Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Infrastructure lengthKM 0.6
Source / meaning
i) 1Cx185 Sq.mm (for station transformers) KM 0.6
سازمان برق نپال — official notice / tender document
Stated figure — see its source contextGIS 2.0
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سازمان برق نپال — official notice / tender document
Stated figure — see its source contextLS 1
Source / meaning
(vi) Recreation center building LS 1
سازمان برق نپال — official notice / tender document
Stated figure — see its source contextLS 1 1.5
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سازمان برق نپال — official notice / tender document
Stated figure — see its source contextLS 1 1.6
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سازمان برق نپال — official notice / tender document
Stated figure — see its source contextLS 1 5.5
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سازمان برق نپال — official notice / tender document
Stated figure — see its source contextRM 100 400
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سازمان برق نپال — official notice / tender document
Stated figure — see its source contextIII 132
Source / meaning
III 132/33kV, 63MVA Three Phase Power
سازمان برق نپال — official notice / tender document
Stated figure — see its source contextIV 33
Source / meaning
IV 33/11kV, 24MVA Three Phase Power
سازمان برق نپال — official notice / tender document
Electrical voltage level11 KV
Source / meaning
Procurement of Plant for Design, Supply, Installation , Testing and Commissioning of 400/220/132/33/11 KV GIS Substation at Lamahi Dang (ADB Package No.
سازمان برق نپال — official notice / tender document
Electrical voltage level400 KV
Source / meaning
NEW BUTWAL – LAMAHI 400 KV TRANSMISSION LINE PROJECT
سازمان برق نپال — official notice / tender document
Stated figure — see its source context6 GIS
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سازمان برق نپال — official notice / tender document
Stated figure — see its source context2 TR
Source / meaning
1.0 High wall type split AC unit of 2 TR capacities for Control Room Building & GIS
سازمان برق نپال — official notice / tender document
Electrical voltage level132 KV
Source / meaning
For 315MVA , 220/132 KV, 3-phase Power Transformer
سازمان برق نپال — official notice / tender document
View the official objective and scope excerpt
Procurement of Plant for Design, Supply, Installation , Testing and Commissioning of 400/220/132/33/11 KV GIS Substation at Lamahi Dang (ADB Package No. P2)
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Qualification information is incomplete; scoring is paused.

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

3–6

Document, security and collaboration conditions

Tender-document purchase

The official text states a purchase or obtain the tender documents requirement. Check the source evidence below for the exact payment and validity terms.

Exact stated conditions
  • To purchase the bidding documents in English, eligible bidders should:
View exact source evidence
tribution Strengthening Project) Project Management Directorate Matatirtha, Kathmandu, Nepal Telephone: +01-5164099 Electronic mail address: nbktl123@gmail.com , nbktl@nea.org.np 6. To purchase the bidding documents in English, eligible bidders should: First Date of Publication: 29 June 2026 Loan/Grant No. and Title: Loan No. 4520 (COL.), Loan No. 8485, Grant No. 0983 (SF) Grant No. 0984 (EF): South Asia Subregional Economic Cooperation Electricity Transmission and Distribution Strengthening Project Contract No. and Title: NEA/PMD/ETDSP/LAMSS-081/82-01: Procurement of Plant for Design, Supply, Installation, Testing and Commissioning of 400/220/132/33/11kV GIS Substation at Lamahi, Dang (ADB Package No.- P-2) . Deadline for Submission of…
Locator: سازمان برق نپال — official notice / tender document

Technical / financial proposal security

The official text states a bid or proposal security requirement. Check the source evidence below for the exact payment and validity terms.

Exact stated conditions
  • together with a Bid Security with amount indicated in Bidding Document Section 2 Bid
View exact source evidence
Kathmandu, Nepal Account Type: US Dollar 7. Deliver your bid: • to the address above • on or before the deadline: 19 August 2026 at 12:00 Hours (Nepal Standard Time). • together with a Bid Security with amount indicated in Bidding Document Section 2 Bid data Sheet, Clause ITB 21.1. Technical Bids will be opened at the Project Manager’s Office on 19 August 2026 at 12:30 hours (Nepal Standard Time) in the presence of bidders’ representatives who choose to attend, whereas the Financial Bids shall remain sealed and unopened and shall be placed locked. The Financial…
Locator: سازمان برق نپال — official notice / tender document

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.