date (month/year): Completion date (month/year): No. of professional staff-months provided by associated consultants: Name of associated consultants, if any: Name of proposed senior professional staff of your firm involved and functions performed (indicate most significant profiles such as project director/coordinator, team leader): Sub-Criteria for Assessment of Experience as per table in Clause 3.1.1.2 [A particular project will be considered against only one sub-criteria] Please tick the relevant sub-criteria: [1] Experience in General Engineering. Consultancy Services [2] Experience in Roads & Highways [3] Specific experience of Bridge/Flyover Narrative description of project: Description of actual services provided by your staff within the assignment: Name of Applicant or partner of a joint venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 56 of 64 Application Form A-4 Financial Capability Applicants, including each partner of a joint venture, should provide financial information to demonstrate that they meet the requirements stated in the Instructions to Applicants. Each Applicant or partner of a joint venture must fill in this form. If necessary, use separate sheets to provide complete banker information. A copy of the audited balance sheets from the Chartered Accountant firm for any three of last five years i.e. 2020-21, 2021-22, 2022-23, 2023-24, and 2024-25 shall be attached to this Form. The State Bank’s “Exchange Rates for Market-to-Market Revaluation by Authorized Dealers in Foreign Exchange - Ready” 14 days prior to the submission deadline shall be used for conversion of other currencies to PKR. Financial Information (PKR) Historical information for any three of last five years (PKR, in millions) ---- ---- ---- Information from Balance Sheet (1) Total Assets (TA) (2) Current Assets (CA) (3) Total Liabilities (TL) (4) Current Liabilities (CL) Information from Income Statement (5) Total Revenue (TR) (6) Profits before Taxes (PBT) Net Worth (1) – (3) Current Ratio (2) / (4) Working Capital (2) – (4) Name of Applicant or Partner of a Joint Venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 57 of 64 Application Form A-5 Joint Venture Summary (if applicable) NAME OF ALL PARTNERS OF A JOINT VENTURE 1. Lead Partner 2. Partner 3. Partner ANNUAL TURNOVER DATA (Equivalent in PKR, millions) Partner Form A-4 Page No. Year…. Year ------- Year ------ 1. Lead Partner 2. Partner 3. Partner Total: ANNUAL WORKING CAPITAL (Equivalent in PKR, millions) Partner Form A-4 Page No. Year…. Year…. Year….. 1. Lead Partner 2. Partner 3. Partner Total: e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 58 of 64 Application Form A-6 Personnel Capabilities For specific positions essential to assignment, Applicants should provide the names of Key Experts qualified to meet the specified requirements stated for each position in Clause 3.3.1.3. The data on their experience should be supplied on separate sheets using one Form for each candidate (Application Form A-7 ) along with CVs of candidates duly signed by the Key Expert . The CVs of other Experts which are not specified in this FORM shall not be considered for evaluation 1. Title of Position Name of Prime Candidate 2. Title of Position Name of Prime Candidate 3. Title of Position Name of Prime Candidate 4. Title of Position Name of Prime Candidate 5. Title of Position Name of Prime Candidate 6. Title of Position Name of Prime Candidate Name of Applicant or partner of a Joint Venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 59 of 64 Application Form A-7 Candidate Summary Position Candidate information Name of Candidate Date of Birth Professional Qualification PEC / PCATP Number: Present employment Name of Employer: Address of Employer: Telephone Contact (manager/personnel officer) Fax Email Job title of candidate Years with present employer Summarize professional experience in reverse chronological order. Indicate particular technical and managerial experience relevant to the Project. Month/Dates/Years Company / Project / Position / Relevant technical and management experience From To Name of Applicant or partner of a Joint Venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 60 of 64 Application Form A-8 Litigation History Applicants, including each of the partners of a joint venture, should provide information on any history of litigation or arbitration resulting from contracts executed or currently under execution (Instructions to Applicants, Clause 3.4.1). A separate sheet should be used for each partner of the joint venture. Year Award FOR or AGAINST Applicant Name of Client, cause of litigation, and matter in dispute Disputed amount (current value PKR or equivalent) Name of Applicant or Partner of a Joint Venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 61 of 64 Application Form A-9 Additional Information Sr. Description Attached Not Attached Tick only one 1. Valid registration with the Pakistan Engineering Council (PEC) as a consultant including Profile Codes 1215, and 1216 and Service Codes of 0532, 0537 and 0546. In the case of a Joint Venture (JV), at least one member of the JV must meet this requirement 2. Valid PEC registration as a Consulting Engineer/Consulting Firm under the Consulting Engineers/Consulting Firms Registration Regulations, permitting it to provide consultancy services in Pakistan permitting the foreign firm to provide consultancy services in Pakistan. 3. JV Agreement or Letter of Intent (LOI) to form a JV, executed on the letterhead of each JV partner, confirming their mutual commitment to jointly pursue this assignment. (In case of JV) 4. Certificate of registration (NTN) with FBR along with proof of Active Tax Payer in Pakistan or relevant authority in case of foreign firm in JV 5. Valid Registration with Securities & Exchange Commission of Pakistan (SECP). In case of Foreign Consultants participating in JV, Certificate of Incorporation in the firm’s Country of Origin 6. Power of Attorney (on non-judicial Stamp Paper valuing PKR 500) specifically authorizing the authorized representative to sign and submit the application for Expression of Interest on behalf of the Applicant. 7. Letter of Application ( Annexure A ), duly signed by an authorized representative of the Applicant. 8. Affidavit of non-Blacklisting on judicial stamp paper to the effect that the firm/ JV/ Consortium partner(s) has never been blacklisted with any Government Department/ Agency/ Authority. 9. An affidavit to the effect that all documents / particulars / information given with this Expression of Interest document are true. 10. An affidavit to the effect that the Applicant has never indulged in corrupt, fraudulent or collusive practice in competing for contracts. 11. An affidavit to the effect that the firm is not presently involved nor has been in the past in litigation with the Employer. Should this be otherwise the Applicant must provide such details in Form A-8 “Litigation History”. Name of Applicant or partner of a joint venture: e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 62 of 64 Note: Any other pertinent information in support of this Expression of Interest should also be furnished and details mentioned below. Sr. Description Remarks e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 63 of 64 ASF WT 09 VORANT • , CANT PLOT MATCH UNE RAMP AREA RAMP P LA CH. FUEL AREA WATER )?ate| O OFFICES SUB STATION C A A LAND PH feH LEGEND - 500' / EXISTING TERMINAL BUILDING TERMINAL BUILDING EXPANSION EXISTING DEPARTURE LEVEL BRIDGE PROPOSED DEPARTURE BRIDGE AS PER ORIGINAL EXPANSION PLAN BY M/S TYPSA-ASIAN JV I 'V e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 64 of 64
Source / meaning
Directorate) has reserved Funds for the procurement planned for FY 2026-سامانه ملی تدارکات پاکستان (EPADS) — official notice / tender document
Source / meaning
(LOD 400/500) covering architectural, structural, MEP,سامانه ملی تدارکات پاکستان (EPADS) — official notice / tender document
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.سامانه ملی تدارکات پاکستان (EPADS) — official notice / tender document
Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.
