Management & Supervision Consultancy (MSC) Services for Remaining Works of Terminals & Landing Stations

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Contract estimate in source metadata; not stated in notice textUSD 1,461,131.47
Source / meaning
Official record metadata: USD 1,461,131.47
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Stated figure — see its source context1 Project
Source / meaning
Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project · Quality And Cost-Based Selection · شماره مرجع BRWTP-S20
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Reference look-back period18 months
Source / meaning
The Services will last 18 months, are expected to commence in January 2027, and will not extend beyond 30 June 2028.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Stated figure — see its source context2027, an
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Project lot / phasePhase 1
Source / meaning
Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project · Quality And Cost-Based Selection · شماره مرجع BRWTP-S20
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
View the official objective and scope excerpt
Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project · Quality And Cost-Based Selection · شماره مرجع BRWTP-S20
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Document review is incomplete: 0 of 0 discovered attachment(s) were read; scoring is suspended.
1

Organisation history and structure

2 explicit requirement(s)
Organization and business historyOfficial notice · High confidence · Shortlisting stage

(a) General experience of the firm (core business and years in business) in the construction supervision of civil engineering works;

Source excerpt for this employer criterion
(a) General experience of the firm (core business and years in business) in the construction supervision of civil engineering works;
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence · Shortlisting stage

• The firm's incorporation, trade, or registration documents issued in the firm's country of registration;

Source excerpt for this employer criterion
• The firm's incorporation, trade, or registration documents issued in the firm's country of registration;
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
2

Technical and managerial capability

2 explicit requirement(s)
Technical and managerial capabilityOfficial notice · High confidence · Shortlisting stage

(b) relevant experience in supervising works of similar nature, size and complexity (waterway terminals, ports, jetties, landing stations or comparable marine infrastructure) as Engineer/Project Manager under FIDIC or comparable conditions, including environmental and social supervision, preferably in Bangladesh or comparable riverine conditions on development partner-financed assignments; and (c) technical and managerial capability of the firm. Assignments cited may be supported by client-issued evidence.

Required similar activities / tasks
  • Supervision and contract administration
  • Environmental and social studies
  • Environmental and social safeguards, stakeholder engagement, GRM, OHS and GBV mitigation
Source excerpt for this employer criterion
(b) relevant experience in supervising works of similar nature, size and complexity (waterway terminals, ports, jetties, landing stations or comparable marine infrastructure) as Engineer/Project Manager under FIDIC or comparable conditions, including environmental and social supervision, preferably in Bangladesh or comparable riverine conditions on development partner-financed assignments; and (c) technical and managerial capability of the firm. Assignments cited may be supported by client-issued evidence.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence · Shortlisting stage

• The firm's brochures; and

Source excerpt for this employer criterion
• The firm's brochures; and
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
3

Similar experience

2 explicit requirement(s)
Similar assignment experienceOfficial notice · High confidence · Shortlisting stage

(b) relevant experience in supervising works of similar nature, size and complexity (waterway terminals, ports, jetties, landing stations or comparable marine infrastructure) as Engineer/Project Manager under FIDIC or comparable conditions, including environmental and social supervision, preferably in Bangladesh or comparable riverine conditions on development partner-financed assignments; and (c) technical and managerial capability of the firm. Assignments cited may be supported by client-issued evidence.

Required similar activities / tasks
  • Supervision and contract administration
  • Environmental and social studies
  • Environmental and social safeguards, stakeholder engagement, GRM, OHS and GBV mitigation
Source excerpt for this employer criterion
(b) relevant experience in supervising works of similar nature, size and complexity (waterway terminals, ports, jetties, landing stations or comparable marine infrastructure) as Engineer/Project Manager under FIDIC or comparable conditions, including environmental and social supervision, preferably in Bangladesh or comparable riverine conditions on development partner-financed assignments; and (c) technical and managerial capability of the firm. Assignments cited may be supported by client-issued evidence.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence · Shortlisting stage

• A description of similar consultancy contracts, including the scope, contract amount, client's name, contract period (from the date of contract signing to the date of completion), location or country of the services, etc

Source excerpt for this employer criterion
• A description of similar consultancy contracts, including the scope, contract amount, client's name, contract period (from the date of contract signing to the date of completion), location or country of the services, etc
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
4

Key personnel

Not found among the extracted criteria

No explicit requirement in this category appears among the criteria extracted from the currently available official text. Verify the complete notice, TOR and addenda.

Key experts are not evaluated at the shortlisting stage; this statement alone is not a waiver of CV submission.

3–6

Document, security and collaboration conditions

Consortium and local-partner condition

A consortium or association is permitted by the document.

Find matched partners in my panelTender-specific partner matching is available to company accounts with Business Development access or higher.
View 1 exact source clause(s)
icy on conflict of interest. Contractors executing any of the works to be supervised, and their affiliates, are not eligible. 5. Consultants may associate with other firms in the form of a joint venture or a sub-consultancy to enhance their qualifications, and should indicate clearly the form of association. In a joint venture, all partners shall be jointly and severally liable for the entire contract, if selected. In the case of an association, the consultants must explain in their EOI submission: (a) the rationale for forming the association; and (b) the anticipated role and relevant qualifications…
Locator: سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.