REOI · موزامبیک

Consultancy Services for Supervision of Civil Works to Improve Road Safety at Schools and locations along the Nacala Corridor with iRAP Less Than Three Stars

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Contract estimate in source metadata; not stated in notice textUSD 1,500,000
Source / meaning
Official record metadata: USD 1,500,000
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Stated figure — see its source contextSOP 2
Source / meaning
Transport Corridors for Economic Resilience Mozambique SOP 2 Project · Quality And Cost-Based Selection · شماره مرجع 45A000141/CP/06/2026
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Stated figure — see its source context2 Project
Source / meaning
Transport Corridors for Economic Resilience Mozambique SOP 2 Project · Quality And Cost-Based Selection · شماره مرجع 45A000141/CP/06/2026
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
View the official objective and scope excerpt
Transport Corridors for Economic Resilience Mozambique SOP 2 Project · Quality And Cost-Based Selection · شماره مرجع 45A000141/CP/06/2026
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Qualification criteria reviewed. Check the latest tender documents before submission.
1

Organisation history and structure

2 explicit requirement(s)
Organization and business historyOfficial notice · High confidence · Shortlisting stage

• Profile of the Firm/ Core business demonstrating roads and bridge design experience; experience in works supervision of road improvement or rehabilitation contracts;

Source excerpt for this employer criterion
• Profile of the Firm/ Core business demonstrating roads and bridge design experience; experience in works supervision of road improvement or rehabilitation contracts;
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
General experienceOfficial notice · High confidence · Shortlisting stage

• General experience of the firm (must be at least 20 years) in the field; and

Relevant experience: at least 20 years
Source excerpt for this employer criterion
• General experience of the firm (must be at least 20 years) in the field; and
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
2

Technical and managerial capability

No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.

No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.

3

Similar experience

1 explicit requirement(s)
Similar assignment experienceOfficial notice · High confidence · Shortlisting stage

• Description of at least five (5) similar assignments demonstrating the Consultant’s experience, with contracts in similar conditions.

Completed similar assignments: at least 5
Source excerpt for this employer criterion
• Description of at least five (5) similar assignments demonstrating the Consultant’s experience, with contracts in similar conditions.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
4

Key personnel

No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.

No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.

Key experts are not evaluated at the shortlisting stage; this statement alone is not a waiver of CV submission.

5

Company financial capacity

No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.

No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.

3–6

Document, security and collaboration conditions

Consortium and local-partner condition

A consortium or association is permitted by the document.

Find matched partners in my panelTender-specific partner matching is available to company accounts with Business Development access or higher.
View 1 exact source clause(s)
Bank’s policy on conflict of interest. Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. A Consultant will be selected in accordance with the Quality and Cost Based Selection method set out in the Procurement Regulations and to be specifically set out in the Request for Proposals. Further information can be…
Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.