Shortlisting / qualification criteria
Organisation history and structure
9 explicit requirement(s)24. Procuring Agency’s Right to Accept or Reject Applications 24.1. The Procuring Agency reserves the right to accept or reject all the Applications, and to annul the Prequalification process at any time, without thereby incurring any liability to the Applicants. However, the procuring agency shall record its reasons and justifications on EPADS v2.0 , duly approved by the Principal Accounting Officer or Head of Organization.
Source excerpt for this employer criterion
24. Procuring Agency’s Right to Accept or Reject Applications 24.1. The Procuring Agency reserves the right to accept or reject all the Applications, and to annul the Prequalification process at any time, without thereby incurring any liability to the Applicants. However, the procuring agency shall record its reasons and justifications on EPADS v2.0 , duly approved by the Principal Accounting Officer or Head of Organization.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
The firm must be registered with PEC in accordance with the Consulting Engineers/Consulting Firms Registration Regulations and possess a valid license for providing consultancy services in Pakistan. [If this requirement does not pertain to you, attach a single pager stating this requirement as not applicable] Yes Foreign Firms must form a joint venture (JV) with a Pakistani consulting firm duly registered with PEC, as per the PEC regulations.
Source excerpt for this employer criterion
The firm must be registered with PEC in accordance with the Consulting Engineers/Consulting Firms Registration Regulations and possess a valid license for providing consultancy services in Pakistan. [If this requirement does not pertain to you, attach a single pager stating this requirement as not applicable] Yes Foreign Firms must form a joint venture (JV) with a Pakistani consulting firm duly registered with PEC, as per the PEC regulations.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
In case of Foreign Firm participating in JV, Certificate of Incorporation of the firm in the Country of Origin is required.
Source excerpt for this employer criterion
In case of Foreign Firm participating in JV, Certificate of Incorporation of the firm in the Country of Origin is required.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
A particular project for an engineering design service can only be claimed against one of the sub-criteria General Experience of all types of engineering design consultancy services in the last ten (10) years for projects having a minimum overall Estimated/Completion Cost of PKR 1,000 million for local/ US $ 3.5 Million for foreign JV partner. Three (03) marks shall be awarded for each successfully completed project.
- PKR 1,000 million
- $ 3.5
Source excerpt for this employer criterion
A particular project for an engineering design service can only be claimed against one of the sub-criteria General Experience of all types of engineering design consultancy services in the last ten (10) years for projects having a minimum overall Estimated/Completion Cost of PKR 1,000 million for local/ US $ 3.5 Million for foreign JV partner. Three (03) marks shall be awarded for each successfully completed project.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
2. Head Office Address
Source excerpt for this employer criterion
2. Head Office AddressSource location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
6. Place of Incorporation/Registration Year of incorporation/registration NAME AND NATIONALITY OF OWNERS NAME NATIONALITY 1.
Source excerpt for this employer criterion
6. Place of Incorporation/Registration Year of incorporation/registration NAME AND NATIONALITY OF OWNERS NAME NATIONALITY 1.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Telephone Contact (manager/personnel officer) Fax Email Job title of candidate Years with present employer Summarize professional experience in reverse chronological order. Indicate particular technical and managerial experience relevant to the Project.
Source excerpt for this employer criterion
Telephone Contact (manager/personnel officer) Fax Email Job title of candidate Years with present employer Summarize professional experience in reverse chronological order. Indicate particular technical and managerial experience relevant to the Project.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Certificate of registration (NTN) with FBR along with proof of Active Tax Payer in Pakistan or relevant authority in case of foreign firm in JV 5.
- JV 5
Source excerpt for this employer criterion
Certificate of registration (NTN) with FBR along with proof of Active Tax Payer in Pakistan or relevant authority in case of foreign firm in JV 5.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
In case of Foreign Consultants participating in JV, Certificate of Incorporation in the firm’s Country of Origin 6.
Source excerpt for this employer criterion
In case of Foreign Consultants participating in JV, Certificate of Incorporation in the firm’s Country of Origin 6.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Technical and managerial capability
44 explicit requirement(s)1. The Pakistan Airports Authority (Planning & Development Directorate) has reserved Funds for the procurement planned for FY 2026- 27 .
- FY 2026
Source excerpt for this employer criterion
1. The Pakistan Airports Authority (Planning & Development Directorate) has reserved Funds for the procurement planned for FY 2026- 27 .Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
3. The objective of the intended pre-qualification is the provision of " PLANNING, DESIGN AND CONSTRUCTION SUPERVISION FOR THE NEW DEPARTURE LEVEL BRIDGE, EXTENSION OF CONCOURSES AND ALLIED WORKS AT ALLAMA IQBAL INTERNATIONAL AIRPORT (AIIAP), LAHORE " through engagement of qualified consultants, and the purpose of this Prequalification Notice is to provide basic information to enable potential applicants to decide whether or not to respond to this Pre-qualification Notice.
