REOI · Congo - Kinshasa

Contrôle et surveillance des travaux de construction d'un nouveau captage sur le fleuve Congo pour l'usine de N'djili y compris la conduite de refoulement, de la réhabilitation et de la construction du 4ème module de l'usine de N'djili

A source-backed decision brief. The official notice and its addenda remain authoritative.

Open official notice ↗
Submission deadline
Time zone not stated
Country
Congo - Kinshasa
Employer
Cellule d’Exécution des Projets Eau
Notice reference
ZR-CEP-O-572233-CS-QCBS
Procurement / selection method
Quality And Cost-Based Selection
SOURCE-BACKED SCREENING

Project objective and employer selection criteria

1. Project objective

The currently available official record does not contain enough source text for a reliable project-objective summary.

View the official objective and scope excerpt
DRC: Scaling-Up Water Supply and Sanitation Access in Kinshasa Project · Quality And Cost-Based Selection · شماره مرجع ZR-CEP-O-572233-CS-QCBS
No full objective text was available in FANAB's current source record; check the official documents before relying on this summary.

Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.

2

Shortlisting / qualification criteria

Only requirements explicitly found in the available official text are shown.

FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.

Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.