GRANT-0361 NEP: Project Preparatory Facility for Energy - E4 Risk Analyst for QRA and SRA of Dudhkoshi SHEP (E-047036-001)
A source-backed decision brief. The official notice and its addenda remain authoritative.
- Submission deadline
- Country
- Nepal
- Employer
- دستگاه اجرایی پروژه تأمینمالیشده توسط ADB
- Notice reference
- E-047036-001
Open the official listing and related documents — Find this assignment by its title, then select View CSRN to read its Profile and Terms of Reference.
Project objective and employer selection criteria
1. Project objective
Objective and Purpose of the Assignment
Dudhkoshi Storage Hydroelectric Project (DKSHEP) is a proposed 670 MW storage hydropower project to be
developed on the Dudhkoshi River in eastern Nepal between the boundaries of Okhaldhunga and Khotang
Districts.
Nepal Electricity Authority (NEA) had employed ELC Electroconsult S.p.A. (Italy), in
association with NEWJEC Inc. (Japan), to carry out the “Updated Feasibility Study and Detailed Design of
Dudhkoshi Storage Hydroelectric Project” under grant assistance from Asian Development Bank (ADB).
The main 600 MW powerhouse will be an underground facility on the left bank of the Sunkoshi River and 70
MW Dam-Toe powerhouse, also underground, will generate energy from environmental flow release and is
proposed on the right bank of the Dudhkoshi River.
A 220-meter-high concrete-faced rock-fill dam (CFRD)
will create a 31.5-kilometer-long reservoir with a capacity of 1,581 Mm3.
The dam site is located
approximately 210 kilometers east of Kathmandu by road.
For the main 600 MW powerhouse, a natural head of 132 meters will be available from a 13.15-kilometerlong main water tunnel, supplemented by an additional 210-meter artificial head from the reservoir.
The
main Head Race Tunnel is planned to be constructed by using Tunnel Boring Machine (TBM).
The design
discharge for the main powerhouse is 224.4 m3/s.
The Dam-Toe Powerhouse is designed to operate with a
rated head of 182 meters and a design discharge of 40 m³/s.
The construction lots are categorized as follows: Lot 1 (Dam, Intake, and Spillway with Hydraulic Steel
Equipment) and Lot 2 (Main Tunnel and Power House with Hydraulic Steel Equipment) both follow the FIDIC
Conditions of Contract for Underground Works, (Emerald Book, 2019) contract model while Lot 3 (Electromechanical Works) will follow the FIDIC Conditions of Contract for Plant and Design Build (Yellow Book,
2017) model.
DKSHEP is being developed through a Special Purpose Vehicle (SPV) with financing structured through a
blended approach, which integrates an optimal mix of concessional and commercial loans from both
international and domestic lenders, and a direct equity component, with equity participation contributed
by the Government of Nepal (GoN), NEA and its other entities and shareholders.
The Project is progressing towards readiness from technical, financial, environmental and social and
power markets perspectives with the aim of achieving financial close by October 2026.
The Project SPV –
Dudhkoshi Jalvidyut Company Ltd. (DKJVCL) – has been set up with a Board and a core executive team.
This
SPV needs to work closely with NEA, Ministry of Energy, Water Resources and Irrigation (MoEWRI),
Ministry of Finance (MoF), Asian Development Bank (ADB) and other stakeholders towards completing these
activities in time and with the quality required for development of projects of this scale.
DKSHEP is now looking at engaging a Construction Expert - Risk Analyst (CE-RA) to coordinate and conduct
Quantitative Risk Assessment (QRA) and Schedule Risk Assessment (SRA) for the Project to provide
information on risks of various activities in construction quantities and schedule and determine the
level of contingencies to be incorporated in the cost and schedule of the Project.
This input will be
vital to the Chief Executive Officer (CEO) of DKJVCL and his management team for finalizing the project
valuation, financing, and construction management issues at DKSHEP.
Scope of Work
CE-RA will work together with a Construction Expert – Engineering Geologist (CE-EG) and Construction
Expert – Construction Management & Contracts (CE-CMC).