Source excerpt for this employer criterion
3. The objective of the intended pre-qualification is the provision of " PLANNING, DESIGN AND CONSTRUCTION SUPERVISION FOR THE NEW DEPARTURE LEVEL BRIDGE, EXTENSION OF CONCOURSES AND ALLIED WORKS AT ALLAMA IQBAL INTERNATIONAL AIRPORT (AIIAP), LAHORE " through engagement of qualified consultants, and the purpose of this Prequalification Notice is to provide basic information to enable potential applicants to decide whether or not to respond to this Pre-qualification Notice.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
4. Only the pre-qualified applicants shall be invited to participate in the
Source excerpt for this employer criterion
4. Only the pre-qualified applicants shall be invited to participate in theSource location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
7. Clarification of Pre-qualification Documents and Pre-Application Meeting 7.1. An Applicant requiring any clarification of the Pre-qualification Documents shall contact the Procuring Agency in writing through ePADS as. The Procuring Agency will respond in writing through ePADS to any request for clarification provided that such request is received no later than three
Source excerpt for this employer criterion
7. Clarification of Pre-qualification Documents and Pre-Application Meeting 7.1. An Applicant requiring any clarification of the Pre-qualification Documents shall contact the Procuring Agency in writing through ePADS as. The Procuring Agency will respond in writing through ePADS to any request for clarification provided that such request is received no later than threeSource location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
(03) days prior to the deadline for submission of the Applications. The Procuring Agency shall forward a copy of its response to all prospective e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 7 of 64 Applicants through ePADS who have obtained the Prequalification Documents from ePADS , including a description of the inquiry but without identifying its source. If so indicated in the PDS, the Procuring Agency shall also promptly publish its response through ePADS . Should the Procuring Agency deem it necessary to amend the Prequalification Documents as a result of a clarification, it shall do so in accordance with the provisions of ITA 16.2. If indicated in the PDS, the Applicant’s designated representative is invited at the Applicant’s cost to attend a pre-Application meeting through online platform / EPADS v2.0 as per date and time mentioned in the PDS.
- ITA 16.2
Source excerpt for this employer criterion
(03) days prior to the deadline for submission of the Applications. The Procuring Agency shall forward a copy of its response to all prospective e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 7 of 64 Applicants through ePADS who have obtained the Prequalification Documents from ePADS , including a description of the inquiry but without identifying its source. If so indicated in the PDS, the Procuring Agency shall also promptly publish its response through ePADS . Should the Procuring Agency deem it necessary to amend the Prequalification Documents as a result of a clarification, it shall do so in accordance with the provisions of ITA 16.2. If indicated in the PDS, the Applicant’s designated representative is invited at the Applicant’s cost to attend a pre-Application meeting through online platform / EPADS v2.0 as per date and time mentioned in the PDS.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
8. Amendment of Prequalifica¬tion Documents 8.1. At any time prior to the deadline for submission of Applications, the Procuring Agency may amend the Prequalification Documents by issuing an Addendum through EPADS v2.0 8.2. Any Addendum issued shall be part of the Prequalification Document and shall be communicated in writing through ePADS to all Applicants who have obtained the Prequalification Documents from the Procuring Agency. The Procuring Agency shall promptly publish the Addendum at the Procuring Agency’s web page and EPADS v2.0 . Provided that an Applicant who had already submitted their Applications e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 8 of 64 prior to the issuance of any such addendum shall have the right to withdraw his already submitted Application and submit the revised Application prior to the original or extended Application submission deadline through EPADS v2.0 .
Source excerpt for this employer criterion
8. Amendment of Prequalifica¬tion Documents 8.1. At any time prior to the deadline for submission of Applications, the Procuring Agency may amend the Prequalification Documents by issuing an Addendum through EPADS v2.0 8.2. Any Addendum issued shall be part of the Prequalification Document and shall be communicated in writing through ePADS to all Applicants who have obtained the Prequalification Documents from the Procuring Agency. The Procuring Agency shall promptly publish the Addendum at the Procuring Agency’s web page and EPADS v2.0 . Provided that an Applicant who had already submitted their Applications e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 8 of 64 prior to the issuance of any such addendum shall have the right to withdraw his already submitted Application and submit the revised Application prior to the original or extended Application submission deadline through EPADS v2.0 .Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
C. Preparation of Applications
Source excerpt for this employer criterion
C. Preparation of ApplicationsSource location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
9. Cost of Applications 9.1. The Applicant shall bear all costs associated with the preparation and submission of its Application. The Procuring Agency will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the Pre-qualification process.
Source excerpt for this employer criterion
9. Cost of Applications 9.1. The Applicant shall bear all costs associated with the preparation and submission of its Application. The Procuring Agency will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the Pre-qualification process.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
10. Language of Application 10.1. The Application as well as all correspondence and documents relating to the Pre-qualification exchanged by the Applicant and the Procuring Agency, shall be written in the language specified in the PDS. Supporting documents and printed literature that are part of the Application may be in another language, provided they are accompanied by an accurate translation of the relevant passages in the language specified in the PDS, in which case, for purposes of interpretation of the Application, the translation shall govern.
