REOI · کامبوج

Technical Study on the Impact of Electric Vehicles on the Electricity Distribution Network in Cambodia.

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Contract estimate in source metadata; not stated in notice textUSD 20,000
Source / meaning
Official record metadata: USD 20,000
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Service duration3 months
Source / meaning
The assignment is expected to start in October 2026 with the contract duration of 3 months.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Required experience≥ 8 years
Source / meaning
with at least 8 years of total work experience
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Required experience≥ 5 years
Source / meaning
• At least 5 years of relevant professional experience in power systems, electricity distribution, energy planning, EVs, renewable energy integration, or related fields.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Required experience≥ 3 years
Source / meaning
• Experience at least 3 years in preparing technical studies, feasibility studies, investment plans, sector assessments, or policy/strategy documents or in assessing electricity demand, distribution-network impacts, with load forecasting and/or power-system analysis
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
View the official objective and scope excerpt
Cambodia Sustainable Energy Transition Project Preparation · Individual Consultant Selection · شماره مرجع CSET-EDC-CS04-01
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Only requirements explicitly found in the available official text are shown.
1

Organisation history and structure

Not stated in the available text

No explicit requirement in this category was found in FANAB's currently available official text. This does not prove that the complete tender documents contain no such requirement.

2

Technical and managerial capability

Not stated in the available text

No explicit requirement in this category was found in FANAB's currently available official text. This does not prove that the complete tender documents contain no such requirement.

3

Similar experience

Not stated in the available text

No explicit requirement in this category was found in FANAB's currently available official text. This does not prove that the complete tender documents contain no such requirement.

4

Key personnel

Not stated in the available text

No explicit requirement in this category was found in FANAB's currently available official text. This does not prove that the complete tender documents contain no such requirement.

5

Eligibility and legal requirements

Not stated in the available text

No explicit requirement in this category was found in FANAB's currently available official text. This does not prove that the complete tender documents contain no such requirement.

6

Company financial capacity

Not stated in the available text

No explicit requirement in this category was found in FANAB's currently available official text. This does not prove that the complete tender documents contain no such requirement.

7

Other employer-specific criteria

Not stated in the available text

No explicit requirement in this category was found in FANAB's currently available official text. This does not prove that the complete tender documents contain no such requirement.

Complete retrieved official text
REQUEST FOR EXPRESSIONS OF INTEREST Technical Study on the Impact of Electric Vehicles on the Electricity Distribution Network in Cambodia Individual Consultant (Time-Base Contract) Date: September 11th, 2026 CAMBODIA Project Name : Cambodia Sustainable Energy Transition Project Grant No. : E5130 Assignment Title : Technical Study on the Impact of Electric Vehicles on the Electricity Distribution Network in Cambodia LOI No. : CSET-EDC-CS04-01 The Electricité du Cambodge (EDC) has obtained a grant from the World Bank’s Grant Facility for Project Preparation (GFPP) under the Cambodia Sustainable Energy Transition Project (CSET) and intends to apply part of the proceeds for consulting services. • The Project is designed to support the government’s priorities of strengthening the power grid and energy efficiency, while promoting cost-effective demand-side energy management to ensure energy stability, system resilience, and affordability. • To achieve these outcomes, the proposed Project aims to significantly: (i) strengthen power transmission and distribution infrastructure to increase capacity, enhance reliability; (ii) expand access to modern electricity services in remaining unelectrified rural areas; and (iii) implement energy efficiency and demand-side management measures across industrial and residential sectors. This integrated model reflects the direction outlined in Cambodia’s Revised PDP (2022–2040), NEEP (2022–2030), and broader socio-economic development agenda. By strengthening power infrastructure for VRE integration while improving energy productivity, the proposed Project will reduce system costs, increase new or improved access to energy, and strengthen industrial competitiveness. Doing both investment components together will position Cambodia for a more resilient, export-ready, and energy-secure economy. • The selected Consultant will support Project Preparation Unit of EDC to roll out preparation activities needed for EDC towards project approval by Royal Government of Cambodia (RGC). The Consultant will coordinate with EDC and other concerned government institutions to attain clearance and approval by government as necessary for negotiations, signing of legal agreement, and effectiveness of CSET. The assignment is expected to start in October 2026 with the contract duration of 3 months. • QUALIFICATIONS AND EXPERIENCE The selected National Consultant shall have minimum qualification as follows: • Bachelor's degree in electrical engineering or Master's degree or higher in Electrical Engineering, Power Systems Engineering, Energy Engineering, Transport/Energy Systems, or a closely related field from a recognized university; with at least 8 years of total work experience • At least 5 years of relevant professional experience in power systems, electricity distribution, energy planning, EVs, renewable energy integration, or related fields. • Experience at least 2 projects working with government agencies, utilities, development partners, or international consulting firms will be an advantage. • Experience at least 3 years in preparing technical studies, feasibility studies, investment plans, sector assessments, or policy/strategy documents or in assessing electricity demand, distribution-network impacts, with load forecasting and/or power-system analysis • Knowledge of EV charging technologies and charging behavior and knowledge of power-system analysis software such as DIgSILENT PowerFactory, ETAP, PSS®E or equivalent would be an advantage. • Experience with World Bank or other development-partner-funded projects would be an advantage. • Good communication, reading and writing skills in English • The complete Terms of Reference (TOR) for this assignment are available at the following website: www. edc.com.kh or request to email: ppo.edc.worldbank@gmail.com The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” Sixth Edition, dated February 2025 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest. In addition, please refer to the following specific information on conflict of interest related to this assignment: as per paragraph 3.17 of the Procurement Regulations. • Further information can be obtained at the address below during office hours from 08:00 AM to 12:00 AM and from 02:00 PM to 05:00PM : Attention: Procurement Department Street Address: Electricité du Cambodge St.19, Watt Phnom, Daun Penh District Floor/room number: 2nd Floor, Building B, Procurement Department, EDC Head Office City: Phnom Penh Zip code: 120211 Country: Cambodia Telephone: +855-(0)-23-723-971 Email: ppo.edc.worldbank@gmail.com • Expressions of interest including the information requested above must be delivered to EDC at the address above by no later than September 17th, 2026 before 5:00 PM.

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.