REOI · لبنان

Framework Agreements for the Assessment, Reconstruction Design and Supervision of Totally Damaged Public Buildings

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

Official notice · Medium confidence

1. Project objective

The Framework Agreements will be concluded through a Two-Stage Selection Process and the consulting services shall include the preparation of: Module 1 – Technical Investigations and Feasibility Assessment Module 2 – Detailed Engineering Design and Procurement Support Module 3 - Permit Documents (reconstruction permit, if required)

Important stated figures and their meaning
Contract estimate in source metadata; not stated in notice textUSD 1,500,000
Source / meaning
Official record metadata: USD 1,500,000
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Stated figure — see its source context36 months
Source / meaning
The Framework Agreement will be signed for a duration of Thirty-Six (36) months with multiple qualified engineering consultancy firms.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
View the official objective and scope excerpt
The Framework Agreements will be concluded through a Two-Stage Selection Process and the consulting services shall include the preparation of: Module 1 – Technical Investigations and Feasibility Assessment Module 2 – Detailed Engineering Design and Procurement Support Module 3 - Permit Documents (reconstruction permit, if required)

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Only requirements explicitly found in the available official text are shown.
1

Organisation history and structure

Not found among the extracted criteria

No explicit requirement in this category appears among the criteria extracted from the currently available official text. Verify the complete notice, TOR and addenda.

2

Technical and managerial capability

Not found among the extracted criteria

No explicit requirement in this category appears among the criteria extracted from the currently available official text. Verify the complete notice, TOR and addenda.

3

Similar experience

Not found among the extracted criteria

No explicit requirement in this category appears among the criteria extracted from the currently available official text. Verify the complete notice, TOR and addenda.

4

Key personnel

1 explicit requirement(s)
Key personnel or expertsOfficial notice · High confidence

Key Staff Pool & Quality Management (Stage 1 Requirements):

Evidence preparation — FANAB guidance

Map each stated role to its CV, qualifications, references and availability; verify the required format and submission stage.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
Key Staff Pool & Quality Management (Stage 1 Requirements):
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
5

Eligibility and legal requirements

Not found among the extracted criteria

No explicit requirement in this category appears among the criteria extracted from the currently available official text. Verify the complete notice, TOR and addenda.

6

Company financial capacity

1 explicit requirement(s)
Financial capacityOfficial notice · High confidence

• Legal registration and authorization to operate in its country of incorporation, demonstrating financial soundness.

Evidence preparation — FANAB guidance

Map financial statements, audit reports and turnover for the required period/currency to the threshold; project budget is not company turnover.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
• Legal registration and authorization to operate in its country of incorporation, demonstrating financial soundness.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
7

Other employer-specific criteria

7 explicit requirement(s)
Other employer criterionOfficial notice · High confidence

• Design: Completion of at least three (3) projects of similar scale and complexity within the last ten (10) years, involving detailed assessment,construction Design, as well as in the preparation of technical specifications, Bills of Quantities of buildings

Completed similar assignments: at least 3Reference period: last 10 years
Stated figures, fees, dimensions or capacity
  • three (3) projects
  • ten (10) years
Evidence preparation — FANAB guidance

Map this exact clause to verifiable evidence and confirm format, issuer and validity with the employer documents; an unspecified document is not an employer requirement. Verify completion within the stated 10-year window against the employer's reference date.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
• Design: Completion of at least three (3) projects of similar scale and complexity within the last ten (10) years, involving detailed assessment,construction Design, as well as in the preparation of technical specifications, Bills of Quantities of buildings
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence

• Supervision: Experience as Lead Engineer/Supervision Consultant on at least two (2) projects within the last ten (10) years involving construction supervision and contract management of Buildings

Completed similar assignments: at least 2Reference period: last 10 years
Stated figures, fees, dimensions or capacity
  • two (2) projects
  • ten (10) years
Evidence preparation — FANAB guidance

Map this exact clause to verifiable evidence and confirm format, issuer and validity with the employer documents; an unspecified document is not an employer requirement. Verify completion within the stated 10-year window against the employer's reference date.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
• Supervision: Experience as Lead Engineer/Supervision Consultant on at least two (2) projects within the last ten (10) years involving construction supervision and contract management of Buildings
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence

• Proven experience under international financing institutions (preferably World Bank standards and Guidelines) and familiarity with Lebanese technical/regulatory frameworks.