Source excerpt for this employer criterion
10. Language of Application 10.1. The Application as well as all correspondence and documents relating to the Pre-qualification exchanged by the Applicant and the Procuring Agency, shall be written in the language specified in the PDS. Supporting documents and printed literature that are part of the Application may be in another language, provided they are accompanied by an accurate translation of the relevant passages in the language specified in the PDS, in which case, for purposes of interpretation of the Application, the translation shall govern.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
11. Documents Comprising the Application 11.1. The Application shall comprise the following: e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 9 of 64 11.1.1. Application Submission Letter , in accordance with ITA 12.1;
- ITA 12.1
Source excerpt for this employer criterion
11. Documents Comprising the Application 11.1. The Application shall comprise the following: e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 9 of 64 11.1.1. Application Submission Letter , in accordance with ITA 12.1;Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
F. Evaluation of Applications and Prequalification of Applicants
Source excerpt for this employer criterion
F. Evaluation of Applications and Prequalification of ApplicantsSource location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
23. Evaluation of Applications e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 13 of 64 23.1. The Procuring Agency shall use the factors, methods, criteria, and requirements defined in Section III,
Source excerpt for this employer criterion
23. Evaluation of Applications e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 13 of 64 23.1. The Procuring Agency shall use the factors, methods, criteria, and requirements defined in Section III,Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
materially affect the technical capability and financial resources of an Applicant to perform the contract, however subject to the provisions of ITA 25. Subcontractors proposed by the Applicant shall be fully qualified for their parts of the Scope of Supply of the Goods and Allied Services. In case of multiple contracts, Applicants should indicate in their Applications the individual contract or combination of contracts in which they are interested. The Procuring Agency shall prequalify each Applicant for the maximum combination of contracts for which the Applicant has thereby indicated its interest and for which the Applicant meets the appropriate aggregate requirements.
- ITA 25
Source excerpt for this employer criterion
materially affect the technical capability and financial resources of an Applicant to perform the contract, however subject to the provisions of ITA 25. Subcontractors proposed by the Applicant shall be fully qualified for their parts of the Scope of Supply of the Goods and Allied Services. In case of multiple contracts, Applicants should indicate in their Applications the individual contract or combination of contracts in which they are interested. The Procuring Agency shall prequalify each Applicant for the maximum combination of contracts for which the Applicant has thereby indicated its interest and for which the Applicant meets the appropriate aggregate requirements.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
25. Pre-qualification of Applicants 25.1. All Applicants whose Applications substantially meet or exceed the specified qualification requirements will be prequalified by the Procuring e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 14 of 64 Agency. An Applicant may be “conditionally prequalified,” that is, qualified subject to the Applicant submitting or correcting certain specified nonmaterial documents or deficiencies to the satisfaction of the Procuring Agency. Applicants that are conditionally prequalified will be so informed along with the statement of the condition(s) which must be met to the satisfaction of the Procuring Agency before or at the time of submitting their Bids.
Source excerpt for this employer criterion
25. Pre-qualification of Applicants 25.1. All Applicants whose Applications substantially meet or exceed the specified qualification requirements will be prequalified by the Procuring e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 14 of 64 Agency. An Applicant may be “conditionally prequalified,” that is, qualified subject to the Applicant submitting or correcting certain specified nonmaterial documents or deficiencies to the satisfaction of the Procuring Agency. Applicants that are conditionally prequalified will be so informed along with the statement of the condition(s) which must be met to the satisfaction of the Procuring Agency before or at the time of submitting their Bids.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
27. Request for Bids 27.1. Promptly after the notification of the results of the Prequalification, the Procuring Agency will invite the Bids from all the Applicants that have been prequalified through EPADS v2.0 .
Source excerpt for this employer criterion
27. Request for Bids 27.1. Promptly after the notification of the results of the Prequalification, the Procuring Agency will invite the Bids from all the Applicants that have been prequalified through EPADS v2.0 .Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
28. Changes in Qualifications of Applicants 28.1.
Source excerpt for this employer criterion
28. Changes in Qualifications of Applicants 28.1.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
30. Mechanism of Blacklisting 30.1.
Source excerpt for this employer criterion
30. Mechanism of Blacklisting 30.1.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
B. Contents of the Prequalification Document PDS Clause Number 5 ITA Number 7.1 For clarification, the Applicant shall seek clarifications through: EPADS v2.0 PDS Clause Number 6 ITA Number 7.1 & 8.2 Information related to Prequalification shall be published on: EPADS v2.0 PDS Clause Number 7 ITA Number 7.2 Pre-Application Meeting: Clarification Date: Friday, September 18, 2026
- 5 ITA
- 2.0 PDS
- 6 ITA
- 7 ITA
Source excerpt for this employer criterion
B. Contents of the Prequalification Document PDS Clause Number 5 ITA Number 7.1 For clarification, the Applicant shall seek clarifications through: EPADS v2.0 PDS Clause Number 6 ITA Number 7.1 & 8.2 Information related to Prequalification shall be published on: EPADS v2.0 PDS Clause Number 7 ITA Number 7.2 Pre-Application Meeting: Clarification Date: Friday, September 18, 2026Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
C. Preparation of Applications PDS Clause Number 8 ITA Number 10.1 This Prequalification Document has been issued in the language: English PDS Clause Number 9 ITA Number 11.1(d) Additional documents to be submitted through EPADS v2.0: No PDS Clause Number 10 ITA Number 14.2 Source for determining exchange rates: Not Applicable
- 8 ITA
- 9 ITA
- 10 ITA
Source excerpt for this employer criterion
C. Preparation of Applications PDS Clause Number 8 ITA Number 10.1 This Prequalification Document has been issued in the language: English PDS Clause Number 9 ITA Number 11.1(d) Additional documents to be submitted through EPADS v2.0: No PDS Clause Number 10 ITA Number 14.2 Source for determining exchange rates: Not ApplicableSource location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
36) Evaluation Criteria The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Evaluation Criteria (page number:
Source excerpt for this employer criterion
36) Evaluation Criteria The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Evaluation Criteria (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
41) Letter of Application The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Letter of Application (page number:
Source excerpt for this employer criterion
41) Letter of Application The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Letter of Application (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
49) Form A1 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 28 of 64 integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A1 (page number:
