COCIP/Etude de cadrage & faisabilité technique et développement d’un écosystème numérique intégré (Web, Mobile et Réseaux Sociaux) d’engagement citoyen.
A source-backed decision brief. The official notice and its addenda remain authoritative.
Project objective and employer selection criteria
1. Project objective
The currently available official record does not contain enough source text for a reliable project-objective summary.
Source / meaning
Official record metadata: USD 300,000سامانه رسمی مناقصات تدارکاتی بانک جهانی — official notice / tender document
View the official objective and scope excerpt
Haiti Strengthening Public Financial Management Project · Quality And Cost-Based Selection · شماره مرجع HT-UCP/MEF-551596-CS-QCBS
Extraction covers only the accessible source. Linked TORs and later addenda are not verified unless their text has been retrieved; a missing field never means no requirement.
Shortlisting / qualification criteria
Organisation history and structure
No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.
Technical and managerial capability
26 explicit requirement(s)• leurs expériences pertinentes pour cette mission. Des références clients pourront en attester ;
Source excerpt for this employer criterion
• leurs expériences pertinentes pour cette mission. Des références clients pourront en attester ;Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
• leurs capacités techniques et managériales ;
Source excerpt for this employer criterion
• leurs capacités techniques et managériales ;Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
• leurs qualifications et leur disponibilité (CV détaillés inutiles) pour cette étape.
Source excerpt for this employer criterion
• leurs qualifications et leur disponibilité (CV détaillés inutiles) pour cette étape.Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
6. Seuls les consultants retenus sur la liste restreinte recevront les Dossiers de Demande de Proposition (DDP)
Source excerpt for this employer criterion
6. Seuls les consultants retenus sur la liste restreinte recevront les Dossiers de Demande de Proposition (DDP)Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
7. L’étape ultime du processus sera le choix d’un.e consultant.e selon la méthode de Sélection Basee sur la Qualite et le Cout (QCBS), telle que décrite dans le Règlement de Passation de marché de la Banque d’après les Versions révisées de Février 2025 et Septembre 2025.
Source excerpt for this employer criterion
7. L’étape ultime du processus sera le choix d’un.e consultant.e selon la méthode de Sélection Basee sur la Qualite et le Cout (QCBS), telle que décrite dans le Règlement de Passation de marché de la Banque d’après les Versions révisées de Février 2025 et Septembre 2025.Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
8. Les manifestations d’intérêt, en français, doivent être transmises par courrier électronique au plus tard le vendredi 2 octobre 2026 à 2 H 00 PM heure d’Haiti, aux adresses électroniques suivantes : ucp.secretariat@mef.gouv.ht; frantzbenoit@yahoo.fr et lys_faucher@yahoo.fr __________________ P.J. Les Termes de Référence. République d’Haïti Ministère de l’Économie et des Finances (MEF) Unité de Coordination de Projets (UCP) Projet de Renforcement de la Gestion des Finances Publiques (PReGeFIP - P180384) Financement : Don IDA E 4170 Recrutement d’un(e) Firme de consultation(e) pour l’élaboration d’une étude de cadrage & faisabilité technique et le développement d’un écosystème numérique intégré (Web, Mobile et Réseaux Sociaux) d’engagement citoyen No Référence : HT-UCP/MEF-551596-CS-QCBS TERMES DE REFERENCE (TDR) Avril 2026 TABLES DES MATIÈRES
- 00 PM
Source excerpt for this employer criterion
8. Les manifestations d’intérêt, en français, doivent être transmises par courrier électronique au plus tard le vendredi 2 octobre 2026 à 2 H 00 PM heure d’Haiti, aux adresses électroniques suivantes : ucp.secretariat@mef.gouv.ht; frantzbenoit@yahoo.fr et lys_faucher@yahoo.fr __________________ P.J. Les Termes de Référence. République d’Haïti Ministère de l’Économie et des Finances (MEF) Unité de Coordination de Projets (UCP) Projet de Renforcement de la Gestion des Finances Publiques (PReGeFIP - P180384) Financement : Don IDA E 4170 Recrutement d’un(e) Firme de consultation(e) pour l’élaboration d’une étude de cadrage & faisabilité technique et le développement d’un écosystème numérique intégré (Web, Mobile et Réseaux Sociaux) d’engagement citoyen No Référence : HT-UCP/MEF-551596-CS-QCBS TERMES DE REFERENCE (TDR) Avril 2026 TABLES DES MATIÈRESSource location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
I. CONTEXTE ET JUSTIFICATION................................................................................................................... 4
Source excerpt for this employer criterion
I. CONTEXTE ET JUSTIFICATION................................................................................................................... 4Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
II. OBJECTIF GÉNÉRAL.................................................................................................................................... 5 2.1. Objectifs spécifiques................................................................................................................................... 5
Source excerpt for this employer criterion
II. OBJECTIF GÉNÉRAL.................................................................................................................................... 5 2.1. Objectifs spécifiques................................................................................................................................... 5Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
III. ANCRAGE INSTITUTIONNEL ET GOUVERNANCE................................................................................. 6 3.1. Partenaires institutionnels clés et points d'ancrage......................................................................................... 7 3.2. Gouvernance des données et interopérabilité................................................................................................ 7 3.3. Stratégie de pérennité et financement Post-PReGeFiP................................................................................... 8
Source excerpt for this employer criterion
