REOI · نپال

Hiring of Senior Hydrologist

Official-source record independently monitored by FANAB. Verify amendments, eligibility and the final deadline on the buyer's official page before acting.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

Official notice · Medium confidence

Project objective

The Government of Nepal (GoN) has received financing from the World Bank toward the preparation and implementation of the Kathmandu Valley Water Security Improvement Project (KV WaSIP) – Sisneri Water Supply Project and intends to apply part of the proceeds for consulting services. The consulting services include providing technical, procurement, financial management, environmental and social, contract management, and other professional support required for effective implementation of the Project through the Project Management Unit (PMU)

Shortlisting / qualification criteria

4 explicit criterion/criteria
  • 1
    EligibilityOfficial notice · High confidence

    Meet the eligibility, origin and legal requirements stated in the notice

    Source evidence: The Kathmandu Valley Water Supply Management Board (KVWSMB) intends to apply part of the proceeds of this financing to eligible payments under the contract for hiring Senior Hydrologist and requests applications from suitably qualified and interested candidates to fill the position.Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
  • 2
    General experienceOfficial notice · High confidence

    Demonstrate a reliable general track record in the required field

    Source evidence: The Senior Hydrologist shall possess strong academic qualifications and demonstrated professional experience relevant to dam hydrology, sediment management, hydraulic analysis, and reservoir operations for large water infrastructure projects.Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
  • 3
    Similar assignment experienceOfficial notice · High confidence

    Demonstrate satisfactory experience and performance on similar assignments or contracts

    Source evidence: Qualifications and Relevant ExperienceLocator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
  • 4
    General experienceOfficial notice · High confidence

    Demonstrate a reliable general track record in the required field

    Minimum 15 years
    Source evidence: At least 15 years of relevant professional experience in hydrological assessment, hydrological modelling, flood estimation, sediment studies, reservoir operation analysis, and review or design support for dam or major water resources infrastructure projects.Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
How FANAB identified the technical subject
  • project: water security
  • objective: hydrological، hydrology
  • activities: water security
  • deliverables: hydrological modelling، flood management، water resources
Project country
نپال
Financier / source
بانک جهانی (World Bank)
Primary company / procurement group
Not assigned — document review required
Source category label
خدمات مشاوره
Notice type
REOI — Request for Expressions of Interest
Qualification or selection route
Individual consultant route
Source stage / label
REOI
Technical subject
منابع آب
Employer
Kathmandu Valley Water Supply Management Board
Deadline
11 September 2026
Publication date
26 August 2026
Eligibility note
اشخاص حقیقی
Document language
انگلیسی
Project ID
P517244
Reference number
NP-KVWSMB-560379-CS-INDV-HYDROLOGIST
Private company analysis

Match the criteria to your company

FANAB compares only this account's accepted profile evidence with criteria explicitly extracted from the official notice.

Private · no public sharing
Checking source-backed criteria…