TA-9292 REG: Strengthening Project Preparation Capacity in Asia and the Pacific - Supporting Preparation of Infrastructure Projects with Private Sector Participation in Asia Pacific (Subproject 4) - #1 KGZ: Environment and Safeguards Firm (Wind PPP Project) (E-049407-005)
A source-backed decision brief. The official notice and its addenda remain authoritative.
- Submission deadline
- Country
- چندکشوری
- Employer
- دستگاه اجرایی پروژه تأمینمالیشده توسط ADB
- Notice reference
- E-049407-005
Open the official listing and related documents — Find this assignment by its title, then select View CSRN to read its Profile and Terms of Reference.
Project objective and employer selection criteria
1. Project objective
Background
1.
The Cabinet of Ministers of the Kyrgyz Republic (“Government”) has announced to increase its
generation capacity by over 10% or approximately 400 MW within next five years by undertaking the
development of a grid connected wind power project to diversify its energy mix and increase the
share of renewable energy as outlined in its National Development Strategy (2018-2040).
2.
As part of this, the Government through Ministry of Energy (“MoE”) has signed a Transaction
Advisory Services Agreement (“TASA”) with Asian Development Bank (“ADB”) for undertaking the
development of a grid-connected wind power project expected to be located in the Naryn Region with
a capacity of approximately 100 MW (“Project”) under a Public Private Partnership modality for
international competitive bidding.
3.
The proposed project site is located near Uzunbulak Village in the Kockhor District of Naryn
Region at an average altitude of above +3,000 m spanning across the ridges of Kyzart Pass.
The
coordinates of proposed project site are outlined in the table below (“Project Site”).
4.
ADB as the Transaction Advisor had selected Project Site based on the preliminary screening and
satellite-based wind resource data.
The long-term wind measurement campaign at the proposed project
site has already been initiated and expected to collect necessary meteorological data through a
meteorological mast and LiDAR for a minimum period of 12 months.
Other site-specific studies (such
as geotechnical, topographical, hydrological) and a comprehensive technical and commercial
feasibility study will be conducted in parallel to determine the technical details, such as number
of turbines, type and size of turbines, potential locations for wind turbines, access roads,
interconnection etc.
5.
As part of these project development efforts, to comply with national environmental legislations
in Kyrgyz Republic and international best practices (e.g., ADB Environmental and Social Framework,
IFC Performance Standards, World Bank ESF), a comprehensive Environmental and Social Impact
Assessment (“ESIA”) is required to be conducted in order to identify, predict, evaluate, and manage
potential environmental and social impact throughout the entire lifecycle of the Project.
For this
purpose, ADB as the Transaction Advisor intends to hire a qualified environmental expert with
satisfactory experience in conducting environmental impact assessment studies for renewable energy
projects or other major infrastructure projects in Kyrgyz Republic (“Consultant”).
II.
Objective and Purpose of the Assignment
I.
Objective
6.
The overall objective of this assignment is to undertake an environmental and social assessment
of the impacts with the execution of the Project.
The ESIA will be conducted in accordance with the
relevant laws and policies of Kyrgyz Republic and the international standards and best practices
applicable for the assessment of wind power projects.
It shall ensure all the adverse and positive
environmental and social impacts are considered, analyzed and recommend appropriate mitigation
measures and monitoring and management protocols.
More specific objectives are:
a) To carry out necessary site studies and surveys to collect all primary and secondary data to
establish a robust environmental and social baseline for the Project’s area of influence;
b) To define the project area of influence, and identify and assess potential environmental and
social risks and impacts (including biodiversity, climate, gender and human rights) of the Project
by using internationally acceptable ESIA standards and best practices;
c) To develop and propose technically feasible, cost effective and implementable mitigation
measures and monitoring and management protocols to avoid, mitigate, reduce or manage the
identified risks and impacts;
d) To coordinate and conduct public consultations with all project affected communities and other
stakeholders to make sure they are fully informed about the project;
and
e) To support informed decision making by all stakeholders of the Project including but not limited
to the Government, regulators, private investors, lenders, contractors, and the affected
communities.