III. ANCRAGE INSTITUTIONNEL ET GOUVERNANCE................................................................................. 6 3.1. Partenaires institutionnels clés et points d'ancrage......................................................................................... 7 3.2. Gouvernance des données et interopérabilité................................................................................................ 7 3.3. Stratégie de pérennité et financement Post-PReGeFiP................................................................................... 8Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
IV. CIBLES DE L’ACTIVITÉ............................................................................................................................... 8
Source excerpt for this employer criterion
IV. CIBLES DE L’ACTIVITÉ............................................................................................................................... 8Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
V. COMPOSANTES DE LA PLATEFORME....................................................................................................... 9 5.1. Le noyau central : Écosystème web & services de données............................................................................ 9
Source excerpt for this employer criterion
V. COMPOSANTES DE LA PLATEFORME....................................................................................................... 9 5.1. Le noyau central : Écosystème web & services de données............................................................................ 9Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
A. Module de Visualisation (DataViz) & Transparence :............................................................................. 9
Source excerpt for this employer criterion
A. Module de Visualisation (DataViz) & Transparence :............................................................................. 9Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
B. Assistant Virtuel Intelligent (IA Pédagogique) :...................................................................................... 9
Source excerpt for this employer criterion
B. Assistant Virtuel Intelligent (IA Pédagogique) :...................................................................................... 9Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
C. Centre de Redevabilité et Boucle de Rétroaction (Feedback Loop) :........................................................ 9 5.2. L'extension mobile : Accessibilité et Proximité........................................................................................... 10 5.3. L'écosystème médias sociaux : connectivité et viralité................................................................................. 10
Source excerpt for this employer criterion
C. Centre de Redevabilité et Boucle de Rétroaction (Feedback Loop) :........................................................ 9 5.2. L'extension mobile : Accessibilité et Proximité........................................................................................... 10 5.3. L'écosystème médias sociaux : connectivité et viralité................................................................................. 10Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
A. Déploiement stratégique par plateforme................................................................................................. 10
Source excerpt for this employer criterion
A. Déploiement stratégique par plateforme................................................................................................. 10Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
B. Formats de Contenus et Ligne Éditoriale................................................................................................ 10
Source excerpt for this employer criterion
B. Formats de Contenus et Ligne Éditoriale................................................................................................ 10Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
VI. MÉTHODOLOGIE ET STRATÉGIE DE MISE EN ŒUVRE...................................................................... 11 Phase 1 : Cadrage stratégique, faisabilité et analyse comparative........................................................................ 11 Phase 2 : Design centré utilisateur (UX/UI) et co-création continue.................................................................... 11 Phase 3 : Développement Agile et Intégration de l’IA........................................................................................ 12 Phase 4 : Tests de qualité, sécurisation et pilotage.............................................................................................. 12 Phase 5 : Lancement et communication multicanale.......................................................................................... 12 Phase 6 : Formation, transfert de compétences et pérennisation.......................................................................... 12
- Phase 1
- Phase 2
- Phase 3
- Phase 4
- Phase 5
- Phase 6
Source excerpt for this employer criterion
VI. MÉTHODOLOGIE ET STRATÉGIE DE MISE EN ŒUVRE...................................................................... 11 Phase 1 : Cadrage stratégique, faisabilité et analyse comparative........................................................................ 11 Phase 2 : Design centré utilisateur (UX/UI) et co-création continue.................................................................... 11 Phase 3 : Développement Agile et Intégration de l’IA........................................................................................ 12 Phase 4 : Tests de qualité, sécurisation et pilotage.............................................................................................. 12 Phase 5 : Lancement et communication multicanale.......................................................................................... 12 Phase 6 : Formation, transfert de compétences et pérennisation.......................................................................... 12Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
VII. OUTILS TECHNOLOGIQUES................................................................................................................... 13 7.1. Développement Web et Gestion de Contenu (CMS).................................................................................... 13 7.2. Intelligence Artificielle (AI Assistant)........................................................................................................ 13 7.3. Analyse de Données et Engagement........................................................................................................... 13 7.4. Interaction et Collecte de Feedback............................................................................................................ 13 7.5.