CE-RA shall be responsible to conduct required
studies, review project engineering documents, discuss with Project team, Consultant and other experts,
to determine potential variation in estimate of quantities and construction schedule from a construction
perspective including TBM related risks.
To ensure a unified assessment of site conditions, the CE-RA
shall conduct the site visit concurrently and in close coordination with the CE-EG and CE-CMC;
however,
the specific duration of each expert’s field presence may be adjusted according to their individual
technical responsibilities.
CE-RA will discuss and finalize relevant inputs with the CE-EG and CE-CMC in
finalizing inputs to the QRA and SRA models on quantity and schedule variations for probabilistic
assessments.
These inputs shall be discussed and finalized in a workshop that will be led by the CE-RA
and shall be conducted at the Project Office together with CE-EG, CE-CMC, Project Team and Consultants.
Once inputs to the QRA and SRA models are finalized, RA will conduct the QRA and SRA and come up with
risk estimates on quantity, schedule and to project cost.
The CE-RA shall share technical expertise and knowledge through meetings, consultations and field
visits.
The CE-RA shall document the results of each of its visits including the overall conclusions and
recommendations.
The expert shall maintain the confidentiality of all confidential information which
shall not be disclosed to any third parties without the written consent of DKSHEP.
The essential details of the Project for this assignment;
reports and other details will be provided to
the selected consultant.
Detailed Tasks and/or Expected Output
The detailed tasks and responsibilities for the CE-RA shall include, but will not be limited to the
following works:
1.
Review of Project reports regarding risk assessment, scheduling, cost estimate, calculation of
contingencies, etc.
The contractual risks arising from TBM in HRT construction, as governed by the FIDIC
Emerald Book, shall also be analyzed.
2.
Prerequisites for QRA and SRA will include preparation of:
a.
Cost Estimates grouped in standard Work Breakdown Structure (WBS), if not already available;
b.
Baseline Master Plan organized according to the WBS.
Start/Finish, Critical Path;
c.
Project’s monthly cost of delay;
d.
Estimated income, distributed per month;
e.
Qualitative Risk Assessment;
f.
Reference projects;
g.
Value Engineering (if performed)
h.
Risk Register
i.
Risk Management Plan
3.
Adjust the standard WBS to the Project;
4.
An estimated time-schedule corresponding with the WBS above.
5.
Lead the QRA & SRA Workshop
6.
Enter Planned Cost based on best possible estimates.
These are to be referred as PROBABLE values.
Define Optimistic and Pessimistic values on each cost - and time activity.
These are referred to as
WORST-CASE and BEST-CASE values.
7.
Take notes during the Workshop and document the discussion points.
Define action points for how to
reduce the identified risks.
8.
Prepare and Review the Tornado diagram and Cumulative-curve.
9.
Define the Contingency (the difference between the estimate and P70) based on Quantitative Risks.
10.
Conduct similar exercise for Schedule Risks.
11.
Combine Quantitative and Schedule Risks to determine contingencies and revenue loss.
12.
Provide training to the Project team on the industry-standard software utilized for QRA and SRA, as
well as the interpretation of its outputs, if required by DKSHEP
13.
Provide reports on QRA and SRA reports.
With particular reference to pandemic disease outbreaks, any need for international and/or national
travel shall be assessed by DKSHEP and the Consultant using DKSHEP's advice at the time of travel.
Subject to DKSHEP's approval, the Consultant may use remote video technology meetings to replace face to
face meetings as considered necessary.
Minimum Qualification Requirements
The CE- RA shall have the following minimum Qualification and Experience:
1.
Master’s degree or equivalent in Risk Management;
2.
At least 15 years General Experience in Hydropower Project (Project Identification, Project
Development, Construction Management, Operation and Maintenance)
3.
Experience in Construction of at least one hydropower projects with underground structures with
installed capacity of 300 MW or above
4.
Experience in Risk Assessment including QRA & SRA of at least one hydropower projects with installed
capacity of 300 MW or above.
5.
At least 7 Years International Experience (other than Home Country) in Risk Assessment of
Hydroelectric Projects
6.
Experience in Risk Assessment of at least one hydropower projects with installed capacity of 100 MW
or above in Himalayan Geology (Nepal, Pakistan, Bhutan, India, Myanmar, Afghanistan).