Expertise or Positions Needed
International
Team Leadership from International Experts
Expertise or Position Minimum inputs in PM Primary Place of Assignment
1 ESIA Project Manager/ Team Leader 2 Bishkek, Kyrgyzstan Search and Select: Place of Assignment
National
Team Leadership from National Experts
Expertise or Position Minimum inputs in PM Primary Place of Assignment
1 Environmental Specialist 1.25 Bishkek, Kyrgyzstan Search and Select: Place of Assignment
2 Social Expert 2 Bishkek, Kyrgyzstan Search and Select: Place of Assignment
3 Biodiversity and Ecology Specialist 2.5 Bishkek, Kyrgyzstan Search and Select: Place of Assignment
4 Climate Change Specialist 0.5 Bishkek, Kyrgyzstan Search and Select: Place of Assignment
5 Gender Specialist 0.75 Bishkek, Kyrgyzstan Search and Select: Place of Assignment
6 Occupational Health and Safety Specialist 0.5 Bishkek, Kyrgyzstan Search and Select: Place of Assignment
TOR Attachments
Title Type Description Category Last Updated By Last Updated Update Delete
Source / meaning
Consulting Services Budget USD 100,000سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
generation capacity by over 10% or approximately 400 MW within next five years by undertaking theسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
generation capacity by over 10% or approximately 400 MW within next five years by undertaking theسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
a capacity of approximately 100 MW (“Project”) under a Public Private Partnership modality forسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
meteorological mast and LiDAR for a minimum period of 12 months.سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
Specific considerations for this assignment, if any, are discussed here: The assignment is expected to be executed over a maximum period of 4 months (with additional inputs as required).سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
View the official objective and scope excerpt
Background 1. The Cabinet of Ministers of the Kyrgyz Republic (“Government”) has announced to increase its generation capacity by over 10% or approximately 400 MW within next five years by undertaking the development of a grid connected wind power project to diversify its energy mix and increase the share of renewable energy as outlined in its National Development Strategy (2018-2040). 2. As part of this, the Government through Ministry of Energy (“MoE”) has signed a Transaction Advisory Services Agreement (“TASA”) with Asian Development Bank (“ADB”) for undertaking the development of a grid-connected wind power project expected to be located in the Naryn Region with a capacity of approximately 100 MW (“Project”) under a Public Private Partnership modality for international competitive bidding. 3. The proposed project site is located near Uzunbulak Village in the Kockhor District of Naryn Region at an average altitude of above +3,000 m spanning across the ridges of Kyzart Pass. The coordinates of proposed project site are outlined in the table below (“Project Site”). 4. ADB as the Transaction Advisor had selected Project Site based on the preliminary screening and satellite-based wind resource data. The long-term wind measurement campaign at the proposed project site has already been initiated and expected to collect necessary meteorological data through a meteorological mast and LiDAR for a minimum period of 12 months. Other site-specific studies (such as geotechnical, topographical, hydrological) and a comprehensive technical and commercial feasibility study will be conducted in parallel to determine the technical details, such as number of turbines, type and size of turbines, potential locations for wind turbines, access roads, interconnection etc. 5. As part of these project development efforts, to comply with national environmental legislations in Kyrgyz Republic and international best practices (e.g., ADB Environmental and Social Framework, IFC Performance Standards, World Bank ESF), a comprehensive Environmental and Social Impact Assessment (“ESIA”) is required to be conducted in order to identify, predict, evaluate, and manage potential environmental and social impact throughout the entire lifecycle of the Project. For this purpose, ADB as the Transaction Advisor intends to hire a qualified environmental expert with satisfactory experience in conducting environmental impact assessment studies for renewable energy projects or other major infrastructure projects in Kyrgyz Republic (“Consultant”). II. Objective and Purpose of the Assignment I. Objective 6. The overall objective of this assignment is to undertake an environmental and social assessment of the impacts with the execution of the Project. The ESIA will be conducted in accordance with the relevant laws and policies of Kyrgyz Republic and the international standards and best practices applicable for the assessment of wind power projects. It shall ensure all the adverse and positive environmental and social impacts are considered, analyzed and recommend appropriate mitigation measures and monitoring and management protocols. More specific objectives are: a) To carry out necessary site studies and surveys to collect all primary and secondary data to establish a robust environmental and social baseline for the Project’s area of influence; b) To define the project area of influence, and identify and assess potential environmental and social risks and impacts (including biodiversity, climate, gender and human rights) of the Project by using internationally acceptable ESIA standards and best practices; c) To develop and propose technically feasible, cost effective and implementable mitigation measures and monitoring and management protocols to avoid, mitigate, reduce or manage the identified risks and impacts; d) To coordinate and conduct public consultations with all project affected communities and other stakeholders to make sure they are fully informed about the project; and e) To support informed decision making by all stakeholders of the Project including but not limited to the Government, regulators, private investors, lenders, contractors, and the affected communities. Expertise or Positions Needed International Team Leadership from International Experts Expertise or Position Minimum inputs in PM Primary Place of Assignment 1 ESIA Project Manager/ Team Leader 2 Bishkek, Kyrgyzstan Search and Select: Place of Assignment National Team Leadership from National Experts Expertise or Position Minimum inputs in PM Primary Place of Assignment 1 Environmental Specialist 1.25 Bishkek, Kyrgyzstan Search and Select: Place of Assignment 2 Social Expert 2 Bishkek, Kyrgyzstan Search and Select: Place of Assignment 3 Biodiversity and Ecology Specialist 2.5 Bishkek, Kyrgyzstan Search and Select: Place of Assignment 4 Climate Change Specialist 0.5 Bishkek, Kyrgyzstan Search and Select: Place of Assignment 5 Gender Specialist 0.75 Bishkek, Kyrgyzstan Search and Select: Place of Assignment 6 Occupational Health and Safety Specialist 0.5 Bishkek, Kyrgyzstan Search and Select: Place of Assignment TOR Attachments Title Type Description Category Last Updated By Last Updated Update Delete
Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.
Shortlisting / qualification criteria
FANAB could not access enough official text to extract this category reliably. Open the official notice and tender documents before making a qualification decision.
Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.