Source excerpt for this employer criterion
49) Form A1 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 28 of 64 integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A1 (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
53) Form A2 & A3 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A2 & A3 (page number:
Source excerpt for this employer criterion
53) Form A2 & A3 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A2 & A3 (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
55) Form A4 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A4 (page number:
Source excerpt for this employer criterion
55) Form A4 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A4 (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
57) Form A5 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 29 of 64 See Form Under Additional Forms and Documents: Form A5 (page number:
Source excerpt for this employer criterion
57) Form A5 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 29 of 64 See Form Under Additional Forms and Documents: Form A5 (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
58) Form A6 & A7 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A6 & A7 (page number:
Source excerpt for this employer criterion
58) Form A6 & A7 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A6 & A7 (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
59) Form A8 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A8 (page number:
Source excerpt for this employer criterion
59) Form A8 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A8 (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
61) Form A9 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A9 (page number:
Source excerpt for this employer criterion
61) Form A9 The application forms attached as annexure shall be duly completed/filled, signed and stamped, together with all supporting documents required therein and the applicant shall upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application nonresponsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Form A9 (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
62) Layout Plan e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 30 of 64 The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Layout Plan (page number:
Source excerpt for this employer criterion
62) Layout Plan e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 30 of 64 The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Layout Plan (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
64) e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 31 of 64 Procurement Forms e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 32 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 33 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 34 of 64 Additional Forms and Documents e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 35 of 64 P AKISTAN AIRPORTS AUTHORITY CONSULTANCY SERVICES FOR PLANNING, DESIGN AND CONSTRUCTION SUPERVISION FOR THE NEW DEPARTURE LEVEL BRIDGE, EXTENSION OF CONCOURSES AND ALLIED WORKS AT ALLAMA IQBAL INTERNATIONAL AIRPORT (AIIAP), LAHORE Expression of Interest Document SEPTEMBER e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 36 of 64
Source excerpt for this employer criterion
64) e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 31 of 64 Procurement Forms e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 32 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 33 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 34 of 64 Additional Forms and Documents e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 35 of 64 P AKISTAN AIRPORTS AUTHORITY CONSULTANCY SERVICES FOR PLANNING, DESIGN AND CONSTRUCTION SUPERVISION FOR THE NEW DEPARTURE LEVEL BRIDGE, EXTENSION OF CONCOURSES AND ALLIED WORKS AT ALLAMA IQBAL INTERNATIONAL AIRPORT (AIIAP), LAHORE Expression of Interest Document SEPTEMBER e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 36 of 64Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
8. Other Factors e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 47 of 64 8.1. Only Consultants and JVs that have been shortlisted under this procedure shall be invited to submit proposals.
Source excerpt for this employer criterion
8. Other Factors e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 47 of 64 8.1. Only Consultants and JVs that have been shortlisted under this procedure shall be invited to submit proposals.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
9. Notification of Shortlisting 9.1. The Employer shall notify all Applicants in writing of the names of those Applicants who have been shortlisted. In addition, those Applicants who have been disqualified will be informed separately. The Shortlisting Result shall also be uploaded to EPADS
Source excerpt for this employer criterion
9. Notification of Shortlisting 9.1. The Employer shall notify all Applicants in writing of the names of those Applicants who have been shortlisted. In addition, those Applicants who have been disqualified will be informed separately. The Shortlisting Result shall also be uploaded to EPADSSource location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
9. The undersigned declare that the statements made and the information provided in the duly completed application are complete, true, and correct in every detail.
Source excerpt for this employer criterion
9. The undersigned declare that the statements made and the information provided in the duly completed application are complete, true, and correct in every detail.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
1. Name of Firm
Source excerpt for this employer criterion
1. Name of FirmSource location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
3. Telephone Contact Person:
Source excerpt for this employer criterion
3. Telephone Contact Person:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
(1) Total Assets (TA)
Source excerpt for this employer criterion
(1) Total Assets (TA)Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
(2) Current Assets (CA)
Source excerpt for this employer criterion
(2) Current Assets (CA)Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
(3) Total Liabilities (TL)
Source excerpt for this employer criterion
(3) Total Liabilities (TL)Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
(4) Current Liabilities (CL) Information from Income Statement
Source excerpt for this employer criterion
(4) Current Liabilities (CL) Information from Income StatementSource location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
(5) Total Revenue (TR)
Source excerpt for this employer criterion
(5) Total Revenue (TR)Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
1. Lead Partner
Source excerpt for this employer criterion
1. Lead PartnerSource location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
3. Partner Total: ANNUAL WORKING CAPITAL (Equivalent in PKR, millions) Partner Form A-4 Page No.
Source excerpt for this employer criterion
3. Partner Total: ANNUAL WORKING CAPITAL (Equivalent in PKR, millions) Partner Form A-4 Page No.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
500) specifically authorizing the authorized representative to sign and submit the application for Expression of Interest on behalf of the Applicant.
Source excerpt for this employer criterion
500) specifically authorizing the authorized representative to sign and submit the application for Expression of Interest on behalf of the Applicant.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
7. Letter of Application ( Annexure A ), duly signed by an authorized representative of the Applicant.
Source excerpt for this employer criterion
7. Letter of Application ( Annexure A ), duly signed by an authorized representative of the Applicant.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Similar experience
13 explicit requirement(s)2. The Pakistan Airports Authority (Planning & Development Directorate) intends to pre-qualify consulting firms / consultants for subsequent issuance of Request for Proposals (RFP), and sign the contract agreement(s) with the selected consultant(s) following the selection process.