Source excerpt for this employer criterion
VII. OUTILS TECHNOLOGIQUES................................................................................................................... 13 7.1. Développement Web et Gestion de Contenu (CMS).................................................................................... 13 7.2. Intelligence Artificielle (AI Assistant)........................................................................................................ 13 7.3. Analyse de Données et Engagement........................................................................................................... 13 7.4. Interaction et Collecte de Feedback............................................................................................................ 13 7.5.Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
VIII. TÂCHES DE LA FIRME........................................................................................................................... 14 8.1. Études techniques, cadrage et engagement des parties prenantes.................................................................. 14 8.2. Développement Full-Stack, IA et infrastructure Cloud................................................................................. 14 8.3. Pédagogie budgétaire et production de contenus multimédias...................................................................... 14 8.4. Stratégie médias sociaux et animation de communauté................................................................................ 14 8.5. Tests, qualité et sécurisation (QA & Security)............................................................................................. 15 8.6.
Source excerpt for this employer criterion
VIII. TÂCHES DE LA FIRME........................................................................................................................... 14 8.1. Études techniques, cadrage et engagement des parties prenantes.................................................................. 14 8.2. Développement Full-Stack, IA et infrastructure Cloud................................................................................. 14 8.3. Pédagogie budgétaire et production de contenus multimédias...................................................................... 14 8.4. Stratégie médias sociaux et animation de communauté................................................................................ 14 8.5. Tests, qualité et sécurisation (QA & Security)............................................................................................. 15 8.6.Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
IX. RÉSULTATS ATTENDUS............................................................................................................................. 15 9.1. Indicateurs d'engagement et de participation............................................................................................... 15 9.2. Capacités institutionnelles et pérennisation................................................................................................. 15
Source excerpt for this employer criterion
IX. RÉSULTATS ATTENDUS............................................................................................................................. 15 9.1. Indicateurs d'engagement et de participation............................................................................................... 15 9.2. Capacités institutionnelles et pérennisation................................................................................................. 15Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
X. LIVRABLES.................................................................................................................................................. 16 L1. Note de cadrage, étude de faisabilité et analyse comparative........................................................................ 16 L2. Plan d'engagement citoyen et protocole de gestion des feedbacks................................................................. 16 L3. Charte graphique, design UX/UI et stratégie de communication................................................................... 16 L4. Écosystème numérique et assistant IA opérationnels.................................................................................... 16 L5. Guide pédagogique et contenus multimédias de vulgarisation....................................................................... 16 L6.
Source excerpt for this employer criterion
X. LIVRABLES.................................................................................................................................................. 16 L1. Note de cadrage, étude de faisabilité et analyse comparative........................................................................ 16 L2. Plan d'engagement citoyen et protocole de gestion des feedbacks................................................................. 16 L3. Charte graphique, design UX/UI et stratégie de communication................................................................... 16 L4. Écosystème numérique et assistant IA opérationnels.................................................................................... 16 L5. Guide pédagogique et contenus multimédias de vulgarisation....................................................................... 16 L6.Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
XI. CALENDRIER D’EXÉCUTION................................................................................................................... 17
Source excerpt for this employer criterion
XI. CALENDRIER D’EXÉCUTION................................................................................................................... 17Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
XII. QUALIFICATIONS ET COMPÉTENCES REQUISES.............................................................................. 17
Source excerpt for this employer criterion
XII. QUALIFICATIONS ET COMPÉTENCES REQUISES.............................................................................. 17Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
XIII. PROPRIÉTÉ INTELLECTUELLE........................................................................................................... 19
Source excerpt for this employer criterion
XIII. PROPRIÉTÉ INTELLECTUELLE........................................................................................................... 19Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
XIV. CRITÈRES D'ÉVALUATION DES OFFRES............................................................................................. 19
Source excerpt for this employer criterion
XIV. CRITÈRES D'ÉVALUATION DES OFFRES............................................................................................. 19Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
XV. DÉLAIS ET MODALITÉS DE SOUMISSION............................................................................................ 19 15.1. Dossier de Candidature........................................................................................................................... 19
Source excerpt for this employer criterion
XV. DÉLAIS ET MODALITÉS DE SOUMISSION............................................................................................ 19 15.1. Dossier de Candidature........................................................................................................................... 19Source location: سامانه رسمی مناقصات تدارکاتی بانک جهانی — shortlisting / qualification criteria
Similar experience
No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.
Key personnel
No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.
Company financial capacity
No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.No explicit requirement in this category was stated in the notice, TOR or linked documents that were completely read.
Unstated means “not found in the official text currently available to FANAB”, not “not required”. Always verify the complete notice, TOR and addenda.