Minimum General Experience 15
Years
Minimum Specific Experience (relevant to assignment) 0.17
Years
Regional/Country Experience Required
Desired
Not Required
Deliverables
Details Name Type Estimated Submission Date
Inception Report after the Site Visit and QRA & SRA Workshop.
Report
QRA and SRA reports with cost and schedule estimates for base case,best-case and worst-casescenarios Report
Recommendations for industry-standard software to be used during construction.
Report
Schedule and Places of Assignment (chronological and inclusive of travel)
Schedule Type Continuous
Intermittent
Max.
Working Days/Week Home Office 5
Field 5
City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others)
Kathmandu, Nepal Search and Select: Place
10 16-Nov-2026 27-Nov-2026 Travel to Project Site on project related matter is required.
Home Office, Other Search and Select: Place
44 28-Nov-2026 28-Jan-2027
Kathmandu, Nepal Search and Select: Place
12 29-Jan-2027 15-Feb-2027 Travel to Project Site on project related matter is required.
Total
66
Export to PDF
Export to PDF
Copyright (c) 1998, 2023, Oracle and/or its affiliates.
All rights reserved.
Copyright (c) 1998, 2023, Oracle and/or its affiliates.
All rights reserved.
Pick a Date
Loading...
Loading...
Scope of services
CE-RA will work together with a Construction Expert – Engineering Geologist (CE-EG) and Construction Expert – Construction Management & Contracts (CE-CMC). CE-RA shall be responsible to conduct required studies, review project engineering documents, discuss with Project team, Consultant and other experts, to determine potential variation in estimate of quantities and construction schedule from a construction perspective including TBM related risks. To ensure a unified assessment of site conditions, the CE-RA shall conduct the site visit concurrently and in close coordination with the CE-EG and CE-CMC; however, the specific duration of each expert’s field presence may be adjusted according to their individual technical responsibilities. CE-RA will discuss and finalize relevant inputs with the CE-EG and CE-CMC in finalizing inputs to the QRA and SRA models on quantity and schedule variations for probabilistic assessments. These inputs shall be discussed and finalized in a workshop that will be led by the CE-RA and shall be conducted at the Project Office together with CE-EG, CE-CMC, Project Team and Consultants. Once inputs to the QRA and SRA models are finalized, RA will conduct the QRA and SRA and come up with risk estimates on quantity, schedule and to project cost. The CE-RA shall share technical expertise and knowledge through meetings, consultations and field visits. The CE-RA shall document the results of each of its visits including the overall conclusions and recommendations. The expert shall maintain the confidentiality of all confidential information which shall not be disclosed to any third parties without the written consent of DKSHEP. The essential details of the Project for this assignment; reports and other details will be provided to the selected consultant. Detailed Tasks and/or Expected Output The detailed tasks and responsibilities for the CE-RA shall include, but will not be limited to the following works: 1. Review of Project reports regarding risk assessment, scheduling, cost estimate, calculation of contingencies, etc. The contractual risks arising from TBM in HRT construction, as governed by the FIDIC Emerald Book, shall also be analyzed. 2. Prerequisites for QRA and SRA will include preparation of: a. Cost Estimates grouped in standard Work Breakdown Structure (WBS), if not already available; b. Baseline Master Plan organized according to the WBS. Start/Finish, Critical Path; c. Project’s monthly cost of delay; d. Estimated income, distributed per month; e. Qualitative Risk Assessment; f. Reference projects; g. Value Engineering (if performed) h. Risk Register i. Risk Management Plan 3. Adjust the standard WBS to the Project; 4. An estimated time-schedule corresponding with the WBS above. 5. Lead the QRA & SRA Workshop 6. Enter Planned Cost based on best possible estimates. These are to be referred as PROBABLE values. Define Optimistic and Pessimistic values on each cost - and time activity. These are referred to as WORST-CASE and BEST-CASE values. 7. Take notes during the Workshop and document the discussion points. Define action points for how to reduce the identified risks. 8. Prepare and Review the Tornado diagram and Cumulative-curve. 9. Define the Contingency (the difference between the estimate and P70) based on Quantitative Risks. 10. Conduct similar exercise for Schedule Risks. 