Source excerpt for this employer criterion
2. The Pakistan Airports Authority (Planning & Development Directorate) intends to pre-qualify consulting firms / consultants for subsequent issuance of Request for Proposals (RFP), and sign the contract agreement(s) with the selected consultant(s) following the selection process.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
26. Notification of Prequalification 26.1. The Procuring Agency shall notify all Applicants in writing through EPADS v2.0 indicating the names of those Applicants who have been prequalified or conditionally prequalified. In addition, those Applicants who have been disqualified will be informed separately through EPADS v2.0 . The procuring agency shall communicate to those suppliers or contractors who have not been pre-qualified the reasons for not prequalifying them through EPADS v2.0
Source excerpt for this employer criterion
26. Notification of Prequalification 26.1. The Procuring Agency shall notify all Applicants in writing through EPADS v2.0 indicating the names of those Applicants who have been prequalified or conditionally prequalified. In addition, those Applicants who have been disqualified will be informed separately through EPADS v2.0 . The procuring agency shall communicate to those suppliers or contractors who have not been pre-qualified the reasons for not prequalifying them through EPADS v2.0Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
A. General PDS Clause Number 1 ITA Number 1.1 Identification Number of the Invitation for Prequalification: P108382 The Procuring Agency is: Pakistan Airports Authority (Planning & Development Directorate) List of Service Contracts:
- 1 ITA
Source excerpt for this employer criterion
A. General PDS Clause Number 1 ITA Number 1.1 Identification Number of the Invitation for Prequalification: P108382 The Procuring Agency is: Pakistan Airports Authority (Planning & Development Directorate) List of Service Contracts:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Average Working Capital = (Year 1 + Year 2 + Year 3) ÷ 3 [05 marks if average working capital any three of last five financial years is PKR 300 million or above] [For average working capital of less than PKR 300 million, marks shall be awarded as per following formula: (A × 5 / 300), where ‘A’ is average annual working capital in Million] (Qualitative)(Doc Required) 5 General/Specific Experience - Refer to Section 3.3.1.2 of Evaluation Criteria Annexure Experience in General Engineering Consultancy Services – Attach “Completion of Services (Design and/or Supervision)” and any other supporting document (clearly stating the date of completion of either Services and project cost) of the respective project with Form A-2 and A-3.
- Design and engineering
- Supervision and contract administration
- Average Working Capital = (Year 1 + Year 2 + Year 3) ÷ 3 [05 marks if average working capital any three of last five financial years is PKR 300 million or above] [For average working capital of less than PKR 300 million, marks shall be awarded as…
- PKR 300 million
Source excerpt for this employer criterion
Average Working Capital = (Year 1 + Year 2 + Year 3) ÷ 3 [05 marks if average working capital any three of last five financial years is PKR 300 million or above] [For average working capital of less than PKR 300 million, marks shall be awarded as per following formula: (A × 5 / 300), where ‘A’ is average annual working capital in Million] (Qualitative)(Doc Required) 5 General/Specific Experience - Refer to Section 3.3.1.2 of Evaluation Criteria Annexure Experience in General Engineering Consultancy Services – Attach “Completion of Services (Design and/or Supervision)” and any other supporting document (clearly stating the date of completion of either Services and project cost) of the respective project with Form A-2 and A-3.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Maximum 10 Marks shall be awarded if ≥ 4 successfully completed project. (Qualitative)(Doc Required) 10 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 23 of 64 Experience in Roads & Highways Projects - Attach “Completion of Services (Design)” and any other supporting document (clearly stating the date of completion of Services and project cost) of the respective project with Form A-2 and A-3.
- Design and engineering
- (Qualitative)(Doc Required) 10 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 23 of 64 Experience in Roads & Highways Projects - Attach “Completion of Services (Design)” and any other supporting document (clearly stating the date of completion of Services and project cost) of the…
Source excerpt for this employer criterion
Maximum 10 Marks shall be awarded if ≥ 4 successfully completed project. (Qualitative)(Doc Required) 10 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 23 of 64 Experience in Roads & Highways Projects - Attach “Completion of Services (Design)” and any other supporting document (clearly stating the date of completion of Services and project cost) of the respective project with Form A-2 and A-3.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Electrical Registered with PEC as Professional Engineer Minimum Relevant Experience:
Source excerpt for this employer criterion
Electrical Registered with PEC as Professional Engineer Minimum Relevant Experience:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 27 of 64 Scope of Services The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Scope of Services (page number:
- Design and engineering
- Procurement and bidding documents
- Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition…
Source excerpt for this employer criterion
Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 27 of 64 Scope of Services The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Scope of Services (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
5. e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 54 of 64 Application Form A-2 List of General/Specific Experience for Completed Projects Complete the form below, listing each project under its respective category. Each project will be evaluated against only one sub-criterion. For each project listed, a separate Form A-3 must be submitted, accompanied by supporting documentation that is properly cross-referenced. Projects listed in Form A-2 shall be used for evaluation and any other information provided shall not be considered for evaluation. The State Bank’s “Exchange Rates for Market-to-Market Revaluation by Authorized Dealers in Foreign Exchange - Ready” 14 days prior to the submission deadline shall be used for conversion of other currencies to PKR.
Source excerpt for this employer criterion
5. e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 54 of 64 Application Form A-2 List of General/Specific Experience for Completed Projects Complete the form below, listing each project under its respective category. Each project will be evaluated against only one sub-criterion. For each project listed, a separate Form A-3 must be submitted, accompanied by supporting documentation that is properly cross-referenced. Projects listed in Form A-2 shall be used for evaluation and any other information provided shall not be considered for evaluation. The State Bank’s “Exchange Rates for Market-to-Market Revaluation by Authorized Dealers in Foreign Exchange - Ready” 14 days prior to the submission deadline shall be used for conversion of other currencies to PKR.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
[1] EXPERIENCE IN GENERAL ENGINEERING CONSULTANCY SERVICES Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1.
- Design and engineering
Source excerpt for this employer criterion
[1] EXPERIENCE IN GENERAL ENGINEERING CONSULTANCY SERVICES Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
[2] EXPERIENCE IN ROADS & HIGHWAYS PROJECTS Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1.
Source excerpt for this employer criterion
[2] EXPERIENCE IN ROADS & HIGHWAYS PROJECTS Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
[3] SPECIFIC EXPERIENCE OF BRIDGE/FLYOVER Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1.