Evidence preparation — FANAB guidance

Map this exact clause to verifiable evidence and confirm format, issuer and validity with the employer documents; an unspecified document is not an employer requirement.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
• Proven experience under international financing institutions (preferably World Bank standards and Guidelines) and familiarity with Lebanese technical/regulatory frameworks.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence

• A standard Quality Management Approach and preliminary methodology

Evidence preparation — FANAB guidance

Map this exact clause to verifiable evidence and confirm format, issuer and validity with the employer documents; an unspecified document is not an employer requirement.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
• A standard Quality Management Approach and preliminary methodology
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence

• Demonstrated organizational and managerial capacity, including adequate in-house technical resources and project management systems to deliver assessment, feasibility, design, and construction-related technical services for the reconstruction of totally damaged public buildings, including multiple sites concurrently.

Evidence preparation — FANAB guidance

Map this exact clause to verifiable evidence and confirm format, issuer and validity with the employer documents; an unspecified document is not an employer requirement.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
• Demonstrated organizational and managerial capacity, including adequate in-house technical resources and project management systems to deliver assessment, feasibility, design, and construction-related technical services for the reconstruction of totally damaged public buildings, including multiple sites concurrently.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence

• Submission of a Quality Management Approach (maximum ten (10) pages) describing the Firm’s standard procedures, organizational arrangements, and quality assurance and quality control mechanisms for assessment, feasibility studies, architectural, structural and seismic, and MEP design, preparation of technical specifications, BOQs, cost estimates, tender documents, and construction-related technical services for totally damaged buildings.

Evidence preparation — FANAB guidance

Map this exact clause to verifiable evidence and confirm format, issuer and validity with the employer documents; an unspecified document is not an employer requirement.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
• Submission of a Quality Management Approach (maximum ten (10) pages) describing the Firm’s standard procedures, organizational arrangements, and quality assurance and quality control mechanisms for assessment, feasibility studies, architectural, structural and seismic, and MEP design, preparation of technical specifications, BOQs, cost estimates, tender documents, and construction-related technical services for totally damaged buildings.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence

• Requests for clarification on the REOI or TOR may not be replied to at this time, as the allocated time for submission of EOI does not permit such exchanges.

Evidence preparation — FANAB guidance

Map this exact clause to verifiable evidence and confirm format, issuer and validity with the employer documents; an unspecified document is not an employer requirement.