11. Combine Quantitative and Schedule Risks to determine contingencies and revenue loss. 12. Provide training to the Project team on the industry-standard software utilized for QRA and SRA, as well as the interpretation of its outputs, if required by DKSHEP 13. Provide reports on QRA and SRA reports. With particular reference to pandemic disease outbreaks, any need for international and/or national travel shall be assessed by DKSHEP and the Consultant using DKSHEP's advice at the time of travel. Subject to DKSHEP's approval, the Consultant may use remote video technology meetings to replace face to face meetings as considered necessary. Minimum Qualification Requirements The CE- RA shall have the following minimum Qualification and Experience: 1. Master’s degree or equivalent in Risk Management; 2. At least 15 years General Experience in Hydropower Project (Project Identification, Project Development, Construction Management, Operation and Maintenance) 3. Experience in Construction of at least one hydropower projects with underground structures with installed capacity of 300 MW or above 4. Experience in Risk Assessment including QRA & SRA of at least one hydropower projects with installed capacity of 300 MW or above. 5. At least 7 Years International Experience (other than Home Country) in Risk Assessment of Hydroelectric Projects 6. Experience in Risk Assessment of at least one hydropower projects with installed capacity of 100 MW or above in Himalayan Geology (Nepal, Pakistan, Bhutan, India, Myanmar, Afghanistan). Minimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 0.17 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Inception Report after the Site Visit and QRA & SRA Workshop. Report QRA and SRA reports with cost and schedule estimates for base case,best-case and worst-casescenarios Report Recommendations for industry-standard software to be used during construction. Report Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 5 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Kathmandu, Nepal Search and Select: Place 10 16-Nov-2026 27-Nov-2026 Travel to Project Site on project related matter is required. Home Office, Other Search and Select: Place 44 28-Nov-2026 28-Jan-2027 Kathmandu, Nepal Search and Select: Place 12 29-Jan-2027 15-Feb-2027 Travel to Project Site on project related matter is required. Total 66 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Pick a Date Loading... Loading...
Exact source section
CE-RA will work together with a Construction Expert – Engineering Geologist (CE-EG) and Construction Expert – Construction Management & Contracts (CE-CMC). CE-RA shall be responsible to conduct required studies, review project engineering documents, discuss with Project team, Consultant and other experts, to determine potential variation in estimate of quantities and construction schedule from a construction perspective including TBM related risks. To ensure a unified assessment of site conditions, the CE-RA shall conduct the site visit concurrently and in close coordination with the CE-EG and CE-CMC; however, the specific duration of each expert’s field presence may be adjusted according to their individual technical responsibilities. CE-RA will discuss and finalize relevant inputs with the CE-EG and CE-CMC in finalizing inputs to the QRA and SRA models on quantity and schedule variations for probabilistic assessments. These inputs shall be discussed and finalized in a workshop that will be led by the CE-RA and shall be conducted at the Project Office together with CE-EG, CE-CMC, Project Team and Consultants. Once inputs to the QRA and SRA models are finalized, RA will conduct the QRA and SRA and come up with risk estimates on quantity, schedule and to project cost. The CE-RA shall share technical expertise and knowledge through meetings, consultations and field visits. The CE-RA shall document the results of each of its visits including the overall conclusions and recommendations. The expert shall maintain the confidentiality of all confidential information which shall not be disclosed to any third parties without the written consent of DKSHEP. The essential details of the Project for this assignment; reports and other details will be provided to the selected consultant. Detailed Tasks and/or Expected Output The detailed tasks and responsibilities for the CE-RA shall include, but will not be limited to the following works: 1. Review of Project reports regarding risk assessment, scheduling, cost estimate, calculation of contingencies, etc. The contractual risks arising from TBM in HRT construction, as governed by the FIDIC Emerald Book, shall also be analyzed. 2. Prerequisites for QRA and SRA will include preparation of: a. Cost Estimates grouped in standard Work Breakdown Structure (WBS), if not already available; b. Baseline Master Plan organized according to the WBS. Start/Finish, Critical Path; c. Project’s monthly cost of delay; d. Estimated income, distributed per month; e. Qualitative Risk Assessment; f. Reference projects; g. Value Engineering (if performed) h. Risk Register i. Risk Management Plan 3. Adjust the standard WBS to the Project; 4. An estimated time-schedule corresponding with the WBS above. 5. Lead the QRA & SRA Workshop 6. Enter Planned Cost based on best possible estimates. These are to be referred as PROBABLE values. Define Optimistic and Pessimistic values on each cost - and time activity. These are referred to as WORST-CASE and BEST-CASE values. 