- [3] SPECIFIC EXPERIENCE OF BRIDGE/FLYOVER Sr.
Source excerpt for this employer criterion
[3] SPECIFIC EXPERIENCE OF BRIDGE/FLYOVER Sr. Name of the Project Employer Date of Completion Completion Cost of Project (PKR) 1.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
[1] Experience in General Engineering.
- Design and engineering
Source excerpt for this employer criterion
[1] Experience in General Engineering.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Consultancy Services [2] Experience in Roads & Highways [3] Specific experience of Bridge/Flyover Narrative description of project: Description of actual services provided by your staff within the assignment:
- Consultancy Services [2] Experience in Roads & Highways [3] Specific experience of Bridge/Flyover Narrative description of project:
Source excerpt for this employer criterion
Consultancy Services [2] Experience in Roads & Highways [3] Specific experience of Bridge/Flyover Narrative description of project: Description of actual services provided by your staff within the assignment:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Key personnel
12 explicit requirement(s)29. Redressal of Grievances 29.1. Procuring agency shall constitute a Grievance Redressal Committee (GRC) and proceed in accordance with the procedure and mechanism defined under Rule-48 of Public Procurement Rules, 2004. The GRC shall not have any of the members of Procurement Evaluation Committee. The committee must have one subject specialist depending on the nature of the procurement.
Source excerpt for this employer criterion
29. Redressal of Grievances 29.1. Procuring agency shall constitute a Grievance Redressal Committee (GRC) and proceed in accordance with the procedure and mechanism defined under Rule-48 of Public Procurement Rules, 2004. The GRC shall not have any of the members of Procurement Evaluation Committee. The committee must have one subject specialist depending on the nature of the procurement.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
A particular project for an engineering design service can only be claimed against one of the sub-criteria a) Experience of Engineering Design Consultancy services for a bridge/Flyover project having minimum cost of the project of Rs 1,000 million for local/ US $ 7 Million for foreign JV partner in the last fifteen (15) years. [Eight (08) Points for each successfully completed project with maximum of 16 Points] b) Experience of construction supervision Consultancy services for a bridge/Flyover/Metro having minimum cost of the project of Rs 2,000 million for local/ US $ 7 Million for foreign JV partner in the last fifteen (15) years. [Seven (07) Points for each successfully completed project with maximum of 14 Points]. (Qualitative)(Doc Required) 30 Key Personnel - Refer to Section 3.3.1.3 of Evaluation Criteria Annexure. Project Team Leader – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil Engineering / Project Management Registered with PEC as Professional Engineer. Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Architect – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- $ 7
- Project Team Leader – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Project Team Leader – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Architect – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
Source excerpt for this employer criterion
A particular project for an engineering design service can only be claimed against one of the sub-criteria a) Experience of Engineering Design Consultancy services for a bridge/Flyover project having minimum cost of the project of Rs 1,000 million for local/ US $ 7 Million for foreign JV partner in the last fifteen (15) years. [Eight (08) Points for each successfully completed project with maximum of 16 Points] b) Experience of construction supervision Consultancy services for a bridge/Flyover/Metro having minimum cost of the project of Rs 2,000 million for local/ US $ 7 Million for foreign JV partner in the last fifteen (15) years. [Seven (07) Points for each successfully completed project with maximum of 14 Points]. (Qualitative)(Doc Required) 30 Key Personnel - Refer to Section 3.3.1.3 of Evaluation Criteria Annexure. Project Team Leader – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil Engineering / Project Management Registered with PEC as Professional Engineer. Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Architect – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Project Team Leader – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil Engineering / Project Management Registered with PEC as Professional Engineer. Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Architect – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Project Team Leader – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Project Team Leader – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Architect – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
Source excerpt for this employer criterion
Project Team Leader – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil Engineering / Project Management Registered with PEC as Professional Engineer. Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Architect – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Architect – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Architect – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
Source excerpt for this employer criterion
Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Architect – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Electrical Registered with PEC as Professional Engineer Minimum Relevant Experience:
- Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
Source excerpt for this employer criterion
Architecture Registered with PCATP Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Structural Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Electrical Registered with PEC as Professional Engineer Minimum Relevant Experience:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Electrical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
Source excerpt for this employer criterion
Civil (Structures) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 24 of 64 Pavement Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Electrical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Electrical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- 5 Contract
- Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
Source excerpt for this employer criterion
Civil (Transportation) Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Mechanical / HVAC Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Electrical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Electrical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 27 of 64 Scope of Services The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents.
- 5 Contract
- Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS)…
- Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc.
- years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
Source excerpt for this employer criterion
Mechanical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Electrical Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: M.Sc. Electrical Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 27 of 64 Scope of Services The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
10 years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 27 of 64 Scope of Services The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Scope of Services (page number:
- 5 Contract
- Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS)…
- years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
Source excerpt for this employer criterion
10 years (Qualitative)(Doc Required) 5 Network Design Engineer – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 27 of 64 Scope of Services The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Scope of Services (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 27 of 64 Scope of Services The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Scope of Services (page number:
- 5 Contract
- Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS)…
- Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
- Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc.
