Hiring of Senior Hydrologist
Official-source record independently monitored by FANAB. Verify amendments, eligibility and the final deadline on the buyer's official page before acting.
Project objective and employer selection criteria
Project objective
The Government of Nepal (GoN) has received financing from the World Bank toward the preparation and implementation of the Kathmandu Valley Water Security Improvement Project (KV WaSIP) – Sisneri Water Supply Project and intends to apply part of the proceeds for consulting services. The consulting services include providing technical, procurement, financial management, environmental and social, contract management, and other professional support required for effective implementation of the Project through the Project Management Unit (PMU)
Shortlisting / qualification criteria
4 explicit criterion/criteria- 1
EligibilityOfficial notice · High confidence Meet the eligibility, origin and legal requirements stated in the notice
Source evidence: The Kathmandu Valley Water Supply Management Board (KVWSMB) intends to apply part of the proceeds of this financing to eligible payments under the contract for hiring Senior Hydrologist and requests applications from suitably qualified and interested candidates to fill the position.Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria - 2
General experienceOfficial notice · High confidence Demonstrate a reliable general track record in the required field
Source evidence: The Senior Hydrologist shall possess strong academic qualifications and demonstrated professional experience relevant to dam hydrology, sediment management, hydraulic analysis, and reservoir operations for large water infrastructure projects.Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria - 3
Similar assignment experienceOfficial notice · High confidence Demonstrate satisfactory experience and performance on similar assignments or contracts
Source evidence: Qualifications and Relevant ExperienceLocator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria - 4
General experienceOfficial notice · High confidence Demonstrate a reliable general track record in the required field
Minimum 15 yearsSource evidence: At least 15 years of relevant professional experience in hydrological assessment, hydrological modelling, flood estimation, sediment studies, reservoir operation analysis, and review or design support for dam or major water resources infrastructure projects.Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
How FANAB identified the technical subject
- project: water security
- objective: hydrological، hydrology
- activities: water security
- deliverables: hydrological modelling، flood management، water resources
- Project country
- نپال
- Financier / source
- بانک جهانی (World Bank)
- Primary company / procurement group
- Not assigned — document review required
- Source category label
- خدمات مشاوره
- Notice type
- REOI — Request for Expressions of Interest
- Qualification or selection route
- Individual consultant route
- Source stage / label
- REOI
- Technical subject
- منابع آب
- Employer
- Kathmandu Valley Water Supply Management Board
- Deadline
- 11 September 2026
- Publication date
- 26 August 2026
- Eligibility note
- اشخاص حقیقی
- Document language
- انگلیسی
- Project ID
- P517244
- Reference number
- NP-KVWSMB-560379-CS-INDV-HYDROLOGIST
Match the criteria to your company
FANAB compares only this account's accepted profile evidence with criteria explicitly extracted from the official notice.