7. Take notes during the Workshop and document the discussion points. Define action points for how to reduce the identified risks. 8. Prepare and Review the Tornado diagram and Cumulative-curve. 9. Define the Contingency (the difference between the estimate and P70) based on Quantitative Risks. 10. Conduct similar exercise for Schedule Risks. 11. Combine Quantitative and Schedule Risks to determine contingencies and revenue loss. 12. Provide training to the Project team on the industry-standard software utilized for QRA and SRA, as well as the interpretation of its outputs, if required by DKSHEP 13. Provide reports on QRA and SRA reports. With particular reference to pandemic disease outbreaks, any need for international and/or national travel shall be assessed by DKSHEP and the Consultant using DKSHEP's advice at the time of travel. Subject to DKSHEP's approval, the Consultant may use remote video technology meetings to replace face to face meetings as considered necessary. Minimum Qualification Requirements The CE- RA shall have the following minimum Qualification and Experience: 1. Master’s degree or equivalent in Risk Management; 2. At least 15 years General Experience in Hydropower Project (Project Identification, Project Development, Construction Management, Operation and Maintenance) 3. Experience in Construction of at least one hydropower projects with underground structures with installed capacity of 300 MW or above 4. Experience in Risk Assessment including QRA & SRA of at least one hydropower projects with installed capacity of 300 MW or above. 5. At least 7 Years International Experience (other than Home Country) in Risk Assessment of Hydroelectric Projects 6. Experience in Risk Assessment of at least one hydropower projects with installed capacity of 100 MW or above in Himalayan Geology (Nepal, Pakistan, Bhutan, India, Myanmar, Afghanistan). Minimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 0.17 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Inception Report after the Site Visit and QRA & SRA Workshop. Report QRA and SRA reports with cost and schedule estimates for base case,best-case and worst-casescenarios Report Recommendations for industry-standard software to be used during construction. Report Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 5 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Kathmandu, Nepal Search and Select: Place 10 16-Nov-2026 27-Nov-2026 Travel to Project Site on project related matter is required. Home Office, Other Search and Select: Place 44 28-Nov-2026 28-Jan-2027 Kathmandu, Nepal Search and Select: Place 12 29-Jan-2027 15-Feb-2027 Travel to Project Site on project related matter is required. Total 66 Export to PDF Export to PDF Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Copyright (c) 1998, 2023, Oracle and/or its affiliates. All rights reserved. Pick a Date Loading... Loading...
Source / meaning
Consulting Services Budget USD 90,390سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
Dudhkoshi Storage Hydroelectric Project (DKSHEP) is a proposed 670 MW storage hydropower project to beسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
The main 600 MW powerhouse will be an underground facility on the left bank of the Sunkoshi River and 70سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
For the main 600 MW powerhouse, a natural head of 132 meters will be available from a 13.15-kilometerlong main water tunnel, supplemented by an additional 210-meter artificial head from the reservoir.سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
discharge for the main powerhouse is 224.4 m3/s.سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
rated head of 182 meters and a design discharge of 40 m³سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
At least 15 years General Experience in Hydropower Project (Project Identification, Projectسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
installed capacity of 300 MW or aboveسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
At least 7 Years International Experience (other than Home Country) in Risk Assessment ofسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
Experience in Risk Assessment of at least one hydropower projects with installed capacity of 100 MWسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
The construction lots are categorized as follows: Lot 1 (Dam, Intake, and Spillway with Hydraulic Steelسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
Equipment) and Lot 2 (Main Tunnel and Power House with Hydraulic Steel Equipment) both follow the FIDICسامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Source / meaning
Conditions of Contract for Underground Works, (Emerald Book, 2019) contract model while Lot 3 (Electromechanical Works) will follow the FIDIC Conditions of Contract for Plant and Design Build (Yellow Book,سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — official notice / tender document
Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.
