Integrated Capacity-Building Program on Climate-Smart Agriculture, Digital Extension, and Food Safety Services under GATE
A source-backed decision brief. The official notice and its addenda remain authoritative.
Project objective and employer selection criteria
1. Project objective
The currently available official record does not contain enough source text for a reliable project-objective summary.
Source / meaning
Official record metadata: USD 2,000,000سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Source / meaning
The total Project cost is Two Hundred Million United States Dollars (US$ 200,000,000).سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Source / meaning
• List of ONLY relevant similar projects (maximum 10 projects) as defined in the Terms of References, ongoing and/or completed within the last 10 years, indicating the provided services, the percentage of participation in JV (if any), and the size/value of relevant contracts (in USD and in person-month).سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Source / meaning
• List of ONLY relevant similar projects (maximum 10 projects) as defined in the Terms of References, ongoing and/or completed within the last 10 years, indicating the provided services, the percentage of participation in JV (if any), and the size/value of relevant contracts (in USD and in person-month).سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Source / meaning
متن شاهد این عدد در رکورد فعلی موجود نیست؛ موضوع دقیق از سند رسمی باید احراز شود.سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
Source / meaning
The Main objective of this assignment is to strengthen the capacity of the Ministry of Agriculture’s extension and rural development services, and strengthen market-oriented capacities of farmers and farmers’ groups, support farmers, farmers’ groups, and agricultural cooperatives, including beneficiaries of Climate-Smart Matching Grants under GATE Subcomponent 1.1, to adopt the technical, quality, and organizational practices needed to meet the specifications and standards of off-takers and target markets (target to be agreed).سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
View the official objective and scope excerpt
Lebanon Green Agrifood Transformation for Economic Recovery (GATE) · Quality And Cost-Based Selection · شماره مرجع GC3C1E
Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.
Shortlisting / qualification criteria
Organisation history and structure
1 explicit requirement(s)• Core Business and Years of Experience: The firm should have at least 10 years of experience in preparing and delivering agricultural extension, food safety systems and capacity-building programs, including those funded by the World Bank or other development finance institutions (DFIs).
Source excerpt for this employer criterion
• Core Business and Years of Experience: The firm should have at least 10 years of experience in preparing and delivering agricultural extension, food safety systems and capacity-building programs, including those funded by the World Bank or other development finance institutions (DFIs).Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Technical and managerial capability
No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.
Similar experience
2 explicit requirement(s)• Relevant Project Experience: The firm should demonstrate a successful track record in preparing and delivering climate-smart training, and participatory field-based learning, food safety systems and capacity-building programs.
Source excerpt for this employer criterion
• Relevant Project Experience: The firm should demonstrate a successful track record in preparing and delivering climate-smart training, and participatory field-based learning, food safety systems and capacity-building programs.Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
• Technical and Managerial Capacity: The firm should have a proven capacity to manage complex, multidisciplinary teams and to deliver projects meeting international standards, especially regarding technical quality, cost control, scheduling, risk management including environmental and social risks.
Source excerpt for this employer criterion
• Technical and Managerial Capacity: The firm should have a proven capacity to manage complex, multidisciplinary teams and to deliver projects meeting international standards, especially regarding technical quality, cost control, scheduling, risk management including environmental and social risks.Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Key personnel
No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.
Key experts are not evaluated at the shortlisting stage; this statement alone is not a waiver of CV submission.
Company financial capacity
No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.
Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.
