REOI · Eastern and Southern Africa

Contrôle et de supervision des travaux de drainage et protection côtière

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Contract estimate in source metadata; not stated in notice textUSD 1,100,000
Source / meaning
Official record metadata: USD 1,100,000
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Stated figure — see its source context1 Project
Source / meaning
Regional Climate Resilience Program for Eastern and Southern Africa 1 Project (RCRP1) · Quality And Cost-Based Selection · شماره مرجع 2025-05-CON.SUP.TVX-DRAINAGE-UGP-PRRC
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
View the official objective and scope excerpt
Regional Climate Resilience Program for Eastern and Southern Africa 1 Project (RCRP1) · Quality And Cost-Based Selection · شماره مرجع 2025-05-CON.SUP.TVX-DRAINAGE-UGP-PRRC
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Qualification criteria reviewed. Check the latest tender documents before submission.

No explicit requirement in this category was found in FANAB's currently available official text. This does not prove that the complete tender documents contain no such requirement.

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.