1. Project objective
functional requirement and scope of work defined in Employer's Requirements. Based on the detailed engineering and design, the Contractor shall prepare and submit the final BOQ within the days as mentioned in the Bid documents.
Source / meaning
i) 90 KN (Nominal Length: 1740mm, Minimumسازمان برق نپال — official notice / tender document
Source / meaning
iii) 160 KN (Nominal Length: 1530mm, Minimumسازمان برق نپال — official notice / tender document
Source / meaning
5.9 Double sheeve pulley block 5 MT capacityسازمان برق نپال — official notice / tender document
Source / meaning
5.10 Four sheeve pulley block 10 MT capacity completeسازمان برق نپال — official notice / tender document
Source / meaning
Dailekh - Kalikot - Jumla 132 kV Transmission Line Projectسازمان برق نپال — official notice / tender document
Source / meaning
Dailekh - Kalikot - Jumla 132kV Transmission Line Projectسازمان برق نپال — official notice / tender document
Source / meaning
a) Normal Earthing (120 m length) Nos.سازمان برق نپال — official notice / tender document
Source / meaning
b) Normal Earthing (280 m length) Nos.سازمان برق نپال — official notice / tender document
Source / meaning
a) Normal Earthing-120 meter length Nos.سازمان برق نپال — official notice / tender document
Source / meaning
b) Normal Earthing-280 meter length Nos.سازمان برق نپال — official notice / tender document
View the official objective and scope excerpt
functional requirement and scope of work defined in Employer's Requirements. Based on the detailed engineering and design, the Contractor shall prepare and submit the final BOQ within the days as mentioned in the Bid documents.
Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.
Shortlisting / qualification criteria
FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.
Document, security and collaboration conditions
Tender-document purchase
The official text states a purchase or obtain the tender documents requirement. Check the source evidence below for the exact payment and validity terms.
- To purchase the Bidding Documents in English, eligible Bidders should: • write to the address above requesting the Bidding Documents for
View exact source evidence
kV Transmission Line Project Project Management Directorate Matathirtha, Kathmandu, Nepal Telephone: +977-1-5164099 Electronic mail address: dkj.nea@nea.org.np, dkj.nea@gmail.com 6. To purchase the Bidding Documents in English, eligible Bidders should: • write to the address above requesting the Bidding Documents for NEA/PMD/ETDSP/DKJTL-082/83-01: Design, Supply, Installation, Testing and Commissioning of Dailekh - Kalikot - Jumla 132 kV Transmission Line. First Date of Publication: 29 June, 2026 Grant/Loan No. and Title: 4520 (COL.), Loan No. 8485, Grant No. 0983 (SF) Grant No. 0984 (EF): South Asia Subregional Economic Cooperation Electricity Transmission and Distribution Strengthening Project Contract No. and Title: NEA/PMD/ETDSP/DKJTL-082/83-01:…Locator: سازمان برق نپال — official notice / tender document
Technical / financial proposal security
The official text states a bid or proposal security requirement. Check the source evidence below for the exact payment and validity terms.
- together with a Bid Security as described in the Bidding Document
View exact source evidence
epal Account Type: US Dollar 7. Deliver your bid: • to the address mentioned above; • on or before the deadline: 21 August, 2026 at 12:00 hours (Nepal Standard Time); • together with a Bid Security as described in the Bidding Document. Technical Bids will be opened promptly after the deadline for bid submission at the Project Manager’s Office on 21 August, 2026 at 12:30 hours (Nepal Standard Time) in the presence of bidders’ representatives who choose to attend, whereas the Financial Bids shall remain sealed and unopened and shall be placed locked. The Financial Bids…Locator: سازمان برق نپال — official notice / tender document
Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.