IFB · بنگلادش

Expansion of Benapole Land Port- Construction Parking Yard, Sheds and Modem Chemical Godowns with other ancillary facilities

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Contract estimate in source metadata; not stated in notice textUSD 44,067,796
Source / meaning
Official record metadata: USD 44,067,796
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Stated figure — see its source context1 Project
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Construction duration20 months
Source / meaning
The construction period is twenty (20) months.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Project lot / phasePhase 1
Source / meaning
– Bangladesh Phase 1: (BLPA Component) Project
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
View the official objective and scope excerpt
Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project · Request for Bids · شماره مرجع BLPA-W3
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Document review complete: the notice and 0 of 0 discovered attachment(s) were read.

No explicit requirement in this category was found in FANAB's currently available official text. This does not prove that the complete tender documents contain no such requirement.

3–6

Document, security and collaboration conditions

Tender-document purchase

The official text states a purchase or obtain the tender documents requirement. Check the source evidence below for the exact payment and validity terms.

Exact stated conditions
  • (a) To collect the bidding documents from the office of the Employer, the bidder on his official letter head pad will submit application to the Project Director, ACCESS Project together with the deposit receipt of money of the non-refundable fee in the amount of Bangladesh Taka 12,500
View exact source evidence
bsite of the Employer www.blpa.gov.bd . 6. The Bidding document in English may be purchased by interested eligible Bidders through either of the following two options: (a) To collect the bidding documents from the office of the Employer, the bidder on his official letter head pad will submit application to the Project Director, ACCESS Project together with the deposit receipt of money of the non-refundable fee in the amount of Bangladesh Taka 12,500.00 or US Dollars 100.00 in the bank account of the Employer given below and the bidding documents may be collected by the bidder…
Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document

Technical / financial proposal security

The official text states a bid or proposal security requirement; stated amount: BDT 54. Check the source evidence below for the exact payment and validity terms.

Stated amount / value: BDT 54
Exact stated conditions
  • All Bids must be accompanied by a: (i) Bid Security of Amount BDT 54
View exact source evidence
All envelopes marked “FINANCIAL PART” shall remain unopened and will be held in safe custody of the Employer until the second public Bid opening 8. All Bids must be accompanied by a: (i) Bid Security of Amount BDT 54.00 million (BDT fifty-four million) or USD 440,000.00 (USD four hundred forty thousand) in favour of “Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bangladesh Phase 1: (BLPA Component) Project; and (ii) Local Labour Method Statement. 9. Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s beneficial…
Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.