Source excerpt for this employer criterion
Computer System / IT / Electronics / Telecom Registered with PEC as Professional Engineer Minimum Relevant Experience: 05 years (Qualitative)(Doc Required) 5 Contract Specialist – Attach Form A-6 and A-7 for proposed Key Expert with Supporting documents Minimum Academic Qualification: B.Sc. Engineering Registered with PEC as Professional Engineer Minimum Relevant Experience: 10 years (Qualitative)(Doc Required) 5 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 25 of 64 e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 26 of 64 Annexure e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 27 of 64 Scope of Services The Annexure attached hereto shall constitute an integral, essential, and binding part of the PQ Documents. The Applicant shall download the aforesaid Annexures, duly sign and stamp each page thereof, and upload the complete scanned copy as an integral part of its submission. Failure to comply with this requirement may render the application non-responsive, in accordance with the applicable procurement rules and the provisions of the PQ Documents Technical Submission (Vendor) Document Required See Form Under Additional Forms and Documents: Scope of Services (page number:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Name of associated consultants, if any: Name of proposed senior professional staff of your firm involved and functions performed (indicate most significant profiles such as project director/coordinator, team leader): Sub-Criteria for Assessment of Experience as per table in Clause 3.1.1.2 [A particular project will be considered against only one sub-criteria] Please tick the relevant sub-criteria:
Source excerpt for this employer criterion
Name of associated consultants, if any: Name of proposed senior professional staff of your firm involved and functions performed (indicate most significant profiles such as project director/coordinator, team leader): Sub-Criteria for Assessment of Experience as per table in Clause 3.1.1.2 [A particular project will be considered against only one sub-criteria] Please tick the relevant sub-criteria:Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
3. Partner Total: e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 58 of 64 Application Form A-6 Personnel Capabilities For specific positions essential to assignment, Applicants should provide the names of Key Experts qualified to meet the specified requirements stated for each position in Clause 3.3.1.3. The data on their experience should be supplied on separate sheets using one Form for each candidate (Application Form A-7 ) along with CVs of candidates duly signed by the Key Expert . The CVs of other Experts which are not specified in this FORM shall not be considered for evaluation 1. Title of Position Name of Prime Candidate 2. Title of Position Name of Prime Candidate 3.
- 6 Personne
Source excerpt for this employer criterion
3. Partner Total: e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 58 of 64 Application Form A-6 Personnel Capabilities For specific positions essential to assignment, Applicants should provide the names of Key Experts qualified to meet the specified requirements stated for each position in Clause 3.3.1.3. The data on their experience should be supplied on separate sheets using one Form for each candidate (Application Form A-7 ) along with CVs of candidates duly signed by the Key Expert . The CVs of other Experts which are not specified in this FORM shall not be considered for evaluation 1. Title of Position Name of Prime Candidate 2. Title of Position Name of Prime Candidate 3.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Company financial capacity
6 explicit requirement(s)materially affect the technical capability and financial resources of an Applicant to perform the contract, however subject to the provisions of ITA 25.
- ITA 25
Source excerpt for this employer criterion
materially affect the technical capability and financial resources of an Applicant to perform the contract, however subject to the provisions of ITA 25.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Yes Affidavit of non-Blacklisting on judicial stamp paper to the effect that the firm/ JV/ Consortium partner(s) has never been blacklisted with any Government Department/ Agency/ Authority Yes Evaluation Criteria Quality Based Selection (QBS) Weightage (Without Financial Criteria) Technical Evaluation % 100 Technical Marks 100 Passing Marks 70 Financial Soundness –Refer to Section 3.3.1.1 of Evaluation Criteria Annexure e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 22 of 64 Average Annual Turnover of the Applicant – Attach audited financial statements for any three of last five financial years duly certified by a Chartered Accounting Firm submitted with (Form A-4).
Source excerpt for this employer criterion
Yes Affidavit of non-Blacklisting on judicial stamp paper to the effect that the firm/ JV/ Consortium partner(s) has never been blacklisted with any Government Department/ Agency/ Authority Yes Evaluation Criteria Quality Based Selection (QBS) Weightage (Without Financial Criteria) Technical Evaluation % 100 Technical Marks 100 Passing Marks 70 Financial Soundness –Refer to Section 3.3.1.1 of Evaluation Criteria Annexure e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 22 of 64 Average Annual Turnover of the Applicant – Attach audited financial statements for any three of last five financial years duly certified by a Chartered Accounting Firm submitted with (Form A-4).Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Average Annual turnover for any three of last five financial years.
Source excerpt for this employer criterion
Average Annual turnover for any three of last five financial years.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Form A-4 shall be filled in this regard. [05 marks if average annual turnover of any three of last five financial years is PKR 500 million or above.] Average Turnover = (Year 1 + Year 2 + Year 3) ÷ 3 [For average turnover of less than PKR 500 million, marks shall be awarded as per following formula: (A × 5 / 500), where ‘A’ is average annual turnover in Million] (Qualitative)(Doc Required) 5 Average Annual Working Capital – Attach audited financial statements for any three of last five financial years duly certified by a Chartered Accounting Firm submitted with (Form A-4).
- PKR 500 million
Source excerpt for this employer criterion
Form A-4 shall be filled in this regard. [05 marks if average annual turnover of any three of last five financial years is PKR 500 million or above.] Average Turnover = (Year 1 + Year 2 + Year 3) ÷ 3 [For average turnover of less than PKR 500 million, marks shall be awarded as per following formula: (A × 5 / 500), where ‘A’ is average annual turnover in Million] (Qualitative)(Doc Required) 5 Average Annual Working Capital – Attach audited financial statements for any three of last five financial years duly certified by a Chartered Accounting Firm submitted with (Form A-4).Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Name of Applicant or partner of a joint venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 56 of 64 Application Form A-4 Financial Capability Applicants, including each partner of a joint venture, should provide financial information to demonstrate that they meet the requirements stated in the Instructions to Applicants.
Source excerpt for this employer criterion
Name of Applicant or partner of a joint venture e-Pak Acquisition and Disposal System (EPADS) generated document | © 2026 Page 56 of 64 Application Form A-4 Financial Capability Applicants, including each partner of a joint venture, should provide financial information to demonstrate that they meet the requirements stated in the Instructions to Applicants.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
3. Partner ANNUAL TURNOVER DATA (Equivalent in PKR, millions) Partner Form A-4 Page No.
Source excerpt for this employer criterion
3. Partner ANNUAL TURNOVER DATA (Equivalent in PKR, millions) Partner Form A-4 Page No.Source location: سامانه ملی تدارکات پاکستان (EPADS) — shortlisting / qualification criteria
Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.