Preparation advice, not an additional employer requirement. Submit only the documents and formats required by the notice/TOR for this stage.
Source excerpt for this employer criterion
• Requests for clarification on the REOI or TOR may not be replied to at this time, as the allocated time for submission of EOI does not permit such exchanges.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Complete retrieved official text
REQUEST FOR EXPRESSIONS OF INTEREST (FRAMEWORK AGREEMENTS FOR CONSULTING SERVICES ) Lebanese Republic Council for Development and Reconstruction (CDR) Lebanon Emergency Assistance Project (LEAP) Procurement Reference: FA-CS-BLDG (TOTAL DAMAGE) Assignment Title: Framework Agreements for the Assessment, Reconstruction Design, and Construction Supervision of Totally Damaged Public Buildings The Lebanese Republic (hereinafter called the “Borrower”) has received financing in the amount of US$250 million from the International Bank for Reconstruction and Development (IBRD) (the “Bank”) toward the cost of the Lebanon Emergency Assistance Project (LEAP). The Council for Development and Reconstruction (CDR), acting as the executing agency on behalf of the Government of Lebanon, intends to apply part of the proceeds of this financing to eligible payments under contracts for consulting services under Framework Agreements. The consulting services (“the Services”) involve engaging Design & Supervision Consultants under Framework Agreements for several contracts for assessment, reconstruction design, and construction supervision of public buildings that have been totally damaged (destroyed) across Beirut & Mount Lebanon, Bekaa, and South Lebanon The Framework Agreements will be concluded through a Two-Stage Selection Process and the consulting services shall include the preparation of: Module 1 – Technical Investigations and Feasibility Assessment Module 2 – Detailed Engineering Design and Procurement Support Module 3 - Permit Documents (reconstruction permit, if required) Module 4 – Construction Supervision and Contract Administration The Framework Agreement will be signed for a duration of Thirty-Six (36) months with multiple qualified engineering consultancy firms. Specific assignments will be awarded as Call-Off contracts across distinct Call-Off Modules for Totally damage buildings on an as-needed basis. The full version of the Terms of Reference (TOR) can be found on the CDR website at: https://www.cdr.gov.lb/Procurement. The Council for Development and Reconstruction (CDR) now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. Consultant Brochures may also be included in the submission. The shortlisting criteria for Stage 1 evaluation are: 1. Firm Legal Standing & Core Buisness and Years of Experience • Legal registration and authorization to operate in its country of incorporation, demonstrating financial soundness. • Legally established consulting firm (or lead member of a Joint Venture of maximum two (2) members) with a minimum of Fifteen (15 ) years of demonstrated experience in design and supervision services for buildings projects. (preferably Public Building) 2. Specific Technical Experience : • Design: Completion of at least three (3) projects of similar scale and complexity within the last ten (10) years, involving detailed assessment,construction Design, as well as in the preparation of technical specifications, Bills of Quantities of buildings • Supervision: Experience as Lead Engineer/Supervision Consultant on at least two (2) projects within the last ten (10) years involving construction supervision and contract management of Buildings • Proven experience under international financing institutions (preferably World Bank standards and Guidelines) and familiarity with Lebanese technical/regulatory frameworks. 3. Key Staff Pool & Quality Management (Stage 1 Requirements): • Submission of an accessible Key Experts pool available on an "on-call" basis. • A standard Quality Management Approach and preliminary methodology 4 . Organizational & Managerial Capacity: • Demonstrated organizational and managerial capacity, including adequate in-house technical resources and project management systems to deliver assessment, feasibility, design, and construction-related technical services for the reconstruction of totally damaged public buildings, including multiple sites concurrently. • Submission of a Quality Management Approach (maximum ten (10) pages) describing the Firm’s standard procedures, organizational arrangements, and quality assurance and quality control mechanisms for assessment, feasibility studies, architectural, structural and seismic, and MEP design, preparation of technical specifications, BOQs, cost estimates, tender documents, and construction-related technical services for totally damaged buildings. The EOI submission shall be limited to twenty five (25) pages maximum. Pages beyond twenty five (25) pages may not be reviewed. Please note that at this shortlisting stage: • Technical and financial proposals are not requested. • Key Experts, if proposed for the assignment, will not be evaluated. • Requests for clarification on the REOI or TOR may not be replied to at this time, as the allocated time for submission of EOI does not permit such exchanges. The shortlist shall comprise five (5) to eight (8) consulting firms. The attention of interested Consultants is drawn to Section III, paragraphs 3.14, 3.16 and 3.17 of the World Bank's Procurement Regulations for IPF Borrowers for Goods, Works, Non-Consulting Services and Consulting Services, dated February 2025, setting forth the World Bank's policy on conflict of interest. Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a Joint Venture and/or a sub-consultancy. In the case of a Joint Venture, all partners shall be jointly and severally liable for the entire contract if selected. Shortlisted Consultants will be invited to submit their proposals under the Framework Agreement, upon which a Consultant will be selected in accordance with the Least Cost Selection (LCS) method described in the “World Bank “Procurement Regulations for IPF Borrowers for Goods, Works, Non-Consulting services” dated February 2025 and to be specifically set out in the Request for Proposals. The deadline for receiving Expressions of Interest shall be by Tuesday, September 15th, 2026 at 12:00 noon Beirut local time. Expressions of Interest (EOI) shall be delivered to the address below by hand or courier, including one (1) original, one (1) copy and one (1) electronic copy on CD-ROM. Address: Council for Development and Reconstruction (CDR) Tenders Department Beirut – Lebanon Telephone: (+961-1) 980096 Facsimile: (+961-1) 981255
3–6

Document, security and collaboration conditions

Tender-document purchase

The official text states a purchase or obtain the tender documents requirement. Check the source evidence below for the exact payment and validity terms.

Exact stated conditions
  • s standard procedures, organizational arrangements, and quality assurance and quality control mechanisms for assessment, feasibility studies, architectural, structural and seismic, and MEP design, preparation of technical specifications, BOQs, cost estimates, tender documents, and construction-related technical services for totally damaged buildings
View exact source evidence
d quality assurance and quality control mechanisms for assessment, feasibility studies, architectural, structural and seismic, and MEP design, preparation of technical specifications, BOQs, cost estimates, tender documents, and construction-related technical services for totally damaged buildings. The EOI submission shall be limited to twenty five (25) pages maximum. Pages beyond twenty five (25) pages may not be reviewed. Please note that at this shortlisting stage: • Technical and financial proposals are not requested. • Key Experts, if proposed for the assignment, will not be evaluated. • Requests for clarification on the REOI or TOR may not be…
Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document

Consortium and local-partner condition

The official text contains consortium or joint-venture conditions, but the currently available wording does not conclusively establish whether that structure is permitted or mandatory.

View 1 exact source clause(s)
• Legally established consulting firm (or lead member of a Joint Venture of maximum two (2) members) with a minimum of Fifteen (15 ) years of demonstrated experience in design and supervision services for buildings projects. (preferably Public Building)
Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.