Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

Important stated figures and their meaning
Contract estimate in source metadata; not stated in notice textUSD 900,000,000
Source / meaning
Official record metadata: USD 900,000,000
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Power capacity365.6 MW
Source / meaning
In brief, the development comprises two cascading hydropower generating stations that are near each other (6 km apart), which will have a combined installed capacity of 365.6 MW (i.e., 306 MW and 59.6 MW plants), completed with separate substations and two transmission lines.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Power capacity306 MW
Source / meaning
In brief, the development comprises two cascading hydropower generating stations that are near each other (6 km apart), which will have a combined installed capacity of 365.6 MW (i.e., 306 MW and 59.6 MW plants), completed with separate substations and two transmission lines.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Power capacity59.6 MW
Source / meaning
In brief, the development comprises two cascading hydropower generating stations that are near each other (6 km apart), which will have a combined installed capacity of 365.6 MW (i.e., 306 MW and 59.6 MW plants), completed with separate substations and two transmission lines.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Infrastructure length6 km
Source / meaning
In brief, the development comprises two cascading hydropower generating stations that are near each other (6 km apart), which will have a combined installed capacity of 365.6 MW (i.e., 306 MW and 59.6 MW plants), completed with separate substations and two transmission lines.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Stated figure — see its source contextone (1) an
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Stated figure — see its source contextthree (3) contract
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.
سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
View the official objective and scope excerpt
Mpatamanga Hydropower Storage Project · Request for Proposals · شماره مرجع MW-MHPL-571342-CW-RFP
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Qualification criteria reviewed. Check the latest tender documents before submission.
1

Organisation history and structure

No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.

No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.

2

Technical and managerial capability

5 explicit requirement(s)
Technical and managerial capabilityOfficial notice · High confidence · Shortlisting stage

Minimum qualification requirements and evaluation criteria are stated in the Initial Selection Document, which include among others, eligibility aspects linked to financial capacity, technical capability (among other key criteria); and Target Price.

Source excerpt for this employer criterion
Minimum qualification requirements and evaluation criteria are stated in the Initial Selection Document, which include among others, eligibility aspects linked to financial capacity, technical capability (among other key criteria); and Target Price.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence · Shortlisting stage

- Initial Selection Document will be made available, in electronic format for free, in the Employer’s virtual data room (VDR);

Source excerpt for this employer criterion
- Initial Selection Document will be made available, in electronic format for free, in the Employer’s virtual data room (VDR);
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence · Shortlisting stage

- Applicants will be allowed to gain more information via the VDR, i.e., Initial Selection Document, by first sending an email to the following address: MHSP_PCSA_InitialSelection@mhpl.mw

Source excerpt for this employer criterion
- Applicants will be allowed to gain more information via the VDR, i.e., Initial Selection Document, by first sending an email to the following address: MHSP_PCSA_InitialSelection@mhpl.mw
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence · Shortlisting stage

- A Non-Disclosure Agreement shall be accepted before the first access.

Source excerpt for this employer criterion
- A Non-Disclosure Agreement shall be accepted before the first access.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Other employer criterionOfficial notice · High confidence · Shortlisting stage

- A pre-application meeting will be held on September 17th, 2026 at 1:00 PM (Blantyre, Malawi Time), please use the following link to connect: https://shorturl.at/4vQvO

Stated figures, fees, dimensions or capacity
  • 00 PM
Source excerpt for this employer criterion
- A pre-application meeting will be held on September 17th, 2026 at 1:00 PM (Blantyre, Malawi Time), please use the following link to connect: https://shorturl.at/4vQvO
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
3

Similar experience

1 explicit requirement(s)
Other employer criterionOfficial notice · High confidence · Shortlisting stage

- A Site Visit will be conducted from October 12th to October 15th, 2026 in Blantyre, Malawi and at the Project site. The VDR will open on September 21, 2026. The Application submission deadline is listed in the Initial Selection documents and is scheduled for November 13, 2026. Only electronic submission of applications will be permitted. Late applications will not be accepted.

Source excerpt for this employer criterion
- A Site Visit will be conducted from October 12th to October 15th, 2026 in Blantyre, Malawi and at the Project site. The VDR will open on September 21, 2026. The Application submission deadline is listed in the Initial Selection documents and is scheduled for November 13, 2026. Only electronic submission of applications will be permitted. Late applications will not be accepted.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
4

Key personnel

No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.

No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.

5

Company financial capacity

1 explicit requirement(s)
Financial capacityOfficial notice · High confidence · Shortlisting stage

Minimum qualification requirements and evaluation criteria are stated in the Initial Selection Document, which include among others, eligibility aspects linked to financial capacity, technical capability (among other key criteria); and Target Price.

Source excerpt for this employer criterion
Minimum qualification requirements and evaluation criteria are stated in the Initial Selection Document, which include among others, eligibility aspects linked to financial capacity, technical capability (among other key criteria); and Target Price.
Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.