Shortlisting / qualification criteria
A — Organizational experience and structure
1. Master’s degree or equivalent in Risk Management;
Shortlisting stage2. At least 15 years General Experience in Hydropower Project (Project Identification, Project Development, Construction Management, Operation and Maintenance)
Shortlisting stageMinimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 0.17 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Inception Report after the Site Visit and QRA & SRA Workshop. Report QRA and SRA reports with cost and schedule estimates for base case,best-case and worst-casescenarios Report Recommendations for industry-standard software to be used during construction. Report Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 5 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Kathmandu, Nepal Search and Select: Place 10 16-Nov-2026 27-Nov-2026 Travel to Project Site on project related matter is required. Home Office, Other Search and Select: Place 44 28-Nov-2026 28-Jan-2027 Kathmandu, Nepal Search and Select: Place 12 29-Jan-2027 15-Feb-2027 Travel to Project Site on project related matter is required.
Shortlisting stage
Source clauses for this group
1. Master’s degree or equivalent in Risk Management;
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria2. At least 15 years General Experience in Hydropower Project (Project Identification, Project Development, Construction Management, Operation and Maintenance)
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteriaMinimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 0.17 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Inception Report after the Site Visit and QRA & SRA Workshop. Report QRA and SRA reports with cost and schedule estimates for base case,best-case and worst-casescenarios Report Recommendations for industry-standard software to be used during construction. Report Schedule and Places of Assignment (chronological and inclusive of travel) Schedule Type Continuous Intermittent Max. Working Days/Week Home Office 5 Field 5 City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others) Kathmandu, Nepal Search and Select: Place 10 16-Nov-2026 27-Nov-2026 Travel to Project Site on project related matter is required. Home Office, Other Search and Select: Place 44 28-Nov-2026 28-Jan-2027 Kathmandu, Nepal Search and Select: Place 12 29-Jan-2027 15-Feb-2027 Travel to Project Site on project related matter is required.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria
C — Similar assignments
The CE- RA shall have the following minimum Qualification and Experience:
Shortlisting stage3. Experience in Construction of at least one hydropower projects with underground structures with installed capacity of 300 MW or above
Shortlisting stage4. Experience in Risk Assessment including QRA & SRA of at least one hydropower projects with installed capacity of 300 MW or above.
Shortlisting stage5. At least 7 Years International Experience (other than Home Country) in Risk Assessment of Hydroelectric Projects
Shortlisting stage6. Experience in Risk Assessment of at least one hydropower projects with installed capacity of 100 MW or above in Himalayan Geology (Nepal, Pakistan, Bhutan, India, Myanmar, Afghanistan).
Shortlisting stageMinimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 0.17 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Inception Report after the Site Visit and QRA & SRA Workshop.
Shortlisting stage
Source clauses for this group
The CE- RA shall have the following minimum Qualification and Experience:
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria3. Experience in Construction of at least one hydropower projects with underground structures with installed capacity of 300 MW or above
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria4. Experience in Risk Assessment including QRA & SRA of at least one hydropower projects with installed capacity of 300 MW or above.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria5. At least 7 Years International Experience (other than Home Country) in Risk Assessment of Hydroelectric Projects
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria6. Experience in Risk Assessment of at least one hydropower projects with installed capacity of 100 MW or above in Himalayan Geology (Nepal, Pakistan, Bhutan, India, Myanmar, Afghanistan).
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteriaMinimum General Experience 15 Years Minimum Specific Experience (relevant to assignment) 0.17 Years Regional/Country Experience Required Desired Not Required Deliverables Details Name Type Estimated Submission Date Inception Report after the Site Visit and QRA & SRA Workshop.
Shortlisting stage · سامانه رسمی فرصتهای مشاورهای ADB (CMS/CSRN) — shortlisting / qualification criteria
Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.